206.303-2 Content.
(b)(i) In lieu of the threshold at FAR 6.303-2(b), each justification shall include the information at FAR 6.303-2(b), except for sole-source 8(a) contracts over $100 million (see paragraph (d) of this section).
(ii) Include the information required by PGI 206.303-2 (b)(i) in justifications citing the authority at FAR 6.302-1.
(d) In lieu of the threshold at FAR 6.303-2(d), each justification for a sole-source 8(a) contract over $100 million shall include the information at FAR 6.303-2(d).