CC-401 Types of Procurement Management Reviews.

(a) The PMR is a tiered program that includes the following types of assessments:

(1) Type 1: Reviews of Internal Controls (other than key internal controls) conducted by the Contracting Activity (CA) Management, as needed, using assessment methods in accordance with Command, CA, local or other applicable guidance.

(2) Type 2: Reviews of Key Internal Controls conducted by the HCAs and SCOs to Offices of the Directors of Contracting and other subordinate contracting offices, at least once every three years (36 months), using the Internal Control Question Set, and any supplemental question sets or toolkits.

(3) Type 3: Reviews of Internal/Key Internal Controls, conducted by the ODASA(P), as needed for special assistance reviews and assessments, on selected CAs and/or ACE-wide, using the applicable question set(s).

(4) Type 4: Reviews of Strategic Controls conducted by the ODASA(P), annually, using the Strategic Control Question Set for CAs across the ACE.

(b) Top-level information on review responsibility, method of assessment, frequency of assessment, and assessment instructions is provided in the table below.

Type

Control Type

Primary Responsibility for Control Assessment

Method of Assessment

Frequency of Control Assessment

Assessment Instructions

1

Internal Controls (Other than Key Controls

Contracting Activity (CA) Management

Business clearance, legal review, local policy and compliance reviews and self- assessments

Action-by-Action IAW CA

CA

2

Key Internal Controls

HCAs, SCOs

Internal Control Question Set

*Contingency Contracting Toolkit (as applicable)

At least once every three years (36 months)

AFARS Appendix CC

HCA

SCO Toolkit

Annually

AFARS Appendix CC

Per applicable policy

GPC Toolkit

Per applicable policy

AFARS Appendix EE

Per applicable policy

OSBP Toolkit

Per applicable policy

Per Army OSBP

Per applicable policy

OT Question Set

Per applicable policy

Per ODASA(P)

Per applicable policy

Assistance Awards

Question Set

Per applicable policy

Per ODASA(P)

3

Key Internal Controls

ODASA(P)

Internal Control Question Set

As required/requested

AFARS Appendix CC

4

Strategic Controls

ODASA(P)

Strategic Controls Toolkit

Annually

AFARS Appendix CC

*Contingency Contracting Toolkit

In conjunction with any PMR performed with continency contracting efforts/missions, the HCA shall utilize the Contingency Contracting Toolkit, located on the PMR SharePoint, to assess the key internal controls of their contingency contracting operations.