Subpart 970.52 - Solicitation Provisions and Contract Clauses for Management and Operating Contracts
970.5200 Scope of subpart.
This subpart prescribes some of the solicitation provisions and contract clauses for use in management and operating contracts. The provisions and clauses contained in this subpart supplement the provisions and clauses prescribed in the FAR and in other parts of the DEAR (48 CFR 901 through 48 CFR 952), and, pursuant to the individual provision or clause prescription, are to be used in addition to or in place of such clauses. Management and operating contracts are hybrid contracts, in some cases including aspects of several FAR contract types, for example, supplies and construction. For some FAR solicitation provisions and contract clauses, this subpart prescribes their use despite the hybrid nature of the work required. To assist Departmental contracting personnel in determining the applicability of FAR and DEAR clauses to management and operating contracts, additional guidance is published and made available by the Office of Procurement and Assistance Policy, within the Headquarters procurement organization.
970.5201 Text of provisions and clauses.
970.5203-1 Management controls.
As prescribed in 970.0370-2(a) and 970.3270(a)(4), insert the following clause:
Management Controls (JUN 2007)
(a)
(1) The Contractor shall be responsible for maintaining, as an integral part of its organization, effective systems of management controls for both administrative and programmatic functions. Management controls comprise the plan of organization, methods, and procedures adopted by management to reasonably ensure that: the mission and functions assigned to the Contractor are properly executed; efficient and effective operations are promoted including consideration of outsourcing of functions; resources are safeguarded against waste, loss, mismanagement, unauthorized use, or misappropriation; all encumbrances and costs that are incurred under the contract and fees that are earned are in compliance with applicable clauses and other current terms, conditions, and intended purposes; all collections accruing to the Contractor in connection with the work under this contract, expenditures, and all other transactions and assets are properly recorded, managed, and reported; and financial, statistical, and other reports necessary to maintain accountability and managerial control are accurate, reliable, and timely.
(2) The systems of controls employed by the Contractor shall be documented and satisfactory to DOE.
(3) Such systems shall be an integral part of the Contractor's management functions, including defining specific roles and responsibilities for each level of management, and holding employees accountable for the adequacy of the management systems and controls in their areas of assigned responsibility.
(4) The Contractor shall, as part of the internal audit program required elsewhere in this contract, periodically review the management systems and controls employed in programs and administrative areas to ensure that they are adequate to provide reasonable assurance that the objectives of the systems are being accomplished and that these systems and controls are working effectively. Annually, or at other intervals directed by the Contracting Officer, the Contractor shall supply to the Contracting Officer copies of the reports reflecting the status of recommendations resulting from management audits performed by its internal audit activity and any other audit organization. This requirement may be satisfied in part by the reports required under paragraph
(i) of 48 CFR 970.5232-3, Accounts, records, and inspection.
(b) The Contractor shall be responsible for maintaining, as a part of its operational responsibilities, a baseline quality assurance program that implements documented performance, quality standards, and control and assessment techniques.
(End of clause)
970.5203-2 Performance improvement and collaboration.
As prescribed in 970.0370-2(b), insert the following clause:
Performance Improvement and Collaboration (MAY 2006)
(a) The Contractor agrees that it shall affirmatively identify, evaluate, and institute practices, where appropriate, that will improve performance in the areas of environmental and health, safety, scientific and technical, security, business and administrative, and any other areas of performance in the management and operation of the contract. This may entail the alteration of existing practices or the institution of new procedures to more effectively or efficiently perform any aspect of contract performance or reduce overall cost of operation under the contract. Such improvements may result from changes in organization, outsourcing decisions, simplification of systems while retaining necessary controls, or any other approaches consistent with the statement of work and performance measures of this contract.
(b) The Contractor agrees to work collaboratively with the Department, all other management and operating, DOE major facilities management contractors and affiliated contractors which manage or operate DOE sites or facilities for the following purposes: (i) to exchange information generally, (ii) to evaluate concepts that may be of benefit in resolving common issues, in confronting common problems, or in reducing costs of operations, and (iii) to otherwise identify and implement DOE-complex-wide management improvements discussed in paragraph (a). In doing so, it shall also affirmatively provide information relating to its management improvements to such contractors, including lessons learned, subject to security considerations and the protection of data proprietary to third parties.
(c) The Contractor may consult with the Contracting Officer in those instances in which improvements being considered pursuant to paragraph (a) involve the cooperation of the DOE. The Contractor may request the assistance of the Contracting Officer in the communication of the success of improvements to other management and operating contractors in accordance with paragraph (b) of this clause.
(d) The Contractor shall notify the Contracting Officer and seek approval where necessary to fulfill its obligations under the contract. Compliance with this clause in no way alters the obligations of the Contractor under any other provision of this contract.
(End of clause)
970.5203-3 Contractor's organization.
As prescribed in 970.0371-9, insert the following clause:
Contractor's Organization (DEC 2000)
(a) Organization chart. As promptly as possible after the execution of this contract, the Contractor shall furnish to the Contracting Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be employed in connection with the work, and shall furnish supplemental information to reflect any changes as they occur.
(b) Supervisory representative of Contractor. Unless otherwise directed by the Contracting Officer, a competent full-time resident supervisory representative of the Contractor satisfactory to the Contracting Officer shall be in charge of the work at the site, and any work off-site, at all times.
(c) Control of employees. The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action with respect to its employees as may be necessary. In the event the Contractor fails to remove any employee from the contract work whom DOE deems incompetent, careless, or insubordinate, or whose continued employment on the work is deemed by DOE to be inimical to the Department's mission, the Contracting Officer may require, with the approval of the Secretary of Energy, the Contractor to remove the employee from work under the contract. This includes the right to direct the Contractor to remove its most senior key person from work under the contract for serious contract performance deficiencies.
(d) Standards and procedures. The Contractor shall establish such standards and procedures as are necessary to implement the requirements set forth in 48 CFR 970.0371. Such standards and procedures shall be subject to the approval of the Contracting Officer.
(End of clause)
970.5204-1 Counterintelligence.
(a) As prescribed in 970.0404-4(a), insert the following clause in contracts containing the clauses at 952.204-2, Security, and 952.204-70, Classification/Declassification:
Counterintelligence (DEC 2010)
(a) The Contractor shall take all reasonable precautions in the work under this contract to protect DOE programs, facilities, technology, personnel, unclassified sensitive information and classified matter from foreign intelligence threats and activities conducted for governmental or industrial purposes, in accordance with DOE Order 475.1, Counterintelligence Program, or its successor; Executive Order 12333, U.S. Intelligence Activities; and other pertinent national and Departmental Counterintelligence requirements.
(b) The Contractor shall appoint a qualified employee(s) to function as the Contractor Counterintelligence Officer. The Contractor Counterintelligence Officer will be responsible for conducting defensive Counterintelligence briefings and debriefings of employees traveling to foreign countries or interacting with foreign nationals; providing thoroughly documented written reports relative to targeting, suspicious activity and other matters of Counterintelligence interest; immediately reporting targeting, suspicious activity and other Counterintelligence concerns to the DOE Headquarters Counterintelligence Division; and providing assistance to other elements of the U.S. Intelligence Community as stated in the aforementioned Executive Order, the DOE Counterintelligence Order, and other pertinent national and Departmental Counterintelligence requirements.
(End of clause)
970.5204-2 Laws, regulations, and DOE directives.
As prescribed in 970.0470-2, insert the following clause:
Laws, Regulations, and DOE Directives (DEC 2000)
(a) In performing work under this contract, the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations (including DOE regulations), unless relief has been granted in writing by the appropriate regulatory agency. A List of Applicable Laws and regulations (List A) may be appended to this contract for information purposes. Omission of any applicable law or regulation from List A does not affect the obligation of the Contractor to comply with such law or regulation pursuant to this paragraph.
(b) In performing work under this contract, the Contractor shall comply with the requirements of those Department of Energy directives, or parts thereof, identified in the List of Applicable Directives (List B) appended to this contract. Except as otherwise provided for in paragraph (d) of this clause, the Contracting Officer may, from time to time and at any time, revise List B by unilateral modification to the contract to add, modify, or delete specific requirements. Prior to revising List B, the Contracting Officer shall notify the Contractor in writing of the Department's intent to revise List B and provide the Contractor with the opportunity to assess the effect of the Contractor's compliance with the revised list on contract cost and funding, technical performance, and schedule; and identify any potential inconsistencies between the revised list and the other terms and conditions of the contract. Within 30 days after receipt of the Contracting Officer's notice, the Contractor shall advise the Contracting Officer in writing of the potential impact of the Contractor's compliance with the revised list. Based on the information provided by the Contractor and any other information available, the Contracting Officer shall decide whether to revise List B and so advise the Contractor not later than 30 days prior to the effective date of the revision of List B. The Contractor and the Contracting Officer shall identify and, if appropriate, agree to any changes to other contract terms and conditions, including cost and schedule, associated with the revision of List B pursuant to the clause of this contract entitled, “Changes.”
(c) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under this contract may be determined by a DOE approved process to evaluate the work and the associated hazards and identify an appropriately tailored set of standards, practices, and controls, such as a tailoring process included in a DOE approved Safety Management System implemented under the clause entitled “Integration of Environment, Safety, and Health into Work Planning and Execution.” When such a process is used, the set of tailored (ES&H) requirements, as approved by DOE pursuant to the process, shall be incorporated into List B as contract requirements with full force and effect. These requirements shall supersede, in whole or in part, the contractual environmental, safety, and health requirements previously made applicable to the contract by List B. If the tailored set of requirements identifies an alternative requirement varying from an ES&H requirement of an applicable law or regulation, the Contractor shall request an exemption or other appropriate regulatory relief specified in the regulation.
(d) Except as otherwise directed by the Contracting Officer, the Contractor shall procure all necessary permits or licenses required for the performance of work under this contract.
(e) Regardless of the performer of the work, the Contractor is responsible for compliance with the requirements of this clause. The Contractor is responsible for flowing down the requirements of this clause to subcontracts at any tier to the extent necessary to ensure the Contractor's compliance with the requirements.
(End of clause)
970.5204-3 Access to and ownership of records.
As prescribed in 970.0407-1-3, insert the following clause:
Access to and Ownership of Records (OCT 2014)
(a) Government-owned records. Except as provided in paragraph (b) of this clause, all records acquired or generated by the contractor in its performance of this contract, including records series described within the contract as Privacy Act systems of records, shall be the property of the Government and shall be maintained in accordance with 36 CFR, Chapter XII, Subchapter B, “Records Management.” The contractor shall ensure records classified as Privacy Act system of records are maintained in accordance with FAR 52.224.2 “Privacy Act.”
(b) Contractor-owned records. The following records are considered the property of the contractor and are not within the scope of paragraph (a) of this clause. [The contracting officer shall identify which of the following categories of records will be included in the clause, excluding records operated and maintained in DOE Privacy Act system of records].
(1) Employment-related records (such as worker's compensation files; employee relations records, records on salary and employee benefits; drug testing records, labor negotiation records; records on ethics, employee concerns; records generated during the course of responding to allegations of research misconduct; records generated during other employee related investigations conducted under an expectation of confidentiality; employee assistance program records; and personnel and medical/health-related records and similar files), and non-employee patient medical/health-related records, excluding records operated and maintained by the Contractor in Privacy Act system of records. Employee-related systems of record may include, but are not limited to: Employee Relations Records (DOE-3), Personnel Records of Former Contractor Employees (DOE-5), Payroll and Leave Records (DOE-13), Report of Compensation (DOE-14), Personnel Medical Records (DOE-33), Employee Assistance Program (EAP) Records (DOE-34) and Personnel Radiation Exposure Records (DOE-35).
(2) Confidential contractor financial information, internal corporate governance records and correspondence between the contractor and other segments of the contractor located away from the DOE facility (i.e., the contractor's corporate headquarters);
(3) Records relating to any procurement action by the contractor, except for records that under 48 CFR 970.5232-3 are described as the property of the Government; and
(4) Legal records, including legal opinions, litigation files, and documents covered by the attorney-client and attorney work product privileges; and
(5) The following categories of records maintained pursuant to the technology transfer clause of this contract:
(i) Executed license agreements, including exhibits or appendices containing information on royalties, royalty rates, other financial information, or commercialization plans, and all related documents, notes and correspondence.
(ii) The contractor's protected Cooperative Research and Development Agreement (CRADA) information and appendices to a CRADA that contain licensing terms and conditions, or royalty or royalty rate information.
(iii) Patent, copyright, mask work, and trademark application files and related contractor invention disclosures, documents and correspondence, where the contractor has elected rights or has permission to assert rights and has not relinquished such rights or turned such rights over to the Government.
(c) Contract completion or termination. Upon contract completion or termination, the contractor shall ensure final disposition of all Government-owned records to a Federal Record Center, the National Archives and Records Administration, to a successor contractor, its designee, or other destinations, as directed by the Contracting Officer. Upon the request of the Government, the contractor shall provide either the original contractor-owned records or copies of the records identified in paragraph (b) of this clause, to DOE or its designees, including successor contractors. Upon delivery, title to such records shall vest in DOE or its designees, and such records shall be protected in accordance with applicable federal laws (including the Privacy Act) as appropriate. If the contractor chooses to provide its original contractor-owned records to the Government or its designee, the contractor shall retain future rights to access and copy such records as needed.
(d) Inspection, copying, and audit of records. All records acquired or generated by the Contractor under this contract in the possession of the Contractor, including those described at paragraph (b) of this clause, shall be subject to inspection, copying, and audit by the Government or its designees at all reasonable times, and the Contractor shall afford the Government or its designees reasonable facilities for such inspection, copying, and audit; provided, however, that upon request by the Contracting Officer, the Contractor shall deliver such records to a location specified by the Contracting Officer for inspection, copying, and audit. The Government or its designees shall use such records in accordance with applicable federal laws (including the Privacy Act), as appropriate.
(e) Applicability. This clause applies to all records created, received and maintained by the contractor without regard to the date or origination of such records including all records acquired from a predecessor contractor.
(f) Records maintenance and retention. Contractor shall create, maintain, safeguard, and disposition records in accordance with 36 CFR Chapter XII, Subchapter B, “Records Management” and the National Archives and Records Administration (NARA)-approved Records Disposition Schedules. Records retention standards are applicable for all classes of records, whether or not the records are owned by the Government or the contractor. The Government may waive application of the NARA-approved Records Disposition Schedules, if, upon termination or completion of the contract, the Government exercises its right under paragraph (c) of this clause to obtain copies of records described in paragraph (b) and delivery of records described in paragraph (a) of this clause.
(g) Subcontracts. The contractor shall include the requirements of this clause in all subcontracts that contain the Integration of Environment, Safety and Health into Work Planning and Execution clause at 952.223-71 or, the Radiation Protection and Nuclear Criticality clause at 952.223-72.
(End of clause)
970.5208-1 Printing.
As prescribed in 970.0808-3, insert the following clause:
Printing (DEC 2000)
(a) To the extent that duplicating or printing services may be required in the performance of this contract, the Contractor shall provide or secure such services in accordance with the Government Printing and Binding Regulations, Title 44 of the U.S. Code, and DOE Directives relative thereto.
(b) The term “Printing” includes the following processes: Composition, platemaking, presswork, binding, microform publishing, or the end items produced by such processes. Provided, however, that performance of a requirement under this contract involving the duplication of less than 5,000 copies of a single page, or no more than 25,000 units in the aggregate of multiple pages, will not be deemed to be printing.
(c) Printing services not obtained in compliance with this guidance shall result in the cost of such printing being disallowed.
(d) The Contractor shall include the substance of this clause in all subcontracts hereunder which require printing (as that term is defined in Title I of the U.S. Government Printing and Binding Regulations).
(End of clause)
970.5209-1 Requirement for guarantee of performance.
As prescribed in 970.0970-2, the contracting officer shall insert the following provision in solicitations for management and operating contracts:
Requirement for Guarantee of Performance (DEC 2000)
The successful offeror is required by other provisions of this solicitation to organize a dedicated corporate entity to carry out the work under the contract to be awarded as a result of this solicitation. The successful offeror will be required, as part of the determination of responsibility of the newly organized, dedicated corporate entity and as a condition of the award of the contract to that entity, to furnish a guarantee of that entity's performance. That guarantee of performance must be satisfactory in all respects to the Department of Energy.
(End of clause)
970.5211-1 Work authorization.
As prescribed in 970.1170-2, insert the following clause:
Work Authorization (MAY 2007)
(a) Work authorization proposal. Prior to the start of each fiscal year, the Contracting Officer or designee shall provide the Contractor with program execution guidance in sufficient detail to enable the Contractor to develop an estimated cost, scope, and schedule. In addition, the Contracting Officer may unilaterally assign work. The Contractor shall submit to the Contracting Officer or other designated official, a detailed description of work, a budget of estimated costs, and a schedule of performance for the work it recommends be undertaken during that upcoming fiscal year.
(b) Cost estimates. The Contractor and the Contracting Officer shall establish a budget of estimated costs, description of work, and schedule of performance for each work assignment. If agreement cannot be reached as to scope, schedule, and estimated cost, the Contracting Officer may issue a unilateral work authorization, pursuant to this clause. The work authorization, whether issued bilaterally or unilaterally shall become part of the contract. No activities shall be authorized or costs incurred prior to Contracting Officer issuance of a work authorization or direction concerning continuation of activities of the contract.
(c) Performance. The Contractor shall perform work as specified in the work authorization, consistent with the terms and conditions of this contract.
(d) Modification. The Contracting Officer may at any time, without notice, issue changes to work authorizations within the overall scope of the contract. A proposal for adjustment in estimated costs and schedule for performance of work, recognizing work made unnecessary as a result, along with new work, shall be submitted by the Contractor in accordance with paragraph (a) of this clause. Resolution shall be in accordance with paragraph (b) of this clause.
(e) Increase in estimated cost. The Contractor shall notify the Contracting Officer immediately whenever the cost incurred, plus the projected cost to complete work is projected to differ (plus or minus) from the estimate by 10 percent. The Contractor shall submit a proposal for modification in accordance with paragraph (a) of this clause. Resolution shall be in accordance with paragraph (b) of this clause.
(f) Expenditure of funds and incurrence of costs. The expenditure of monies by the Contractor in the performance of all authorized work shall be governed by the “Obligation of Funds” or equivalent clause of the contract.
(g) Responsibility to achieve environment, safety, health, and security compliance. Notwithstanding other provisions of the contract, the Contractor may, in the event of an emergency, take that corrective action necessary to sustain operations consistent with applicable environmental, safety, health, and security statutes, regulations, and procedures. If such action is taken, the Contractor shall notify the Contracting Officer within 24 hours of initiation and, within 30 days, submit a proposal for adjustment in estimated costs and schedule established in accordance with paragraphs (a) and (b) of this clause.
(End of clause)
970.5215-1 Total available fee: Base fee amount and performance fee amount.
As prescribed in 970.1504-5(a), insert the following clause. The clause should be tailored to reflect the contract's actual inclusion of base fee amount and performance fee amount.
Total Available Fee: Base Fee Amount and Performance Fee Amount (DEC 2000)
(a) Total available fee. Total available fee, consisting of a base fee amount (which may be zero) and a performance fee amount (consisting of an incentive fee component for objective performance requirements, an award fee component for subjective performance requirements, or both) determined in accordance with the provisions of this clause, is available for payment in accordance with the clause of this contract entitled, “Payments and advances.”
(b) Fee negotiations. Prior to the beginning of each fiscal year under this contract, or other appropriate period as mutually agreed upon and, if exceeding one year, approved by the Senior Procurement Executive, or designee, the Contracting Officer and Contractor shall enter into negotiation of the requirements for the year or appropriate period, including the evaluation areas and individual requirements subject to incentives, the total available fee, and the allocation of fee. The Contracting Officer shall modify this contract at the conclusion of each negotiation to reflect the negotiated requirements, evaluation areas and individual requirements subject to incentives, the total available fee, and the allocation of fee. In the event the parties fail to agree on the requirements, the evaluation areas and individual requirements subject to incentives, the total available fee, or the allocation of fee, a unilateral determination will be made by the Contracting Officer. The total available fee amount shall be allocated to a twelve month cycle composed of one or more evaluation periods, or such longer period as may be mutually agreed to between the parties and approved by the Senior Procurement Executive, or designee.
(c) Determination of total available fee amount earned.
(1) The Government shall, at the conclusion of each specified evaluation period, evaluate the Contractor's performance of all requirements, including performance based incentives completed during the period, and determine the total available fee amount earned. At the Contracting Officer's discretion, evaluation of incentivized performance may occur at the scheduled completion of specific incentivized requirements.
(2) The DOE Operations/Field Office Manager, or designee, will be (insert title of DOE Operations/Field Office Manager, or designee). The Contractor agrees that the determination as to the total available fee earned is a unilateral determination made by the DOE Operations/Field Office Manager, or designee.
(3) The evaluation of Contractor performance shall be in accordance with the Performance Evaluation and Measurement Plan(s) described in subparagraph (d) of this clause unless otherwise set forth in the contract. The Contractor shall be promptly advised in writing of the fee determination, and the basis of the fee determination. In the event that the Contractor's performance is considered to be less than the level of performance set forth in the Statement of Work, as amended to include the current Work Authorization Directive or similar document, for any contract requirement, it will be considered by the DOE Operations/Field Office Manager, or designee, who may at his/her discretion adjust the fee determination to reflect such performance. Any such adjustment shall be in accordance with the clause entitled, “Conditional Payment of Fee, Profit, and Other Incentives - Facility Management Contracts” if contained in the contract.
(d) Performance evaluation and measurement plan(s). To the extent not set forth elsewhere in the contract:
(1) The Government shall establish a Performance Evaluation and Measurement Plan(s) upon which the determination of the total available fee amount earned shall be based. The Performance Evaluation and Measurement Plan(s) will address all of the requirements of contract performance specified in the contract directly or by reference. A copy of the Performance Evaluation and Measurement Plan(s) shall be provided to the Contractor -
(i) Prior to the start of an evaluation period if the requirements, evaluation areas, specific incentives, amount of fee, and allocation of fee to such evaluation areas and specific incentives have been mutually agreed to by the parties; or
(ii) Not later than thirty days prior to the scheduled start date of the evaluation period, if the requirements, evaluation areas, specific incentives, amount of fee, and allocation of fee to such evaluation areas and specific incentives have been unilaterally established by the Contracting Officer.
(2) The Performance Evaluation and Measurement Plan(s) will set forth the criteria upon which the Contractor will be evaluated relating to any technical, schedule, management, and/or cost objectives selected for evaluation. Such criteria should be objective, but may also include subjective criteria. The Plan(s) shall also set forth the method by which the total available fee amount will be allocated and the amount earned determined.
(3) The Performance Evaluation and Measurement Plan(s) may, consistent with the contract statement of work, be revised during the period of performance. The Contracting Officer shall notify the contractor -
(i) Of such unilateral changes at least ninety calendar days prior to the end of the affected evaluation period and at least thirty calendar days prior to the effective date of the change;
(ii) Of such bilateral changes at least sixty calendar days prior to the end of the affected evaluation period; or
(iii) If such change, whether unilateral or bilateral, is urgent and high priority, at least thirty calendar days prior to the end of the evaluation period.
(e) Schedule for total available fee amount earned determinations. The DOE Operations/Field Office Manager, or designee, shall issue the final total available fee amount earned determination in accordance with: the schedule set forth in the Performance Evaluation and Measurement Plan(s); or as otherwise set forth in this contract . However, a determination must be made within sixty calendar days after the receipt by the Contracting Officer of the Contractor's self-assessment, if one is required or permitted by paragraph (f) of this clause, or seventy calendar days after the end of the evaluation period, whichever is later, or a longer period if the Contractor and Contracting Officer agree. If the Contracting Officer evaluates the Contractor's performance of specific requirements on their completion, the payment of any earned fee amount must be made within seventy calendar days (or such other time period as mutually agreed to between the Contracting Officer and the Contractor) after such completion. If the determination is delayed beyond that date, the Contractor shall be entitled to interest on the determined total available fee amount earned at the rate established by the Secretary of the Treasury under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611) that is in effect on the payment date. This rate is referred to as the “Renegotiation Board Interest Rate,” and is published in the Federal Register semiannually on or about January 1 and July 1. The interest on any late total available fee amount earned determination will accrue daily and be compounded in 30-day increments inclusive from the first day after the schedule determination date through the actual date the determination is issued. That is, interest accrued at the end of any 30-day period will be added to the determined amount of fee earned and be subject to interest if not paid in the succeeding 30-day period.
(End of clause)
Alternate I (DEC 2000). As prescribed in 970.1504-5(a)(1), when the award fee cycle consists of two or more evaluation periods, add the following to paragraph (c):
(4) At the sole discretion of the Government, unearned total available fee amounts may be carried over from one evaluation period to the next, so long as the periods are within the same award fee cycle.
Alternate II (DEC 2000). As prescribed in 970.1504-5(a)(2), when the award fee cycle consists of one evaluation period, add the following to paragraph (c):
(4) Award fee not earned during the evaluation period shall not be allocated to future evaluation periods.
Alternate III (DEC 2000). As prescribed in 970.1504-5(a)(3), when the DOE Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment, add the following as paragraph (f):
(f) Contractor self-assessment. Following each evaluation period, the Contractor shall submit a self-assessment within (Insert Number) calendar days after the end of the period. This self-assessment shall address both the strengths and weaknesses of the Contractor's performance during the evaluation period. Where deficiencies in performance are noted, the Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The DOE Operations/Field Office Manager, or designee, will review the Contractor's self-assessment, if submitted, as part of its independent evaluation of the Contractor's management during the period. A self-assessment, in and of itself may not be the only basis for the award fee determination.
Alternate IV (DEC 2000). As prescribed in 970.1504-5(a)(4), when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option, add the following text as paragraph (f):
(f) Contractor self-assessment. Following each evaluation period, the Contractor may submit a self-assessment, provided such assessment is submitted within (Insert Number) calendar days after the end of the period. This self-assessment shall address both the strengths and weaknesses of the Contractor's performance during the evaluation period. Where deficiencies in performance are noted, the Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The DOE Operations/Field Office Manager, or designee, will review the Contractor's self-assessment, if submitted, as part of its independent evaluation of the Contractor's management during the period. A self-assessment, in and of itself may not be the only basis for the award fee determination.
970.5215-2 [Reserved]
970.5215-3 Conditional payment of fee, profit, and other incentives - facility management contracts
As prescribed in 970.1504-5(b)(1), insert the following clause:
Conditional Payment of Fee, Profit, and Other Incentives - Facility Management Contracts (AUG 2009)
(a) General.
(1) The payment of earned fee, fixed fee, profit, or share of cost savings under this contract is dependent upon -
(i) The Contractor's or Contractor employees' compliance with the terms and conditions of this contract relating to environment, safety and health (ES&H), which includes worker safety and health (WS&H), including performance under an approved Integrated Safety Management System (ISMS); and
(ii) The Contractor's or Contractor employees' compliance with the terms and conditions of this contract relating to the safeguarding of Restricted Data and other classified information.
(2) The ES&H performance requirements of this contract are set forth in its ES&H terms and conditions, including the DOE approved contractor ISMS or similar document. Financial incentives for timely mission accomplishment or cost effectiveness shall never compromise or impede full and effective implementation of the ISMS and full ES&H compliance.
(3) The performance requirements of this contract relating to the safeguarding of Restricted Data and other classified information are set forth in the clauses of this contract entitled, “Security” and “Laws, Regulations, and DOE Directives,” as well as in other terms and conditions.
(4) If the Contractor does not meet the performance requirements of this contract relating to ES&H or to the safeguarding of Restricted Data and other classified information during any performance evaluation period established under the contract pursuant to the clause of this contract entitled, “Total Available Fee: Base Fee Amount and Performance Fee Amount,” otherwise earned fee, fixed fee, profit or share of cost savings may be unilaterally reduced by the contracting officer.
(b) Reduction amount.
(1) The amount of earned fee, fixed fee, profit, or share of cost savings that may be unilaterally reduced will be determined by the severity of the performance failure pursuant to the degrees specified in paragraphs (c) and (d) of this clause.
(2) If a reduction of earned fee, fixed fee, profit, or share of cost savings is warranted, unless mitigating factors apply, such reduction shall not be less than 26 percent nor greater than 100 percent of the amount of earned fee, fixed fee, profit, or the Contractor's share of cost savings for a first degree performance failure, not less than 11 percent nor greater than 25 percent for a second degree performance failure, and up to 10 percent for a third degree performance failure.
(3) In determining the amount of the reduction and the applicability of mitigating factors, the contracting officer must consider the Contractor's overall performance in meeting the ES&H or security requirements of the contract. Such consideration must include performance against any site specific performance criteria/requirements that provide additional definition, guidance for the amount of reduction, or guidance for the applicability of mitigating factors. In all cases, the contracting officer must consider mitigating factors that may warrant a reduction below the applicable range (see 48 CFR 970.1504-1-2). The mitigating factors include, but are not limited to, the following ((v), (vi), (vii) and (viii) apply to ES&H only).
(i) Degree of control the Contractor had over the event or incident.
(ii) Efforts the Contractor had made to anticipate and mitigate the possibility of the event in advance.
(iii) Contractor self-identification and response to the event to mitigate impacts and recurrence.
(iv) General status (trend and absolute performance) of: ES&H and compliance in related areas; or of safeguarding Restricted Data and other classified information and compliance in related areas.
(v) Contractor demonstration to the Contracting Officer's satisfaction that the principles of industrial ES&H standards are routinely practiced (e.g., Voluntary Protection Program, ISO 14000).
(vi) Event caused by “Good Samaritan” act by the Contractor (e.g., offsite emergency response).
(vii) Contractor demonstration that a performance measurement system is routinely used to improve and maintain ES&H performance (including effective resource allocation) and to support DOE corporate decision-making (e.g., policy, ES&H programs). * * *
(viii) Contractor demonstration that an Operating Experience and Feedback Program is functioning that demonstrably affects continuous improvement in ES&H by use of lessons-learned and best practices inter- and intra-DOE sites.
(4)
(i) The amount of fee, fixed fee, profit, or share of cost savings that is otherwise earned by a contractor during an evaluation period may be reduced in accordance with this clause if it is determined that a performance failure warranting a reduction under this clause occurs within the evaluation period.
(ii) The amount of reduction under this clause, in combination with any reduction made under any other clause in the contract, shall not exceed the amount of fee, fixed fee, profit, or the Contractor's share of cost savings that is otherwise earned during the evaluation period.
(iii) For the purposes of this clause, earned fee, fixed fee, profit, or share of cost savings for the evaluation period shall mean the amount determined by the Contracting Officer or fee determination official as otherwise payable based on the Contractor's performance during the evaluation period. Where the contract provides for financial incentives that extend beyond a single evaluation period, this amount shall also include: any provisional amounts determined otherwise payable in the evaluation period; and, if provisional payments are not provided for, the allocable amount of any incentive determined otherwise payable at the conclusion of a subsequent evaluation period. The allocable amount shall be the total amount of the earned incentive divided by the number of evaluation periods over which it was earned.
(iv) The Government will effect the reduction as soon as practicable after the end of the evaluation period in which the performance failure occurs. If the Government is not aware of the failure, it will effect the reduction as soon as practical after becoming aware. For any portion of the reduction requiring an allocation the Government will effect the reduction at the end of the evaluation period in which it determines the total amount earned under the incentive. If at any time a reduction causes the sum of the payments the Contractor has received for fee, fixed fee, profit, or share of cost savings to exceed the sum of fee, fixed fee, profit, or share of cost savings the Contractor has earned (provisionally or otherwise), the Contractor shall immediately return the excess to the Government. (What the Contractor “has earned” reflects any reduction made under this or any other clause of the contract.)
(v) At the end of the contract -
(A) The Government will pay the Contractor the amount by which the sum of fee, fixed fee, profit, or share of cost savings the Contractor has earned exceeds the sum of the payments the Contractor has received; or
(B) The Contractor shall return to the Government the amount by which the sum of the payments the Contractor has received exceeds the sum of fee, fixed fee, profit, or share of cost savings the Contractor has earned. (What the Contractor “has earned” reflects any reduction made under this or any other clause of the contract.)
(c) Environment, Safety and Health (ES&H). Performance failures occur if the Contractor does not comply with the contract's ES&H terms and conditions, including the DOE approved Contractor ISMS. The degrees of performance failure under which reductions of earned or fixed fee, profit, or share of cost savings will be determined are:
(1) First Degree: Performance failures that are most adverse to ES&H. Failure to develop and obtain required DOE approval of an ISMS is considered first degree. The Government will perform necessary review of the ISMS in a timely manner and will not unreasonably withhold approval of the Contractor's ISMS. The following performance failures or performance failures of similar import will be considered first degree.
(i) Type A accident (defined in DOE Order 225.1B, or successor version).
(ii) Two Second Degree performance failures during an evaluation period.
(2) Second Degree: Performance failures that are significantly adverse to ES&H. They include failures to comply with an approved ISMS that result in an actual injury, exposure, or exceedence that occurred or nearly occurred but had minor practical long-term health consequences. They also include breakdowns of the Safety Management System. The following performance failures or performance failures of similar import will be considered second degree:
(i) Type B accident (defined in DOE Order 225.1B, or successor version).
(ii) Non-compliance with an approved ISMS that results in a near miss of a Type A or B accident. A near miss is a situation in which an inappropriate action occurs, or a necessary action is omitted, but does not result in an adverse effect.
(iii) Failure to mitigate or notify DOE of an imminent danger situation after discovery, where such notification is a requirement of the contract.
(3) Third Degree: Performance failures that reflect a lack of focus on improving ES&H. They include failures to comply with an approved ISMS that result in potential breakdown of the System. The following performance failures or performance failures of similar import will be considered third degree:
(i) Failure to implement effective corrective actions to address deficiencies/non-compliances documented through: external (e.g., Federal) oversight and/or reported per DOE Order 232.1-2 requirements; or internal oversight of DOE Order 440.1A requirements.
(ii) Multiple similar non-compliances identified by external (e.g., Federal) oversight that in aggregate indicate a significant programmatic breakdown.
(iii) Non-compliances that either have, or may have, significant negative impacts to the worker, the public, or the environment or that indicate a significant programmatic breakdown.
(iv) Failure to notify DOE upon discovery of events or conditions where notification is required by the terms and conditions of the contract.
(d) Safeguarding restricted data and other classified information. Performance failures occur if the Contractor does not comply with the terms and conditions of this contract relating to the safeguarding of Restricted Data and other classified information. The degrees of performance failure under which reductions of fee, profit, or share of cost savings will be determined are as follows:
(1) First Degree: Performance failures that have been determined, in accordance with applicable law, DOE regulation, or directive, to have resulted in, or that can reasonably be expected to result in, exceptionally grave damage to the national security. The following are examples of performance failures or performance failures of similar import that will be considered first degree:
(i) Non-compliance with applicable laws, regulations, and DOE directives actually resulting in, or creating a risk of, loss, compromise, or unauthorized disclosure of Top Secret Restricted Data or other information classified as Top Secret, any classification level of information in a Special Access Program (SAP), information identified as sensitive compartmented information (SCI), or high risk nuclear weapons-related data.
(ii) Contractor actions that result in a breakdown of the safeguards and security management system that can reasonably be expected to result in the loss, compromise, or unauthorized disclosure of Top Secret Restricted Data, or other information classified as Top Secret, any classification level of information in a SAP, information identified as SCI, or high risk nuclear weapons-related data.
(iii) Failure to promptly report the loss, compromise, or unauthorized disclosure of Top Secret Restricted Data, or other information classified as Top Secret, any classification level of information in a SAP, information identified as SCI, or high risk nuclear weapons-related data.
(iv) Failure to timely implement corrective actions stemming from the loss, compromise, or unauthorized disclosure of Top Secret Restricted Data or other information classified as Top Secret, any classification level of information in a SAP, information identified as SCI, or high risk nuclear weapons-related data.
(2) Second Degree: Performance failures that have been determined, in accordance with applicable law, DOE regulation, or directive, to have actually resulted in, or that can reasonably be expected to result in, serious damage to the national security. The following are examples of performance failures or performance failures of similar import that will be considered second degree:
(i) Non-compliance with applicable laws, regulations, and DOE directives actually resulting in, or creating risk of, loss, compromise, or unauthorized disclosure of Secret Restricted Data or other information classified as Secret.
(ii) Contractor actions that result in a breakdown of the safeguards and security management system that can reasonably be expected to result in the loss, compromise, or unauthorized disclosure of Secret Restricted Data, or other information classified as Secret.
(iii) Failure to promptly report the loss, compromise, or unauthorized disclosure of Restricted Data or other classified information regardless of classification (except for information covered by paragraph (d)(1)(iii) of this clause).
(iv) Failure to timely implement corrective actions stemming from the loss, compromise, or unauthorized disclosure of Secret Restricted Data or other classified information classified as Secret.
(3) Third Degree: Performance failures that have been determined, in accordance with applicable law, regulation, or DOE directive, to have actually resulted in, or that can reasonably be expected to result in, undue risk to the common defense and security. In addition, this category includes performance failures that result from a lack of Contractor management and/or employee attention to the proper safeguarding of Restricted Data and other classified information. These performance failures may be indicators of future, more severe performance failures and/or conditions, and if identified and corrected early would prevent serious incidents. The following are examples of performance failures or performance failures of similar import that will be considered third degree:
(i) Non-compliance with applicable laws, regulations, and DOE directives actually resulting in, or creating risk of, loss, compromise, or unauthorized disclosure of Restricted Data or other information classified as Confidential.
(ii) Failure to promptly report alleged or suspected violations of laws, regulations, or directives pertaining to the safeguarding of Restricted Data or other classified information.
(iii) Failure to identify or timely execute corrective actions to mitigate or eliminate identified vulnerabilities and reduce residual risk relating to the protection of Restricted Data or other classified information in accordance with the Contractor's Safeguards and Security Plan or other security plan, as applicable.
(iv) Contractor actions that result in performance failures which unto themselves pose minor risk, but when viewed in the aggregate indicate degradation in the integrity of the Contractor's safeguards and security management system relating to the protection of Restricted Data and other classified information.
(End of clause)
Alternate I (AUG 2009). As prescribed in 970.1504-5(b)(2), replace paragraphs (a), (b)(1), (b)(2), and (b)(3) of the basic clause with the following paragraphs (a), (b)(1), (b)(2), and (b)(3) and delete paragraph (d).
(a) General.
(1) The payment of earned fee, fixed fee, profit, or share of cost savings under this contract is dependent upon the Contractor's or Contractor employees' compliance with the terms and conditions of this contract relating to environment, safety and health (ES&H), which includes worker safety and health (WS&H), including performance under an approved Integrated Safety Management System (ISMS).
(2) The ES&H performance requirements of this contract are set forth in its ES&H terms and conditions, including the DOE approved contractor ISMS or similar document. Financial incentives for timely mission accomplishment or cost effectiveness shall never compromise or impede full and effective implementation of the ISMS and full ES&H compliance.
(3) If the Contractor does not meet the performance requirements of this contract relating to ES&H during any performance evaluation period established under the contract pursuant to the clause of this contract entitled, “Total Available Fee: Base Fee Amount and Performance Fee Amount,” otherwise earned fee, fixed fee, profit or share of cost savings may be unilaterally reduced by the Contracting Officer.
(b) Reduction amount.
(1) The amount of earned fee, fixed fee, profit, or share of cost savings that may be unilaterally reduced will be determined by the severity of the performance failure pursuant to the degrees specified in paragraph (c) of this clause.
(2) If a reduction of earned fee, fixed fee, profit, or share of cost savings is warranted, unless mitigating factors apply, such reduction shall not be less than 26 percent nor greater than 100 percent of the amount of earned fee, fixed fee, profit, or the Contractor's share of cost savings for a first degree performance failure, not less than 11 percent nor greater than 25 percent for a second degree performance failure, and up to 10 percent for a third degree performance failure.
(3) In determining the amount of the reduction and the applicability of mitigating factors, the Contracting Officer must consider the Contractor's overall performance in meeting the ES&H requirements of the contract. Such consideration must include performance against any site specific performance criteria/requirements that provide additional definition, guidance for the amount of reduction, or guidance for the applicability of mitigating factors. In all cases, the Contracting Officer must consider mitigating factors that may warrant a reduction below the applicable range (see 48 CFR 970.1504-1-2). The mitigating factors include the following.
(i) Degree of control the Contractor had over the event or incident.
(ii) Efforts the Contractor had made to anticipate and mitigate the possibility of the event in advance.
(iii) Contractor self-identification and response to the event to mitigate impacts and recurrence.
(iv) General status (trend and absolute performance) of ES&H and compliance in related areas.
(v) Contractor demonstration to the Contracting Officer's satisfaction that the principles of industrial ES&H standards are routinely practiced (e.g., Voluntary Protection Program Star Status, or ISO 14000 Certification).
(vi) Event caused by “Good Samaritan” act by the Contractor (e.g., offsite emergency response).
(vii) Contractor demonstration that a performance measurement system is routinely used to improve and maintain ES&H performance (including effective resource allocation) and to support DOE corporate decision-making (e.g., policy, ES&H programs).
(viii) Contractor demonstration that an Operating Experience and Feedback Program is functioning that demonstrably affects continuous improvement in ES&H by use of lessons-learned and best practices inter- and intra-DOE sites.
Alternate II (AUG 2009). As prescribed in 970.1504-5(b)(3), insert the following as paragraphs (e) and (f), incentive fee or multiple fee basis (if Alternate I is also used, redesignate the following as paragraphs (d) and (e)).
(e) Minimum requirements for specified level of performance.
(1) At a minimum the Contractor must perform the following -
(i) The requirements with specific incentives which do not require the achievement of cost efficiencies in order to be performed at the level of performance set forth in the Statement of Work, Work Authorization Directive, or similar document unless an otherwise minimum level of performance has been established in the specific incentive;
(ii) All of the performance requirements directly related to requirements specifically incentivized which do not require the achievement of cost efficiencies in order to be performed at a level of performance such that the overall performance of these related requirements is at an acceptable level; and
(iii) All other requirements at a level of performance such that the total performance of the contract is not jeopardized.
(2) The evaluation of the Contractor's achievement of the level of performance shall be unilaterally determined by the Government. To the extent that the Contractor fails to achieve the minimum performance levels specified in the Statement of Work, Work Authorization Directive, or similar document, during the performance evaluation period, the DOE Operations/Field Office Manager, or designee, may reduce any otherwise earned fee, fixed fee, profit, or shared net savings for the performance evaluation period. Such reduction shall not result in the total of earned fee, fixed fee, profit, or shared net savings being less than 25 percent of the total available fee amount. Such 25 percent shall include base fee, if any.
(f) Minimum requirements for cost performance.
(1) Requirements incentivized by other than cost incentives must be performed within their specified cost constraint and must not adversely impact the costs of performing unrelated activities.
(2) The performance of requirements with a specific cost incentive must not adversely impact the costs of performing unrelated requirements.
(3) The Contractor's performance within the stipulated cost performance levels for the performance evaluation period shall be determined by the Government. To the extent the Contractor fails to achieve the stipulated cost performance levels, the DOE Operations/Field Office Manager, or designee, may reduce in whole or in part any otherwise earned fee, fixed fee, profit, or shared net savings for the performance evaluation period. Such reduction shall not result in the total of earned fee, fixed fee, profit or shared net savings being less than 25 percent of the total available fee amount. Such 25 percent shall include base fee, if any.
970.5215-4 Cost reduction.
As prescribed in 970.1504-5(c), insert the following clause:
Cost Reduction (AUG 2009)
(a) General. It is the Department of Energy's (DOE's) intent to have its facilities and laboratories operated in an efficient and effective manner. To this end, the Contractor shall assess its operations and identify areas where cost reductions would bring cost efficiency to operations without adversely affecting the level of performance required by the contract. The Contractor, to the maximum extent practical, shall identify areas where cost reductions may be effected, and develop and submit Cost Reduction Proposals (CRPs) to the Contracting Officer. If accepted, the Contractor may share in any shared net savings from accepted CRPs in accordance with paragraph (g) of this clause.
(b) Definitions. Administrative cost is the Contractor cost of developing and administering the CRP.
Design, process, or method change is a change to a design, process, or method which has established cost, technical and schedule baseline, is defined, and is subject to a formal control procedure. Such a change must be innovative, initiated by the Contractor, and applied to a specific project or program.
Development cost is the Contractor cost of up-front planning, engineering, prototyping, and testing of a design, process, or method.
DOE cost is the Government cost incurred implementing and validating the CRP.
Implementation cost is the Contractor cost of tooling, facilities, documentation, etc., required to effect a design, process, or method change once it has been tested and approved.
Net Savings means a reduction in the total amount (to include all related costs and fee) of performing the effort where the savings revert to DOE control and may be available for deobligation. Such savings may result from a specific cost reduction effort which is negotiated on a cost-plus-incentive-fee, fixed-price incentive, or firm-fixed-price basis, or may result directly from a design, process, or method change. They may also be savings resulting from formal or informal direction given by DOE or from changes in the mission, work scope, or routine reorganization of the Contractor due to changes in the budget.
Shared Net Savings are those net savings which result from -
(1) A specific cost reduction effort which is negotiated on a cost-plus-incentive-fee or fixed-price incentive basis, and is the difference between the negotiated target cost of performing an effort as negotiated and the actual allowable cost of performing that effort; or
(2) A design, process, or method change, which occurs in the fiscal year in which the change is accepted and the subsequent fiscal year, and is the difference between the estimated cost of performing an effort as originally planned and the actual allowable cost of performing that same effort utilizing a revised plan intended to reduce costs along with any Contractor development costs, implementation costs, administrative costs, and DOE costs associated with the revised plan. Administrative costs and DOE costs are only included at the discretion of the Contracting Officer. Savings resulting from formal or informal direction given by the DOE or changes in the mission, work scope, or routine reorganization of the Contractor due to changes in the budget are not to be considered as shared net savings for purposes of this clause and do not qualify for incentive sharing.
(c) Procedure for submission of CRPs.
(1) CRPs for the establishment of cost-plus-incentive-fee, fixed-price incentive, or firm-fixed-price efforts or for design, process, or methods changes submitted by the Contractor shall contain, at a minimum, the following:
(i) Current Method (Baseline) - A verifiable description of the current scope of work, cost, and schedule to be impacted by the initiative, and supporting documentation.
(ii) New Method (New Proposed Baseline) - A verifiable description of the new scope of work, cost, and schedule, how the initiative will be accomplished, and supporting documentation.
(iii) Feasibility Assessment - A description and evaluation of the proposed initiative and benefits, risks, and impacts of implementation. This evaluation shall include an assessment of the difference between the current method (baseline) and proposed new method including all related costs.
(2) In addition, CRPs for the establishment of cost-plus-incentive-fee, fixed-price incentive, or firm-fixed-price efforts shall contain, at a minimum, the following -
(i) The proposed contractual arrangement and the justification for its use; and
(ii) A detailed cost/price estimate and supporting rationale. If the approach is proposed on an incentive basis, minimum and maximum cost estimates should be included along with any proposed sharing arrangements.
(d) Evaluation and decision. All CRPs must be submitted to and approved by the Contracting Officer. Included in the information provided by the CRP must be a discussion of the extent the proposed cost reduction effort may -
(1) Pose a risk to the health and safety of workers, the community, or to the environment;
(2) Result in a waiver or deviation from DOE requirements, such as DOE Orders and joint oversight agreements;
(3) Require a change in other contractual agreements;
(4) Result in significant organizational and personnel impacts;
(5) Create a negative impact on the cost, schedule, or scope of work in another area;
(6) Pose a potential negative impact on the credibility of the Contractor or the DOE; and
(7) Impact successful and timely completion of any of the work in the cost, technical, and schedule baseline.
(e) Acceptance or rejection of CRPs. Acceptance or rejection of a CRP is a unilateral determination made by the Contracting Officer. The Contracting Officer will notify the Contractor that a CRP has been accepted, rejected, or deferred within (Insert Number) days of receipt. The only CRPs that will be considered for acceptance are those which the Contractor can demonstrate, at a minimum, will -
(1) Result in net savings (in the sharing period if a design, process, or method change);
(2) Not reappear as costs in subsequent periods; and
(3) Not result in any impairment of essential functions.
(f) The failure of the Contracting Officer to notify the Contractor of the acceptance, rejection, or deferral of a CRP within the specified time shall not be construed as approval.
(g) Adjustment to original estimated cost and fee. If a CRP is established on a cost-plus-incentive-fee, fixed-price incentive or firm-fixed-price basis, the originally estimated cost and fee for the total effort shall be adjusted to remove the estimated cost and fee amount associated with the CRP effort.
(h) Sharing arrangement. If a CRP is accepted, the Contractor may share in the shared net savings. For a CRP negotiated on a cost-plus-incentive-fee or fixed-price incentive basis, with the specific incentive arrangement (negotiated target costs, target fees, share lines, ceilings, profit, etc.) set forth in the contractual document authorizing the effort, the Contractor's share shall be the actual fee or profit resulting from such an arrangement. For a CRP negotiated as a cost savings incentive resulting from a design, process, or method change, the Contractor's share shall be a percentage, not to exceed 25% of the shared net savings. The specific percentage and sharing period shall be set forth in the contractual document.
(i) Validation of Shared Net Savings. The Contracting Officer shall validate actual shared net savings. If actual shared net savings cannot be validated, the Contractor will not be entitled to a share of the net shared savings.
(j) Relationship to other incentives. Only those benefits of an accepted CRP not awardable under other clauses of this contract shall be considered under this clause.
(k) Subcontracts. The Contractor may include a clause similar to this clause in any subcontract. In calculating any estimated shared net savings in a CRP under this contract, the Contractor's administration, development, and implementation costs shall include any subcontractor's allowable costs, and any CRP incentive payments to a subcontractor resulting from the acceptance of such CRP. The Contractor may choose any arrangement for subcontractor CRP incentive payments, provided that the payments not reduce the DOE's share of shared net savings.
(End of clause)
970.5215-5 Limitation on fee.
As prescribed in 970.1504-5(d), the contracting officer shall insert the following provision:
Limitation on Fee (DEC 2000)
(a) For the purpose of this solicitation, fee amounts shall not exceed the total available fee allowed by the fee policy at 48 CFR 970.1504-1-1, or as specifically stated elsewhere in the solicitation.
(b) The Government reserves the unilateral right, in the event an offeror's proposal is selected for award, to limit: fixed fee to not exceed an amount established pursuant to 48 CFR 970.1504-1-5; and total available fee to not exceed an amount established pursuant to 48 CFR 970.1504-1-9; or fixed fee or total available fee to an amount as specifically stated elsewhere in the solicitation.
(End of clause)
970.5217-1 Strategic Partnership Projects Program.
As prescribed in 970.1707-4 insert the following clause:
Strategic Partnership Projects Program (Non-DOE Funded Work) (April 23, 2015)
(a) Authority to perform Strategic Partnership Projects. Pursuant to the Economy Act of 1932, as amended (31 U.S.C. 1535), and the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.) or other applicable authority, the Contractor may perform work for non-DOE entities (sponsors) on a fully reimbursable basis in accordance with this clause.
(b) Contractor's implementation. The Contractor must draft, implement, and maintain formal policies, practices, and procedures in accordance with this clause, which must be submitted to the Contracting Officer for review and approval.
(c) Conditions of participation in Strategic Partnership Projects program. The Contractor -
(1) Must not perform Strategic Partnership Projects activities that would place it in direct competition with the domestic private sector;
(2) Must not respond to a request for proposals or any other solicitation from another Federal agency or non-Federal organization that involves direct comparative competition, either as an offeror, team member, or subcontractor to an offeror; however, the Contractor may, following notification to the Contracting Officer, respond to Broad Agency Announcements, Financial Assistance solicitations, and similar solicitations from another Federal Agency or non-Federal organizations when the selection is based on merit or peer review, the work involves basic or applied research to further advance scientific knowledge or understanding, and a response does not result in direct, comparative competition;
(3) Must not commence work on any Strategic Partnership Projects activity until a Strategic Partnership Projects proposal package has been approved by the DOE Contracting Officer or designated representative;
(4) Must not incur project costs until receipt of DOE notification that a budgetary resource is available for the project, except as provided in 48 CFR 970.5232-6;
(5) Must ensure that all costs associated with the performance of the work, including specifically all DOE direct costs and applicable surcharges, are included in any Strategic Partnership Projects proposal;
(6) Must maintain records for the accumulation of costs and the billing of such work to ensure that DOE's appropriated funds are not used in support of Strategic Partnership Projects activities and to provide an accounting of the expenditures to DOE and the sponsor upon request;
(7) Must perform all Strategic Partnership Projects projects in accordance with the standards, policies, and procedures that apply to performance under this contract, including but not limited to environmental, safety and health, security, safeguards and classification procedures, and human and animal research regulations;
(8) May subcontract portion(s) of a Work for Others project; however, the Contractor must select the subcontractor and the work to be subcontracted. Any subcontracted work must be in direct support of the DOE Contractor's performance as defined in the DOE approved Strategic Partnership Projects proposal package; and,
(9) Must maintain a summary listing of project information for each active Strategic Partnership Projects project, consisting of -
(i) Sponsoring agency;
(ii) Total estimated costs;
(iii) Project title and description;
(iv) Project point of contact; and,
(v) Estimated start and completion dates.
(d) Negotiation and execution of Strategic Partnership Projects agreement.
(1) When delegated authority by the Contracting Officer, the Contractor may negotiate the terms and conditions that will govern the performance of a specific Strategic Partnership Projects project. Such terms and conditions must be consistent with the terms, conditions, and requirements of the Contractor's contract with DOE. The Contractor may use DOE-approved contract terms and conditions as delineated in DOE Manual 481.1-1A or terms and conditions previously approved by the responsible Contracting Officer or authorized designee for agreements with non-Federal entities. The Contractor must not hold itself out as representing DOE when negotiating the proposed Strategic Partnership Projects agreement.
(2) The Contractor must submit all Strategic Partnership Projects agreements to the DOE Contracting Officer for DOE review and approval. The Contractor may not execute any proposed agreement until it has received notice of DOE approval.
(e) Preparation of project proposals. When the Contractor proposes to perform Strategic Partnership Projects activities pursuant to this clause, it may assist the project sponsor in the preparation of project proposal packages including the preparation of cost estimates.
(f) Strategic Partnership Projects appraisals. DOE may conduct periodic appraisals of the Contractor's compliance with its Strategic Partnership Projects Program policies, practices and procedures. The Contractor must provide facilities and other support in conjunction with such appraisals as directed by the Contracting Officer or authorized designee.
(g) Annual Strategic Partnership Projects report. The Contractor must provide assistance as required by the Contracting Officer or authorized designee in the preparation of a DOE Annual Summary Report of Strategic Partnership Projects Activities under the contract.
(End of clause)
970.5222-1 Collective Bargaining Agreements Management and Operating Contracts.
As prescribed in 970.2201-1-3, insert the following clause:
Collective Bargaining Agreements - Management and Operating Contracts (DEC 2000)
When negotiating collective bargaining agreements applicable to the work force under this contract, the Contractor shall use its best efforts to ensure such agreements contain provisions designed to assure continuity of services. All such agreements entered into during the contract period of performance should provide that grievances and disputes involving the interpretation or application of the agreement will be settled without resorting to strike, lockout, or other interruption of normal operations. For this purpose, each collective bargaining agreement should provide an effective grievance procedure with arbitration as its final step, unless the parties mutually agree upon some other method of assuring continuity of operations. As part of such agreements, management and labor should agree to cooperate fully with the Federal Mediation and Conciliation Service. The Contractor shall include the substance of this clause in any subcontracts for protective services or other services performed on the DOE-owned site which will affect the continuity of operation of the facility.
(End of clause)
970.5222-2 Overtime management.
As prescribed in 970.2201-2-2, insert the following clause:
Overtime Management (DEC 2000)
(a) The Contractor shall maintain adequate internal controls to ensure that employee overtime is authorized only if cost effective and necessary to ensure performance of work under this contract.
(b) The Contractor shall notify the Contracting Officer when in any given year it is likely that overtime usage as a percentage of payroll may exceed 4%.
(c) The Contracting Officer may require the submission, for approval, of a formal annual overtime control plan whenever Contractor overtime usage as a percentage of payroll has exceeded, or is likely to exceed, 4%, or if the Contracting Officer otherwise deems overtime expenditures excessive. The plan shall include, at a minimum -
(1) An overtime premium fund (maximum dollar amount);
(2) Specific controls for casual overtime for non-exempt employees;
(3) Specific parameters for allowability of exempt overtime;
(4) An evaluation of alternatives to the use of overtime; and
(5) Submission of a semi-annual report that includes for exempt and non-exempt employees -
(i) Total cost of overtime;
(ii) Total cost of straight time;
(iii) Overtime cost as a percentage of straight-time cost;
(iv) Total overtime hours;
(v) Total straight-time hours; and
(vi) Overtime hours as a percentage of straight-time hours.
(End of clause)
970.5223-1 Integration of environment, safety, and health into work planning and execution.
As prescribed in 970.2303-3(a), insert the following clause:
Integration of Environment, Safety, and Health Into Work Planning and Execution (DEC 2000)
(a) For the purposes of this clause,
(1) Safety encompasses environment, safety and health, including pollution prevention and waste minimization; and
(2) Employees include subcontractor employees.
(b) In performing work under this contract, the Contractor shall perform work safely, in a manner that ensures adequate protection for employees, the public, and the environment, and shall be accountable for the safe performance of work. The Contractor shall exercise a degree of care commensurate with the work and the associated hazards. The Contractor shall ensure that management of environment, safety and health (ES&H) functions and activities becomes an integral but visible part of the Contractor's work planning and execution processes. The Contractor shall, in the performance of work, ensure that:
(1) Line management is responsible for the protection of employees, the public, and the environment. Line management includes those Contractor and subcontractor employees managing or supervising employees performing work.
(2) Clear and unambiguous lines of authority and responsibility for ensuring ES&H are established and maintained at all organizational levels.
(3) Personnel possess the experience, knowledge, skills, and abilities that are necessary to discharge their responsibilities.
(4) Resources are effectively allocated to address ES&H, programmatic, and operational considerations. Protecting employees, the public, and the environment is a priority whenever activities are planned and performed.
(5) Before work is performed, the associated hazards are evaluated and an agreed-upon set of ES&H standards and requirements are established which, if properly implemented, provide adequate assurance that employees, the public, and the environment are protected from adverse consequences.
(6) Administrative and engineering controls to prevent and mitigate hazards are tailored to the work being performed and associated hazards. Emphasis should be on designing the work and/or controls to reduce or eliminate the hazards and to prevent accidents and unplanned releases and exposures.
(7) The conditions and requirements to be satisfied for operations to be initiated and conducted are established and agreed-upon by DOE and the Contractor. These agreed-upon conditions and requirements are requirements of the contract and binding upon the Contractor. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work and shall be established in a Safety Management System.
(c) The Contractor shall manage and perform work in accordance with a documented Safety Management System (System) that fulfills all conditions in paragraph (b) of this clause at a minimum. Documentation of the System shall describe how the Contractor will -
(1) Define the scope of work;
(2) Identify and analyze hazards associated with the work;
(3) Develop and implement hazard controls;
(4) Perform work within controls; and
(5) Provide feedback on adequacy of controls and continue to improve safety management.
(d) The System shall describe how the Contractor will establish, document, and implement safety performance objectives, performance measures, and commitments in response to DOE program and budget execution guidance while maintaining the integrity of the System. The System shall also describe how the Contractor will measure system effectiveness.
(e) The Contractor shall submit to the Contracting Officer documentation of its System for review and approval. Dates for submittal, discussions, and revisions to the System will be established by the Contracting Officer. Guidance on the preparation, content, review, and approval of the System will be provided by the Contracting Officer. On an annual basis, the Contractor shall review and update, for DOE approval, its safety performance objectives, performance measures, and commitments consistent with and in response to DOE's program and budget execution guidance and direction. Resources shall be identified and allocated to meet the safety objectives and performance commitments as well as maintain the integrity of the entire System. Accordingly, the System shall be integrated with the Contractor's business processes for work planning, budgeting, authorization, execution, and change control.
(f) The Contractor shall comply with, and assist the Department of Energy in complying with, ES&H requirements of all applicable laws and regulations, and applicable directives identified in the clause of this contract entitled “Laws, Regulations, and DOE Directives.” The Contractor shall cooperate with Federal and non-Federal agencies having jurisdiction over ES&H matters under this contract.
(g) The Contractor shall promptly evaluate and resolve any noncompliance with applicable ES&H requirements and the System. If the Contractor fails to provide resolution or if, at any time, the Contractor's acts or failure to act causes substantial harm or an imminent danger to the environment or health and safety of employees or the public, the Contracting Officer may issue an order stopping work in whole or in part. Any stop work order issued by a contracting officer under this clause (or issued by the Contractor to a subcontractor in accordance with paragraph (i) of this clause) shall be without prejudice to any other legal or contractual rights of the Government. In the event that the Contracting Officer issues a stop work order, an order authorizing the resumption of the work may be issued at the discretion of the Contracting Officer. The Contractor shall not be entitled to an extension of time or additional fee or damages by reason of, or in connection with, any work stoppage ordered in accordance with this clause.
(h) Regardless of the performer of the work, the Contractor is responsible for compliance with the ES&H requirements applicable to this contract. The Contractor is responsible for flowing down the ES&H requirements applicable to this contract to subcontracts at any tier to the extent necessary to ensure the Contractor's compliance with the requirements.
(i) The Contractor shall include a clause substantially the same as this clause in subcontracts involving complex or hazardous work on site at a DOE-owned or -leased facility. Such subcontracts shall provide for the right to stop work under the conditions described in paragraph (g) of this clause. Depending on the complexity and hazards associated with the work, the Contractor may choose not to require the subcontractor to submit a Safety Management System for the Contractor's review and approval.
(End of clause)
970.5223-3 Agreement regarding Workplace Substance Abuse Programs at DOE sites.
As prescribed in 970.2305-4(a), the contracting officer shall insert the following provision:
Agreement Regarding Workplace Substance Abuse Programs at DOE Sites (DEC 2010)
(a) Any contract awarded as a result of this solicitation will be subject to the policies, criteria, and procedures of 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites.
(b) By submission of its offer, the officer agrees to provide to the Contracting Officer, within 30 days after notification of selection for award, or award of a contract, whichever occurs first, pursuant to this solicitation, its written workplace substance abuse program consistent with the requirements of 10 CFR part 707. DOE may grant an extension to the notification or implementation period if necessary as per 10 CFR 707.5(g).
(c) Failure of the offeror to agree to the condition of responsibility set forth in paragraph (b) of this provision, renders the offeror unqualified and ineligible for award.
(End of provision)
970.5223-4 Workplace Substance Abuse Programs at DOE Sites.
As prescribed in 970.2305-4(b), insert the following clause:
Workplace Substance Abuse Programs at DOE Sites (DEC 2010)
(a) Program implementation. The Contractor shall, consistent with 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference with full force and effect, develop, implement, and maintain a workplace substance abuse program.
(b) Remedies. In addition to any other remedies available to the Government, the Contractor's failure to comply with the requirements of 10 CFR part 707 or to perform in a manner consistent with its approved program may render the Contractor subject to: the suspension of contract payments, or, where applicable, a reduction in award fee; termination for default; and suspension or debarment.
(c) Subcontracts.
(1) The Contractor agrees to notify the Contracting Officer reasonably in advance of, but not later than 30 days prior to, the award of any subcontract the Contractor believes may be subject to the requirements of 10 CFR part 707, unless the Contracting Officer agrees to a different date.
(2) The DOE Prime Contractor shall require all subcontracts subject to the provisions of 10 CFR part 707 to agree to develop and implement a workplace substance abuse program that complies with the requirements of 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, as a condition for award of the subcontract. The DOE Prime Contractor shall review and approve each subcontractor's program, and shall periodically monitor each subcontractor's implementation of the program for effectiveness and compliance with 10 CFR part 707.
(3) The Contractor agrees to include, and require the inclusion of, the requirements of this clause in all subcontracts, at any tier, that are subject to the provisions of 10 CFR part 707.
(End of clause)
970.5223-6 Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management.
In accordance with the prescriptions at 923.002(b) or 970.2301-2(b), insert the following in contracts for the operation of a DOE facility or motor vehicle fleet.
Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management (OCT 2010)
Since this contract involves Contractor operation of Government-owned facilities and/or motor vehicles, the provisions of Executive Order 13423 are applicable to the Contractor to the same extent they would be applicable if the Government were operating the facilities or motor vehicles. Information on the requirements of the Executive Order may be found at http://www.archives.gov/federal-register/executive-orders/.
(End of clause)
970.5223-7 Sustainable acquisition program.
As prescribed in 970.2301-2, insert the following clause in contracts:
Sustainable Acquisition Program (OCT 2010)
(a) Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy (DOE) is committed to managing its facilities in an environmentally preferable and sustainable manner that will promote the natural environment and protect the health and well being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall provide its services in a manner that promotes the natural environment, reduces greenhouse gas emissions and protects the health and well being of Federal employees, contract service providers and visitors using the facility.
(b) Green purchasing or sustainable acquisition has several interacting initiatives. The Contractor must comply with initiatives that are current as of the contract award date. DOE may require compliance with revised initiatives from time to time. The Contractor may request an equitable adjustment to the terms of its contract using the procedures at 48 CFR 970.5243-1 Changes. The initiatives important to these Orders are explained on the following Government or Industry Internet Sites:
(1) Recycled Content Products are described at http://epa.gov/cpg.
(2) Biobased Products are described at http://www.biopreferred.gov/.
(3) Energy efficient products are at http://energystar.gov/products for Energy Star products.
(4) Energy efficient products are at http://www.femp.energy.gov/procurement for FEMP designated products.
(5) Environmentally preferable and energy efficient electronics including desktop computers, laptops and monitors are at http://www.epeat.net the Electronic Products Environmental Assessment Tool (EPEAT) the Green Electronics Council site.
(6) Green house gas emission inventories are required, including Scope 3 emissions which include contractor emissions. These are discussed at Section 13 of Executive Order 13514 which can be found at http://www.archives.gov/federal-register/executive-orders/disposition.h….
(7) Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html.
(8) Water efficient plumbing products are at http://epa.gov/watersense.
(c) The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, require the use of products that have biobased content, are energy efficient, or have recycled content. To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor must provide the energy efficient and environmentally sustainable type of product unless that type of product -
(1) Is not available;
(2) Is not life cycle cost effective (or does not exceed 110% of the price of alternative items if life cycle cost data is unavailable), EPEAT is an example of lifecycle costs that have been analyzed by DOE and found to be acceptable at the silver and gold level;
(3) Does not meet performance needs; or,
(4) Cannot be delivered in time to meet a critical need.
(d) In the performance of this contract, the Contractor shall comply with the requirements of Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, (http://www.epa.gov/greeningepa/practices/eo13423.htm) and Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance (http://www.archives.gov/federal-register/executive-orders/disposition.h…). The Contractor shall also consider the best practices within the DOE Acquisition Guide, Chapter 23, Acquisition Considerations Regarding Federal Leadership in Environmental, Energy, and Economic Performance. This guide includes information concerning recycled content products, biobased products, energy efficient products, water efficient products, alternative fuels and vehicles, non ozone depleting substances and other environmentally preferable products and services. This guide is available on the Internet at: http://management.energy.gov/documents/AcqGuide23pt0Rev1.pdf.
(e) Contractors must establish and maintain a documented energy management program which includes requirements for energy and water efficient equipment, EnergyStar or WaterSense, as applicable and procedures for verification of purchases, following the criteria in DOE Order 430.2B, Departmental Energy, Renewable Energy, and Transportation Management, Attachment 1, or its successor. This requirement should not be flowed down to subcontractors.
(f) In complying with the requirements of paragraph (c) of this clause, the Contractor shall coordinate its activities with and submit required reports through the Environmental Sustainability Coordinator or equivalent position.
(g) The Contractor shall prepare and submit performance reports using prescribed DOE formats, at the end of the Federal fiscal year, on matters related to the acquisition of environmentally preferable and sustainable products and services. This is a material delivery under the contract. Failure to perform this requirement may be considered a failure that endangers performance of this contract and may result in termination for default [see FAR 52.249-6, Termination (Cost Reimbursement)].
(h) These provisions shall be flowed down only to first tier subcontracts exceeding the simplified acquisition threshold that support operation of the DOE facility and offer significant subcontracting opportunities for energy efficient or environmentally sustainable products or services. The Subcontractor will comply with the procedures in paragraphs (c) through (f) of this clause regarding the collection of all data necessary to generate the reports required under paragraphs (c) through (f) of this clause, and submit the reports directly to the Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is unable to procure energy efficient and environmentally sustainable items and cite which of the reasons in paragraph (c) of this clause apply. The reports may be submitted at the conclusion of the subcontract term provided that the subcontract delivery term is not multi-year in nature. If the delivery term is multi-year, the Subcontractor shall report its accomplishments for each Federal fiscal year in a manner and at a time or times acceptable to both parties. Failure to comply with these reporting requirements may be considered a breach of contract with attendant consequences.
(i) When this clause is used in a subcontract, the word “Contractor” will be understood to mean “Subcontractor.”
(End of clause)
Alternate I for Construction Contracts and Subcontracts (OCT 2010) - When contracting for construction, alteration, or renovation of DOE facilities, substitute the following paragraphs (d) through (i):
(d) In the performance of this contract, the Contractor shall comply with the requirements of Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, (http://www.epa.gov/greeningepa/practices/eo13423.htm) and Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance (http://www.archives.gov/federal-register/executive-orders/disposition.h…). The Contractor shall also consider the best practices within the DOE Acquisition Guide, Chapter 23, Acquisition Considerations Regarding Federal Leadership in Environmental, Energy, and Economic Performance. This guide includes information concerning recycled content products, biobased products, energy efficient products, water efficient products, alternative fuels and vehicles, non-ozone depleting substances and other environmentally preferable products and services. This guide is available on the Internet at: http://management.energy.gov/documents/AcqGuide23pt0Rev1.pdf. When developing the Bill of Materials for approval of the Contracting Officer or Representative, the contractor shall specify energy efficient and environmentally sustainable materials to the extent possible within the constraints of the general design specifications. Compliance with the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings (Guiding Principles) shall be achieved through certification to the Leadership in Energy and Environmental Design (LEED) Gold level under the LEED rating system most suited to the building type.
(e) [Reserved]
(f) In complying with the requirements of paragraph (c) of this clause, the Contractor(s) shall coordinate its activities with and submit required reports through the Environmental Sustainability Coordinator or equivalent position.
(g) The Contractor shall prepare and submit performance reports using prescribed DOE formats, at the end of the Federal fiscal year, on matters related to the acquisition of energy efficient and environmentally sustainable products and services. This is a material delivery under the contract. Failure to perform this requirement may be considered a failure that endangers performance of this contract and may result in termination for default, see 48 CFR 52.249-6, Termination (Cost Reimbursement).
(h) These provisions shall be flowed down only to first tier construction subcontracts exceeding the simplified acquisition threshold that support operation of the DOE facility and offer significant opportunities for designating energy efficient or environmentally sustainable products or services in the materials selection process. The subcontractor will comply with the procedures in paragraphs (c) through (f) of this clause regarding the collection of all data necessary to generate the reports required under paragraphs (c) through (f) of this clause, and submit the reports directly to the Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The subcontractor will advise the contractor if it is unable to procure energy efficient and environmentally sustainable items and cite which of the reasons in paragraph (c) of this clause apply. The reports may be submitted at the conclusion of the subcontract term provided that the subcontract delivery term is not multi-year in nature. If the delivery term is multi-year, the subcontractor shall report its accomplishments for each Federal fiscal year in a manner and at a time or times acceptable to both parties. Failure to comply with these reporting requirements may be considered a breach of contract with attendant consequences.
(i) When this clause is used in a subcontract, the word “Contractor” will be understood to mean “Subcontractor.”
(End of clause)
970.5225-1 Compliance with export control laws and regulations (Export Clause).
As prescribed in 970.2571-3, use the following clause:
Compliance With Export Control Laws and Regulations (NOV 2015)
(a) The Contractor shall comply with all applicable U.S. export control laws and regulations.
(b) The Contractor's responsibility to comply with all applicable laws and regulations exists independent of, and is not established or limited by, the information provided by this clause.
(c) Nothing in the terms of this contract adds to, changes, supersedes, or waives any of the requirements of applicable Federal laws, Executive Orders, and regulations, including but not limited to -
(1) The Atomic Energy Act of 1954, as amended;
(2) The Arms Export Control Act (22 U.S.C. 2751 et seq.);
(3) The Export Administration Act of 1979 (50 U.S.C. app. 2401 et seq.), as continued under the International Emergency Economic Powers Act (Title II of Pub. L. 95-223, 91 Stat. 1626, October 28, 1977; 50 U.S.C. 1701 et seq.);
(4) Trading with the Enemy Act (50 U.S.C. App. 5(b), as amended by the Foreign Assistance Act of 1961);
(5) Assistance to Foreign Atomic Energy Activities (10 CFR part 810);
(6) Export and Import of Nuclear Equipment and Material (10 CFR part 110);
(7) International Traffic in Arms Regulations (ITAR) (22 CFR parts 120 through 130);
(8) Export Administration Regulations (EAR) (15 CFR parts 730 through 774); and
(9) Regulations administered by the Office of Foreign Assets Control (31 CFR parts 500 through 598).
(d) In addition to the Federal laws and regulations cited above, National Security Decision Directive (NSDD) 189, National Policy on the Transfer of Scientific, Technical, and Engineering Information establishes a national policy that, to the maximum extent possible, the products of fundamental research shall remain unrestricted. NSDD 189 provides that no restrictions may be placed upon the conduct or reporting of federally funded fundamental research that has not received national security classification, except as provided in applicable U.S. statutes. As a result, contracts confined to the performance of unclassified fundamental research generally do not involve any export-controlled activities.
NSDD 189 does not take precedence over statutes. NSDD 189 does not exempt any research from statutes that apply to export controls such as the Atomic Energy Act, as amended; the Arms Export Control Act; the Export Administration Act of 1979, as amended; or the U.S. International Emergency Economic Powers Act; or the regulations that implement those statutes (e.g., the ITAR, the EAR, 10 CFR part 110 and 10 CFR part 810). Thus, if items (e.g., commodities, software or technologies) that are controlled by U.S. export control laws or regulations are used to conduct research or are generated as part of the research efforts, the export control laws and regulations apply to the controlled items.
(e) The Contractor shall include the substance of this clause, including this paragraph (e), in all solicitations and subcontracts.
970.5226-1 Diversity plan.
As prescribed in 970.2671-2, insert the following clause:
Diversity Plan (DEC 2000)
The Contractor shall submit a Diversity Plan to the Contracting Officer for approval within 90 days after the effective date of this contract (or contract modification, if appropriate). The Contractor shall submit an update to its Plan annually or with its annual fee proposal. Guidance for preparation of a Diversity Plan is provided in the Appendix __. The Plan shall include innovative strategies for increasing opportunities to fully use the talents and capabilities of a diverse work force. The Plan shall address, at a minimum, the Contractor's approach for promoting diversity through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention of profiling based on race or national origin.
(End of clause)
970.5226-2 Workforce restructuring under section 3161 of the National Defense Authorization Act for fiscal year 1993.
As prescribed in 970.2672-3, insert the following clause:
Workforce Restructuring under Section 3161 of the National Defense Authorization Act for Fiscal Year 1993 (DEC 2000)
(a) Consistent with the objectives of Section 3161 of the National Defense Authorization Act for Fiscal Year 1993, 42 U.S.C. 7274h, in instances where the Department of Energy has determined that a change in workforce at a Department of Energy Defense Nuclear Facility is necessary, the contractor agrees to
(1) comply with the Department of Energy Workforce Restructuring Plan for the facility, if applicable, and (2) use its best efforts to accomplish workforce restructuring or displacement so as to mitigate social and economic impacts.
(b) The requirements of this clause shall be included in subcontracts at any tier (except subcontracts for commercial items pursuant to 41 U.S.C. 403) expected to exceed $500,000.
(End of clause)
970.5226-3 Community commitment.
As prescribed in 970.2673-2, insert the following clause:
Community Commitment (DEC 2000)
It is the policy of the DOE to be a constructive partner in the geographic region in which DOE conducts its business. The basic elements of this policy include: (1) Recognizing the diverse interests of the region and its stakeholders, (2) engaging regional stakeholders in issues and concerns of mutual interest, and (3) recognizing that giving back to the community is a worthwhile business practice. Accordingly, the Contractor agrees that its business operations and performance under the Contract will be consistent with the intent of the policy and elements set forth above.
(End of clause)
970.5227-1 Rights in data-facilities.
As prescribed in 48 CFR 970.2704-3(a), insert the following clause:
Rights in Data - Facilities (DEC 2000)
(a) Definitions.
(1) Computer data bases, as used in this clause, means a collection of data in a form capable of, and for the purpose of, being stored in, processed, and operated on by a computer. The term does not include computer software.
(2) Computer software, as used in this clause, means
(i) computer programs which are data comprising a series of instructions, rules, routines, or statements, regardless of the media in which recorded, that allow or cause a computer to perform a specific operation or series of operations and (ii) data comprising source code listings, design details, algorithms, processes, flow charts, formulae, and related material that would enable the computer program to be produced, created, or compiled. The term does not include computer data bases.
(3) Data, as used in this clause, means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data and computer software. The term “data” does not include data incidental to the administration of this contract, such as financial, administrative, cost and pricing, or management information.
(4) Limited rights data, as used in this clause, means data, other than computer software, developed at private expense that embody trade secrets or are commercial or financial and confidential or privileged. The Government's rights to use, duplicate, or disclose limited rights data are as set forth in the Limited Rights Notice of subparagraph (e) of this clause.
(5) Restricted computer software, as used in this clause, means computer software developed at private expense and that is a trade secret; is commercial or financial and is confidential or privileged; or is published copyrighted computer software, including minor modifications of any such computer software. The Government's rights to use, duplicate, or disclose restricted computer software are as set forth in the Restricted Rights Notice of paragraph (f) of this clause.
(6) Technical data, as used in this clause, means recorded data, regardless of form or characteristic, that are of a scientific or technical nature. Technical data does not include computer software, but does include manuals and instructional materials and technical data formatted as a computer data base.
(7) Unlimited rights, as used in this clause, means the right of the Government to use, disclose, reproduce, prepare derivative works, distribute copies to the public, including by electronic means, and perform publicly and display publicly, in any manner, including by electronic means, and for any purpose whatsoever, and to have or permit others to do so.
(b) Allocation of Rights.
(1) The Government shall have:
(i) Ownership of all technical data and computer software first produced in the performance of this Contract;
(ii) Unlimited rights in technical data and computer software specifically used in the performance of this Contract, except as provided herein regarding copyright, limited rights data, or restricted computer software, or except for other data specifically protected by statute for a period of time or, where, approved by DOE, appropriate instances of the DOE Strategic Partnership Projects Program;
(iii) The right to inspect technical data and computer software first produced or specifically used in the performance of this Contract at all reasonable times. The Contractor shall make available all necessary facilities to allow DOE personnel to perform such inspection;
(iv) The right to have all technical data and computer software first produced or specifically used in the performance of this Contract delivered to the Government or otherwise disposed of by the Contractor, either as the contracting officer may from time to time direct during the progress of the work or in any event as the contracting officer shall direct upon completion or termination of this Contract. The Contractor agrees to leave a copy of such data at the facility or plant to which such data relate, and to make available for access or to deliver to the Government such data upon request by the contracting officer. If such data are limited rights data or restricted computer software, the rights of the Government in such data shall be governed solely by the provisions of paragraph (e) of this clause (“Rights in Limited Rights Data”) or paragraph (f) of this clause (“Rights in Restricted Computer Software”); and
(v) The right to remove, cancel, correct, or ignore any markings not authorized by the terms of this Contract on any data furnished hereunder if, in response to a written inquiry by DOE concerning the propriety of the markings, the Contractor fails to respond thereto within 60 days or fails to substantiate the propriety of the markings. In either case DOE will notify the Contractor of the action taken.
(2) The Contractor shall have:
(i) The right to withhold limited rights data and restricted computer software unless otherwise provided in accordance with the provisions of this clause; and
(ii) The right to use for its private purposes, subject to patent, security or other provisions of this Contract, data it first produces in the performance of this Contract, except for data in DOE's Uranium Enrichment Technology, including diffusion, centrifuge, and atomic vapor laser isotope separation, provided the data requirements of this Contract have been met as of the date of the private use of such data.
(3) The Contractor agrees that for limited rights data or restricted computer software or other technical, business or financial data in the form of recorded information which it receives from, or is given access to by, DOE or a third party, including a DOE Contractor or subcontractor, and for technical data or computer software it first produces under this Contract which is authorized to be marked by DOE, the Contractor shall treat such data in accordance with any restrictive legend contained thereon.
(c) Copyrighted Material.
(1) The Contractor shall not, without prior written authorization of the Patent Counsel, assert copyright in any technical data or computer software first produced in the performance of this contract. To the extent such authorization is granted, the Government reserves for itself and others acting on its behalf, a nonexclusive, paid-up, irrevocable, world-wide license for Governmental purposes to publish, distribute, translate, duplicate, exhibit, and perform any such data copyrighted by the Contractor.
(2) The Contractor agrees not to include in the technical data or computer software delivered under the contract any material copyrighted by the Contractor and not to knowingly include any material copyrighted by others without first granting or obtaining at no cost a license therein for the benefit of the Government of the same scope as set forth in paragraph (c)(1) of this clause. If the Contractor believes that such copyrighted material for which the license cannot be obtained must be included in the technical data or computer software to be delivered, rather than merely incorporated therein by reference, the Contractor shall obtain the written authorization of the contracting officer to include such material in the technical data or computer software prior to its delivery.
(d) Subcontracting.
(1) Unless otherwise directed by the contracting officer, the Contractor agrees to use in subcontracts in which technical data or computer software is expected to be produced or in subcontracts for supplies that contain a requirement for production or delivery of data in accordance with the policy and procedures of 48 CFR Subpart 27.4 as supplemented by 48 CFR 927.401 through 927.409, the clause entitled, “Rights in Data-General” at 48 CFR 52.227-14 modified in accordance with 927.409(a) and including Alternate V. Alternates II through IV of that clause may be included as appropriate with the prior approval of DOE Patent Counsel, and the Contractor shall not acquire rights in a subcontractor's limited rights data or restricted computer software, except through the use of Alternates II or III, respectively, without the prior approval of DOE Patent Counsel. The clause at 48 CFR 52.227-16, Additional Data Requirements, shall be included in subcontracts in accordance with DEAR 927.409(h). The contractor shall use instead the Rights in Data-Facilities clause at 48 CFR 970.5227-1 in subcontracts, including subcontracts for related support services, involving the design or operation of any plants or facilities or specially designed equipment for such plants or facilities that are managed or operated under its contract with DOE.
(2) It is the responsibility of the Contractor to obtain from its subcontractors technical data and computer software and rights therein, on behalf of the Government, necessary to fulfill the Contractor's obligations to the Government with respect to such data. In the event of refusal by a subcontractor to accept a clause affording the Government such rights, the Contractor shall:
(i) Promptly submit written notice to the contracting officer setting forth reasons or the subcontractor's refusal and other pertinent information which may expedite disposition of the matter, and
(ii) Not proceed with the subcontract without the written authorization of the contracting officer.
(3) Neither the Contractor nor higher-tier subcontractors shall use their power to award subcontracts as economic leverage to acquire rights in a subcontractor's limited rights data or restricted computer software for their private use.
(e) Rights in Limited Rights Data. Except as may be otherwise specified in this Contract as data which are not subject to this paragraph, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up license by or for the Government, in any limited rights data of the Contractor specifically used in the performance of this Contract, provided, however, that to the extent that any limited rights data when furnished or delivered is specifically identified by the Contractor at the time of initial delivery to the Government or a representative of the Government, such data shall not be used within or outside the Government except as provided in the “Limited Rights Notice” set forth. All such limited rights data shall be marked with the following “Limited Rights Notice”:
Limited Rights Notice
These data contain “limited rights data,” furnished under Contract No. ________________ with the United States Department of Energy which may be duplicated and used by the Government with the express limitations that the “limited rights data” may not be disclosed outside the Government or be used for purposes of manufacture without prior permission of the Contractor, except that further disclosure or use may be made solely for the following purposes:
(a) Use (except for manufacture) by support services contractors within the scope of their contracts;
(b) This “limited rights data” may be disclosed for evaluation purposes under the restriction that the “limited rights data” be retained in confidence and not be further disclosed;
(c) This “limited rights data” may be disclosed to other contractors participating in the Government's program of which this Contract is a part for information or use (except for manufacture) in connection with the work performed under their contracts and under the restriction that the “limited rights data” be retained in confidence and not be further disclosed;
(d) This “limited rights data” may be used by the Government or others on its behalf for emergency repair or overhaul work under the restriction that the “limited rights data” be retained in confidence and not be further disclosed; and
(e) Release to a foreign government, or instrumentality thereof, as the interests of the United States Government may require, for information or evaluation, or for emergency repair or overhaul work by such government. This Notice shall be marked on any reproduction of this data in whole or in part.
(End of notice)
(f) Rights in restricted computer software.
(1) Except as may be otherwise specified in this Contract as data which are not subject to this paragraph, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up, license by or for the Government, in any restricted computer software of the Contractor specifically used in the performance of this Contract, provided, however, that to the extent that any restricted computer software when furnished or delivered is specifically identified by the Contractor at the time of initial delivery to the Government or a representative of the Government, such data shall not be used within or outside the Government except as provided in the “Restricted Rights Notice” set forth below. All such restricted computer software shall be marked with the following “Restricted Rights Notice”:
Restricted Rights Notice-Long Form
(a) This computer software is submitted with restricted rights under Department of Energy Contract No. ______________. It may not be used, reproduced, or disclosed by the Government except as provided in paragraph (b) of this notice.
(b) This computer software may be:
(1) Used or copied for use in or with the computer or computers for which it was acquired, including use at any Government installation to which such computer or computers may be transferred;
(2) Used, copied for use, in a backup or replacement computer if any computer for which it was acquired is inoperative or is replaced;
(3) Reproduced for safekeeping (archives) or backup purposes;
(4) Modified, adapted, or combined with other computer software, provided that only the portions of the derivative software consisting of the restricted computer software are to be made subject to the same restricted rights; and
(5) Disclosed to and reproduced for use by contractors under a service contract (of the type defined in 48 CFR 37.101) in accordance with subparagraphs (b)(1) through (4) of this Notice, provided the Government makes such disclosure or reproduction subject to these restricted rights.
(c) Notwithstanding the foregoing, if this computer software has been published under copyright, it is licensed to the Government, without disclosure prohibitions, with the rights set forth in the restricted rights notice above.
(d) This Notice shall be marked on any reproduction of this computer software, in whole or in part.
(End of notice)
(2) Where it is impractical to include the Restricted Rights Notice on restricted computer software, the following short-form Notice may be used.
Restricted Rights Notice - Short Form
Use, reproduction, or disclosure is subject to restrictions set forth in the Long Form Notice of DOE Contract No. ______________ with (name of Contractor).
(End of notice)
(3) If the software is embedded, or if it is commercially impractical to mark it with human readable text, then the symbol R and the clause date (mo/yr), in brackets or a box, a [R-mo/yr], may be used. This will be read to mean restricted computer software, subject to the rights of the Government as described in the Long Form Notice, in effect as of the date indicated next to the symbol. The symbol shall not be used to mark human readable material. In the event this Contract contains any variation to the rights in the Long Form Notice, then the contract number must also be cited.
(4) If restricted computer software is delivered with the copyright notice of 17 U.S.C. 401, the software will be presumed to be published copyrighted computer software licensed to the Government without disclosure prohibitions and with unlimited rights, unless the Contractor includes the following statement with such copyright notice “Unpublished-rights reserved under the Copyright Laws of the United States.”
(g) Relationship to patents. Nothing contained in this clause creates or is intended to imply a license to the Government in any patent or is intended to be construed as affecting the scope of any licenses or other rights otherwise granted to the Government under any patent.
(End of clause)
Alternate I (DEC 2000). As prescribed in 48 CFR 970.2704-3(a), where access to Category C-24 restricted data is contemplated in the performance of a contract the contracting officer shall insert the phrase “and except Restricted Data in category C-24, 10 CFR part 725, in which DOE has reserved the right to receive reasonable compensation for the use of its inventions and discoveries, including related data and technology” after “laser isotope separation” and before the comma in paragraph (b)(2)(ii) of the clause at 48 CFR 970.5227-1, Rights in Data - Facilities, as appropriate.
(End of clause)
970.5227-2 Rights in data-technology transfer.
As prescribed in 48 CFR 970.2704-3(b), insert the following clause:
Rights in Data - Technology Transfer (DEC 2000)
(a) Definitions.
(1) Computer data bases, as used in this clause, means a collection of data in a form capable of, and for the purpose of, being stored in, processed, and operated on by a computer. The term does not include computer software.
(2) Computer software, as used in this clause, means
(i) computer programs which are data comprising a series of instructions, rules, routines, or statements, regardless of the media in which recorded, that allow or cause a computer to perform a specific operation or series of operations and (ii) data comprising source code listings, design details, algorithms, processes, flow charts, formulae, and related material that would enable the computer program to be produced, created, or compiled. The term does not include computer data bases.
(3) Data, as used in this clause, means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data and computer software. The term “data” does not include data incidental to the administration of this contract, such as financial, administrative, cost and pricing, or management information.
(4) Limited rights data, as used in this clause, means data, other than computer software, developed at private expense that embody trade secrets or are commercial or financial and confidential or privileged. The Government's rights to use, duplicate, or disclose limited rights data are as set forth in the Limited Rights Notice of paragraph (g) of this clause.
(5) Restricted computer software, as used in this clause, means computer software developed at private expense and that is a trade secret; is commercial or financial and is confidential or privileged; or is published copyrighted computer software, including minor modifications of any such computer software. The Government's rights to use, duplicate, or disclose restricted computer software are as set forth in the Restricted Rights Notice of subparagraph (h) of this clause.
(6) Technical data, as used in this clause, means recorded data, regardless of form or characteristic, that are of a scientific or technical nature. Technical data does not include computer software, but does include manuals and instructional materials and technical data formatted as a computer data base.
(7) Unlimited rights, as used in this clause, means the rights of the Government to use, disclose, reproduce, prepare derivative works, distribute copies to the public, including by electronic means, and perform publicly and display publicly, in any manner, including by electronic means, and for any purpose whatsoever, and to have or permit others to do so.
(b) Allocation of Rights.
(1) The Government shall have:
(i) Ownership of all technical data and computer software first produced in the performance of this Contract;
(ii) Unlimited rights in technical data and computer software specifically used in the performance of this Contract, except as provided herein regarding copyright, limited rights data, or restricted computer software, and except for data subject to the withholding provisions for protected Cooperative Research and Development Agreement (CRADA) information in accordance with Technology Transfer actions under this Contract, or other data specifically protected by statute for a period of time or, where, approved by DOE, appropriate instances of the DOE Strategic Partnership Projects Program;
(iii) The right to inspect technical data and computer software first produced or specifically used in the performance of this Contract at all reasonable times. The Contractor shall make available all necessary facilities to allow DOE personnel to perform such inspection;
(iv) The right to have all technical data and computer software first produced or specifically used in the performance of this Contract delivered to the Government or otherwise disposed of by the Contractor, either as the contracting officer may from time to time direct during the progress of the work or in any event as the contracting officer shall direct upon completion or termination of this Contract. The Contractor agrees to leave a copy of such data at the facility or plant to which such data relate, and to make available for access or to deliver to the Government such data upon request by the contracting officer. If such data are limited rights data or restricted computer software. the rights of the Government in such data shall be governed solely by the provisions of paragraph (g) of this clause (“Rights in Limited Rights Data”) or paragraph (h) of this clause (“Rights in Restricted Computer Software”); and (v) The right to remove, cancel, correct, or ignore any markings not authorized by the terms of this Contract on any data furnished hereunder if, in response to a written inquiry by DOE concerning the propriety of the markings, the Contractor fails to respond thereto within 60 days or fails to substantiate the propriety of the markings. In either case DOE will notify the Contractor of the action taken.
(2) The Contractor shall have:
(i) The right to withhold limited rights data and restricted computer software unless otherwise provided in provisions of this clause;
(ii) The right to use for its private purposes, subject to patent, security or other provisions of this Contract, data it first produces in the performance of this Contract, except for data in DOE's Uranium Enrichment Technology, including diffusion, centrifuge, and atomic vapor laser isotope separation, provided the data requirements of this Contract have been met as of the date of the private use of such data; and
(iii) The right to assert copyright subsisting in scientific and technical articles as provided in paragraph (d) of this clause and the right to request permission to assert copyright subsisting in works other than scientific and technical articles as provided in paragraph (e) of this clause.
(3) The Contractor agrees that for limited rights data or restricted computer software or other technical business or financial data in the form of recorded information which it receives from, or is given access to by DOE or a third party, including a DOE contractor or subcontractor, and for technical data or computer software it first produces under this Contract which is authorized to be marked by DOE, the Contractor shall treat such data in accordance with any restrictive legend contained thereon.
(c) Copyright (General).
(1) The Contractor agrees not to mark, register, or otherwise assert copyright in any data in a published or unpublished work, other than as set forth in paragraphs (d) and (e) of this clause.
(2) Except for material to which the Contractor has obtained the right to assert copyright in accordance with either paragraph (d) or (e) of this clause, the Contractor agrees not to include in the data delivered under this Contract any material copyrighted by the Contractor and not to knowingly include any material copyrighted by others without first granting or obtaining at no cost a license therein for the benefit of the Government of the same scope as set forth in paragraph (d) of this clause. If the Contractor believes that such copyrighted material for which the license cannot be obtained must be included in the data to be delivered, rather than merely incorporated therein by reference, the Contractor shall obtain the written authorization of the contracting officer to include such material in the data prior to its delivery.
(d) Copyrighted works (scientific and technical articles).
(1) The Contractor shall have the right to assert, without prior approval of the contracting officer, copyright subsisting in scientific and technical articles composed under this contract or based on or containing data first produced in the performance of this Contract, and published in academic, technical or professional journals, symposia, proceedings, or similar works. When assertion of copyright is made, the Contractor shall affix the applicable copyright notice of 17 U.S.C. 401 or 402 and acknowledgment of Government sponsorship (including contract number) on the data when such data are delivered to the Government as well as when the data are published or deposited for registration as a published work in the U.S. Copyright Office. The Contractor grants to the Government, and others acting on its behalf, a nonexclusive, paid-up, irrevocable, world-wide license in such copyrighted data to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government.
(2) The contractor shall mark each scientific or technical article first produced or composed under this Contract and submitted for journal publication or similar means of dissemination with a notice, similar in all material respects to the following, on the front reflecting the Government's non-exclusive, paid-up, irrevocable, world-wide license in the copyright.
Notice: This manuscript has been authored by [insert the name of the Contractor] under Contract No. [insert the contract number] with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes.
(End of notice)
(3) The title to the copyright of the original of unclassified graduate theses and the original of related unclassified scientific papers shall vest in the author thereof, subject to the right of DOE to retain duplicates of such documents and to use such documents for any purpose whatsoever without any claim on the part of the author or the contractor for additional compensation.
(e) Copyrighted works (other than scientific and technical articles and data produced under a CRADA). The Contractor may obtain permission to assert copyright subsisting in technical data and computer software first produced by the Contractor in performance of this Contract, where the Contractor can show that commercialization would be enhanced by such copyright protection, subject to the following:
(1) Contractor Request to Assert Copyright.
(i) For data other than scientific and technical articles and data produced under a CRADA, the Contractor shall submit in writing to Patent Counsel its request to assert copyright in data first produced in the performance of this Contract pursuant to this clause. The right of the Contractor to copyright data first produced under a CRADA is as described in the individual CRADA. Each request by the Contractor must include:
(A) The identity of the data (including any computer program) for which the Contractor requests permission to assert copyright, as well as an abstract which is descriptive of the data and is suitable for dissemination purposes, (B) The program under which it was funded, (C) Whether, to the best knowledge of the Contractor, the data is subject to an international treaty or agreement, (D) Whether the data is subject to export control, (E) A statement that the Contractor plans to commercialize the data in compliance with the clause of this contract entitled, “Technology Transfer Mission,” within five (5) years after obtaining permission to assert copyright or, on a case-by-case basis, a specified longer period where the Contractor can demonstrate that the ability to commercialize effectively is dependent upon such longer period, and (F) For data other than computer software, a statement explaining why the assertion of copyright is necessary to enhance commercialization and is consistent with DOE's dissemination responsibilities.
(ii) For data that is developed using other funding sources in addition to DOE funding, the permission to assert copyright in accordance with this clause must also be obtained by the Contractor from all other funding sources prior to the Contractor's request to Patent Counsel. The request shall include the Contractor's certification or other documentation acceptable to Patent Counsel demonstrating such permission has been obtained.
(iii) Permission for the Contractor to assert copyright in excepted categories of data as determined by DOE will be expressly withheld. Such excepted categories include data whose release
(A) would be detrimental to national security, i.e., involve classified information or data or sensitive information under Section 148 of the Atomic Energy Act of 1954, as amended, or are subject to export control for nonproliferation and other nuclear-related national security purposes, (B) would not enhance the appropriate transfer or dissemination and commercialization of such data, (C) would have a negative impact on U.S. industrial competitiveness, (D) would prevent DOE from meeting its obligations under treaties and international agreements, or (E) would be detrimental to one or more of DOE's programs. Additional excepted categories may be added by the Assistant General Counsel for Technology Transfer and Intellectual Property. Where data are determined to be under export control restriction, the Contractor may obtain permission to assert copyright subject to the provisions of this clause for purposes of limited commercialization in a manner that complies with export control statutes and applicable regulations. In addition, notwithstanding any other provision of this Contract, all data developed with Naval Reactors' funding and those data that are classified fall within excepted categories. The rights of the Contractor in data are subject to the disposition of data rights in the treaties and international agreements identified under this Contract as well as those additional treaties and international agreements which DOE may from time to time identify by unilateral amendment to the Contract; such amendment listing added treaties and international agreements is effective only for data which is developed after the date such treaty or international agreement is added to this Contract. Also, the Contractor will not be permitted to assert copyright in data in the form of various technical reports generated by the Contractor under the Contract without first obtaining the advanced written permission of the contracting officer.
(2) DOE Review and Response to Contractor's Request. The Patent Counsel shall use its best efforts to respond in writing within 90 days of receipt of a complete request by the Contractor to assert copyright in technical data and computer software pursuant to this clause. Such response shall either give or withhold DOE's permission for the Contractor to assert copyright or advise the Contractor that DOE needs additional time to respond, and the reasons therefor.
(3) Permission for Contractor to Assert Copyright.
(i) For computer software, the Contractor shall furnish to the DOE designated, centralized software distribution and control point, the Energy Science and Technology Software Center, at the time permission to assert copyright is given under paragraph (e)(2) of this clause:
(A) An abstract describing the software suitable for publication, (B) the source code for each software program, and (C) the object code and at least the minimum support documentation needed by a technically competent user to understand and use the software. The Patent Counsel, for good cause shown by the Contractor, may allow the minimum support documentation to be delivered within 60 days after permission to assert copyright is given or at such time the minimum support documentation becomes available. The Contractor acknowledges that the DOE designated software distribution and control point may provide a technical description of the software in an announcement identifying its availability from the copyright holder.
(ii) Unless otherwise directed by the contracting officer, for data other than computer software to which the Contractor has received permission to assert copyright under paragraph (e)(2) of this clause above, the Contractor shall within sixty (60) days of obtaining such permission furnish to DOE's Office of Scientific and Technical Information (OSTI) a copy of such data as well as an abstract of the data suitable for dissemination purposes. The Contractor acknowledges that OSTI may provide an abstract of the data in an announcement to DOE, its contractors and to the public identifying its availability from the copyright holder.
(iii) For a five year period or such other specified period as specifically approved by Patent Counsel beginning on the date the Contractor is given permission to assert copyright in data, the Contractor grants to the Government, and others acting on its behalf, a paid-up, nonexclusive, irrevocable worldwide license in such copyrighted data to reproduce, prepare derivative works and perform publicly and display publicly, by or on behalf of the Government. Upon request, the initial period may be extended after DOE approval. The DOE approval will be based on the standard that the work is still commercially available and the market demand is being met.
(iv) After the period approved by Patent Counsel for application of the limited Government license described in paragraph (e)(3)(iii) of this clause, or if, prior to the end of such period(s), the Contractor abandons commercialization activities pertaining to the data to which the Contractor has been given permission to assert copyright, the Contractor grants to the Government, and others acting on its behalf, a paid-up, nonexclusive, irrevocable worldwide license in such copyrighted data to reproduce, distribute copies to the public, prepare derivative works, perform publicly and display publicly, and to permit others to do so.
(v) Whenever the Contractor asserts copyright in data pursuant to this paragraph (e), the Contractor shall affix the applicable copyright notice of 17 U.S.C. 401 or 402 on the copyrighted data and also an acknowledgment of the Government sponsorship and license rights of paragraphs (e)(3) (iii) and (iv) of this clause. Such action shall be taken when the data are delivered to the Government, published, licensed or deposited for registration as a published work in the U.S. Copyright Office. The acknowledgment of Government sponsorship and license rights shall be as follows: Notice: These data were produced by (insert name of Contractor) under Contract No. ______________ with the Department of Energy. For (period approved by DOE Patent Counsel) from (date permission to assert copyright was obtained), the Government is granted for itself and others acting on its behalf a nonexclusive, paid-up, irrevocable worldwide license in this data to reproduce, prepare derivative works, and perform publicly and display publicly, by or on behalf of the Government. There is provision for the possible extension of the term of this license. Subsequent to that period or any extension granted, the Government is granted for itself and others acting on its behalf a nonexclusive, paid-up, irrevocable worldwide license in this data to reproduce, prepare derivative works, distribute copies to the public, perform publicly and display publicly, and to permit others to do so. The specific term of the license can be identified by inquiry made to Contractor or DOE. Neither the United States nor the United States Department of Energy, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any data , apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
(End of notice)
(vi) With respect to any data to which the Contractor has received permission to assert copyright, the DOE has the right, during the five (5) year or specified longer period approved by Patent Counsel as provided for in paragraph (e) of this clause, to request the Contractor to grant a nonexclusive, partially exclusive or exclusive license in any field of use to a responsible applicant(s) upon terms that are reasonable under the circumstances, and if the Contractor refuses such request, to grant such license itself, if the DOE determines that the Contractor has not made a satisfactory demonstration that either it or its licensee(s) is actively pursuing commercialization of the data as set forth in subparagraph (e)(1)
(A) of this clause. Before licensing under this subparagraph (vi), DOE shall furnish the Contractor a written request for the Contractor to grant the stated license, and the Contractor shall be allowed thirty (30) days (or such longer period as may be authorized by the contracting officer for good cause shown in writing by the Contractor) after such notice to show cause why the license should not be granted. The Contractor shall have the right to appeal the decision of the DOE to grant the stated license to the Invention Licensing Appeal Board as set forth in 10 CFR 781.65 - ”Appeals.”
(vii) No costs shall be allowable for maintenance of copyrighted data, primarily for the benefit of the Contractor and/or a licensee which exceeds DOE Program needs, except as expressly provided in writing by the contracting officer. The Contractor may use its net royalty income to effect such maintenance costs.
(viii) At any time the Contractor abandons commercialization activities for data for which the Contractor has received permission to assert copyright in accordance with this clause, it shall advise OSTI and Patent Counsel and upon request assign the copyright to the Government so that the Government can distribute the data to the public.
(4) The following notice may be placed on computer software prior to any publication and prior to the Contractor's obtaining permission from the Department of Energy to assert copyright in the computer software pursuant to paragraph (c)(3) of this section.
Notice: This computer software was prepared by [insert the Contractor's name and the individual author], hereinafter the Contractor, under Contract [insert the Contract Number] with the Department of Energy (DOE). All rights in the computer software are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized to use this computer software for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THIS SOFTWARE. This notice including this sentence must appear on any copies of this computer software.
(End of notice)
(5) a similar notice can be used for data, other than computer software, upon approval of DOE Patent Counsel.
(f) Subcontracting.
(1) Unless otherwise directed by the contracting officer, the Contractor agrees to use in subcontracts in which technical data or computer software is expected to be produced or in subcontracts for supplies that contain a requirement for production or delivery of data in accordance with the policy and procedures of 48 CFR Subpart 27.4 as supplemented by 48 CFR 927.401 through 927.409, the clause entitled, “Rights in Data-General” at 48 CFR 52.227-14 modified in accordance with 927.409(a) and including Alternate V. Alternates II through IV of that clause may be included as appropriate with the prior approval of DOE Patent Counsel, and the Contractor shall not acquire rights in a subcontractor's limited rights data or restricted computer software, except through the use of Alternates II or III, respectively, without the prior approval of DOE Patent Counsel. The clause at 48 CFR 52.227-16, Additional Data Requirements, shall be included in subcontracts in accordance with 48 CFR 927.409(h). The Contractor shall use instead the Rights in Data-Facilities clause at 48 CFR 970.5227-1 in subcontracts, including subcontracts for related support services, involving the design or operation of any plants or facilities or specially designed equipment for such plants or facilities that are managed or operated under its contract with DOE.
(2) It is the responsibility of the Contractor to obtain from its subcontractors technical data and computer software and rights therein, on behalf of the Government, necessary to fulfill the Contractor's obligations to the Government with respect to such data. In the event of refusal by a subcontractor to accept a clause affording the Government such rights, the Contractor shall:
(i) Promptly submit written notice to the contracting officer setting forth reasons or the subcontractor's refusal and other pertinent information which may expedite disposition of the matter, and
(ii) Not proceed with the subcontract without the written authorization of the contracting officer.
(3) Neither the Contractor nor higher-tier subcontractors shall use their power to award subcontracts as economic leverage to acquire rights in a subcontractor's limited rights data and restricted computer software for their private use.
(g) Rights in Limited Rights Data. Except as may be otherwise specified in this Contract as data which are not subject to this paragraph, the Contractor agrees to and does hereby grant to the Government an irrevocable nonexclusive, paid-up license by or for the Government, in any limited rights data of the Contractor specifically used in the performance of this Contract, provided, however, that to the extent that any limited rights data when furnished or delivered is specifically identified by the Contractor at the time of initial delivery to the Government or a representative of the Government, such data shall not be used within or outside the Government except as provided in the “Limited Rights Notice” set forth below. All such limited rights data shall be marked with the following “Limited Rights Notice:”
Limited Rights Notice
These data contain “limited rights data,” furnished under Contract No. ______________ with the United States Department of Energy which may be duplicated and used by the Government with the express limitations that the “limited rights data” may not be disclosed outside the Government or be used for purposes of manufacture without prior permission of the Contractor, except that further disclosure or use may be made solely for the following purposes:
(a) Use (except for manufacture) by support services contractors within the scope of their contracts;
(b) This “limited rights data” may be disclosed for evaluation purposes under the restriction that the “limited rights data” be retained in confidence and not be further disclosed;
(c) This “limited rights data” may be disclosed to other contractors participating in the Government's program of which this Contract is a part for information or use (except for manufacture) in connection with the work performed under their contracts and under the restriction that the “limited rights data” be retained in confidence and not be further disclosed;
(d) This “limited rights data” may be used by the Government or others on its behalf for emergency repair or overhaul work under the restriction that the “limited rights data” be retained in confidence and not be further disclosed; and
(e) Release to a foreign government, or instrumentality thereof, as the interests of the United States Government may require, for information or evaluation, or for emergency repair or overhaul work by such government.
This Notice shall be marked on any reproduction of this data in whole or in part.
(End of notice)
(h) Rights in restricted computer software.
(1) Except as may be otherwise specified in this Contract as data which are not subject to this paragraph, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up, license by or for the Government, in any restricted computer software of the Contractor specifically used in the performance of this Contract; provided, however, that to the extent that any restricted computer software when furnished or delivered is specifically identified by the Contractor at the time of initial delivery to the Government or a representative of the Government, such data shall not be used within or outside the Government except as provided in the “Restricted Rights Notice” set forth below. All such restricted computer software shall be marked with the following “Restricted Rights Notice:”
Restricted Rights Notice - Long Form
(a) This computer software is submitted with restricted rights under Department of Energy Contract No. ______. It may not be used, reproduced, or disclosed by the Government except as provided in paragraph (b) of this notice.
(b) This computer software may be:
(1) Used or copied for use in or with the computer or computers for which it was acquired, including use at any Government installation to which such computer or computers may be transferred;
(2) Used, copied for use, in a backup or replacement computer if any computer for which it was acquired is inoperative or is replaced;
(3) Reproduced for safekeeping (archives) or backup purposes;
(4) Modified, adapted, or combined with other computer software, provided that only the portions of the derivative software consisting of the restricted computer software are to be made subject to the same restricted rights; and
(5) Disclosed to and reproduced for use by contractors under a service contract (of the type defined in 48 CFR 37.101) in accordance with subparagraphs (b)(1) through (4) of this Notice, provided the Government makes such disclosure or reproduction subject to these restricted rights.
(c) Notwithstanding the foregoing, if this computer software has been published under copyright, it is licensed to the Government, without disclosure prohibitions, with the rights set forth in the restricted rights notice above.
(d) This Notice shall be marked on any reproduction of this computer software, in whole or in part.
(End of notice)
(2) Where it is impractical to include the Restricted Rights Notice on restricted computer software, the following short-form Notice may be used in lieu thereof:
Restricted Rights Notice - Short Form
Use, reproduction, or disclosure is subject to restrictions set forth in the Long Form Notice of DOE Contract No. ______ with (name of Contractor).
(End of notice)
(3) If the software is embedded, or if it is commercially impractical to mark it with human readable text, then the symbol R and the clause date (mo/yr) in brackets or a box, a [R-mo/yr], may be used. This will be read to mean restricted computer software, subject to the rights of the Government as described in the Long Form Notice, in effect as of the date indicated next to the symbol. The symbol shall not be used to mark human readable material. In the event this Contract contains any variation to the rights in the Long Form Notice, then the contract number must also be cited.
(4) If restricted computer software is delivered with the copyright notice of 17 U.S.C. 401, the software will be presumed to be published copyrighted computer software licensed to the Government without disclosure prohibitions and with unlimited rights, unless the Contractor includes the following statement with such copyright notice “Unpublished-rights reserved under the Copyright Laws of the United States.”
(i) Relationship to patents. Nothing contained in this clause creates or is intended to imply a license to the Government in any patent or is intended to be construed as affecting the scope of any licenses or other rights otherwise granted to the Government under any patent.
(End of clause)
Alternate I (DEC 2000). As prescribed in 48 CFR 970.2704-3(b), where access to Category C-24 restricted data is contemplated in the performance of a contract the contracting officer shall insert the phrase “and except Restricted Data in category C-24, 10 CFR part 725, in which DOE has reserved the right to receive reasonable compensation for the use of its inventions and discoveries, including related data and technology” after “laser isotope separation” and before the comma in paragraph (b)(2)(ii) of the clause at 48 CFR 970.5227-2, Rights in Data - Technology Transfer, as appropriate.
(End of clause)
970.5227-3 Technology transfer mission.
As prescribed in 48 CFR 970.2770-4(a), insert the following clause:
Technology Transfer Mission (AUG 2019)
This clause has as its purpose implementation of the National Competitiveness Technology Transfer Act of 1989 (Sections 3131, 3132, 3133, and 3157 of Pub. L. 101-189 and as amended by Pub. L. 103-160, Sections 3134 and 3160). The Contractor shall conduct technology transfer activities with a purpose of providing benefit from Federal research to U.S. industrial competitiveness.
(a) Authority.
(1) In order to ensure the full use of the results of research and development efforts of, and the capabilities of, the Laboratory, technology transfer, including Cooperative Research and Development Agreements (CRADAs), is established as a mission of the Laboratory consistent with the policy, principles and purposes of Sections 11(a)
(1) and 12(g) of the Stevenson-Wydler Technology Innovation Act of 1980, as amended (15 U.S.C. 3710a); Section 3132(b) of Pub. L. 101-189, Sections 3134 and 3160 of Pub. L. 103-160, and of Chapter 38 of the Patent Laws (35 U.S.C. 200 et seq.); Section 152 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2182); Section 9 of the Federal Nonnuclear Energy Research and Development Act of 1974 (42 U.S.C. 5908); and Executive Order 12591 of April 10, 1987.
(2) In pursuing the technology transfer mission, the Contractor is authorized to conduct activities including but not limited to: identifying and protecting Intellectual Property made, created or acquired at or by the Laboratory; negotiating licensing agreements and assignments for Intellectual Property made, created or acquired at or by the Laboratory that the Contractor controls or owns; bailments; negotiating all aspects of and entering into CRADAs; providing technical consulting and personnel exchanges; conducting science education activities and reimbursable Strategic Partnership Projects (SPP); providing information exchanges; and making available laboratory or weapon production user facilities. It is fully expected that the Contractor shall use all of the mechanisms available to it to accomplish this technology transfer mission, including, but not limited to, CRADAs, user facilities, SPP, science education activities, consulting, personnel, assignments, and licensing in accordance with this clause.
(b) Definitions.
(1) Contractor's Laboratory Director means the individual who has supervision over all or substantially all of the Contractor's operations at the Laboratory.
(2) Intellectual Property means patents, trademarks, copyrights, mask works, protected CRADA information, and other forms of comparable property rights protected by Federal Law and other foreign counterparts.
(3) Cooperative Research and Development Agreement (CRADA) means any agreement entered into between the Contractor as operator of the Laboratory, and one or more parties including at least one non-Federal party under which the Government, through its laboratory, provides personnel, services, facilities, equipment, intellectual property, or other resources with or without reimbursement (but not funds to non-Federal parties) and the non-Federal parties provide funds, personnel, services, facilities, equipment, intellectual property, or other resources toward the conduct of specified research or development efforts which are consistent with the missions of the Laboratory; except that such term does not include a procurement contract, grant, or cooperative agreement as those terms are used in sections 6303, 6304, and 6305 of Title 31 of the United States Code.
(4) Joint Work Statement (JWS) means a proposal for a CRADA prepared by the Contractor, signed by the Contractor's Laboratory Director or designee which describes the following:
(i) Purpose;
(ii) Scope of Work which delineates the rights and responsibilities of the Government, the Contractor and Third Parties, one of which must be a non-Federal party;
(iii) Schedule for the work; and
(iv) Cost and resource contributions of the parties associated with the work and the schedule.
(5) Assignment means any agreement by which the Contractor transfers ownership of Laboratory Intellectual Property, subject to the Government's retained rights.
(6) Laboratory Biological Materials means biological materials capable of replication or reproduction, such as plasmids, deoxyribonucleic acid molecules, ribonucleic acid molecules, living organisms of any sort and their progeny, including viruses, prokaryote and eukaryote cell lines, transgenic plants and animals, and any derivatives or modifications thereof or products produced through their use or associated biological products, made under this contract by Laboratory employees or through the use of Laboratory research facilities.
(7) Laboratory Tangible Research Product means tangible material results of research which
(i) are provided to permit replication, reproduction, evaluation or confirmation of the research effort, or to evaluate its potential commercial utility;
(ii) are not materials generally commercially available; and
(iii) were made under this contract by Laboratory employees or through the use of Laboratory research facilities.
(8) Bailment means any agreement in which the Contractor permits the commercial or non-commercial transfer of custody, access or use of Laboratory Biological Materials or Laboratory Tangible Research Product for a specified purpose of technology transfer or research and development, including without limitation evaluation, and without transferring ownership to the bailee.
(c) Allowable costs.
(1) The Contractor shall establish and carry out its technology transfer efforts through appropriate organizational elements consistent with the requirements for an Office of Research and Technology Applications (ORTA) pursuant to paragraphs (b) and (c) of Section 11 of the Stevenson-Wydler Technology Innovation Act of 1980, as amended (15 U.S.C. 3710). The costs associated with the conduct of technology transfer through the ORTA including activities associated with obtaining, maintaining, licensing, and assigning Intellectual Property rights, increasing the potential for the transfer of technology, widespread notice of technology transfer opportunities, and early stage and precommercial technology demonstration to remove barriers that limit private sector interest and demonstrate potential commercial applications of any research and technologies arising from Laboratory activities, shall be deemed allowable provided that such costs meet the other requirements of the allowable cost provisions of this Contract. In addition to any separately designated funds, these costs in any fiscal year shall not exceed an amount equal to 0.5 percent of the operating funds included in the Federal research and development budget (including Strategic Partnership Projects) of the Laboratory for that fiscal year without written approval of the contracting officer.
(2) The Contractor's participation in litigation to enforce or defend Intellectual Property claims incurred in its technology transfer efforts shall be as provided in the clause entitled “Insurance - Litigation and Claims” of this contract.
(d) Conflicts of Interest - Technology Transfer. The Contractor shall have implementing procedures that seek to avoid employee and organizational conflicts of interest, or the appearance of conflicts of interest, in the conduct of its technology transfer activities. These procedures shall apply to other persons participating in Laboratory research or related technology transfer activities. Such implementing procedures shall be provided to the contracting officer for review and approval within sixty (60) days after execution of this contract. The contracting officer shall have thirty (30) days thereafter to approve or require specific changes to such procedures. Such implementing procedures shall include procedures to:
(1) Inform employees of and require conformance with standards of conduct and integrity in connection with the CRADA activity in accordance with the provisions of paragraph (n)(5) of this clause;
(2) Review and approve employee activities so as to avoid conflicts of interest arising from commercial utilization activities relating to Contractor-developed Intellectual Property;
(3) Conduct work performed using royalties so as to avoid interference with or adverse effects on ongoing DOE projects and programs;
(4) Conduct activities relating to commercial utilization of Contractor-developed Intellectual Property so as to avoid interference with or adverse effects on user facility or SPP activities of the Contractor;
(5) Conduct DOE-funded projects and programs so as to avoid the appearance of conflicts of interest or actual conflicts of interest with non-Government funded work;
(6) Notify the contracting officer with respect to any new work to be performed or proposed to be performed under the Contract for DOE or other Federal agencies where the new work or proposal involves Intellectual Property in which the Contractor has obtained or intends to request or elect title;
(7) Except as provided elsewhere in this Contract, obtain the approval of the contracting officer for any licensing of or assignment of title to Intellectual Property rights by the Contractor to any business or corporate affiliate of the Contractor;
(8) Obtain the approval of the contracting officer prior to any assignment, exclusive licensing, or option for exclusive licensing, of Intellectual Property to any individual who has been a Laboratory employee within the previous two years or to the company in which the individual is a principal; and
(9) Notify non-Federal sponsors of SPP activities, or non-Federal users of user facilities, of any relevant Intellectual Property interest of the Contractor prior to execution of SPPs or user agreements.
(10) Notify DOE prior to evaluating a proposal by a third party or DOE, when the subject matter of the proposal involves an elected or waived subject invention under this contract or one in which the Contractor intends to elect to retain title under this contract.
(e) Fairness of Opportunity. In conducting its technology transfer activities, the Contractor shall prepare procedures and take all reasonable measures to ensure widespread notice of availability of technologies suited for transfer and opportunities for exclusive licensing and joint research arrangements. The requirement to widely disseminate the availability of technology transfer opportunities does not apply to a specific application originated outside of the Laboratory and by entities other than the Contractor.
(f) U.S. Industrial Competitiveness.
(1) In the interest of enhancing U.S. Industrial Competitiveness, the Contractor shall, in its licensing and assignments of Intellectual Property, give preference in such a manner as to enhance the accrual of economic and technological benefits to the U.S. domestic economy. The Contractor shall consider the following factors in all of its licensing and assignment decisions involving Laboratory intellectual property where the Laboratory obtains rights during the course of the Contractor's operation of the Laboratory under this contract:
(i) whether any resulting design and development will be performed in the United States and whether resulting products, embodying parts, including components thereof, will be substantially manufactured in the United States; or
(ii)
(A) whether the proposed licensee or assignee has a business unit located in the United States and whether significant economic and technical benefits will flow to the United States as a result of the license or assignment agreement; and
(B) in licensing any entity subject to the control of a foreign company or government, whether such foreign government permits United States agencies, organizations or other persons to enter into cooperative research and development agreements and licensing agreements, and has policies to protect United States Intellectual Property rights.
(2) If the Contractor determines that neither of the conditions in paragraphs (f)(1)
(i) or (ii) of this clause are likely to be fulfilled, the Contractor, prior to entering into such an agreement, must obtain the approval of the contracting officer. The contracting officer shall act on any such requests for approval within thirty (30) days.
(3) The Contractor agrees to be bound by the provisions of 35 U.S.C. 204 (Preference for United States industry).
(g) Indemnity - Product Liability. In entering into written technology transfer agreements, including but not limited to, research and development agreements, licenses, assignments and CRADAs, the Contractor agrees to include in such agreements a requirement that the U.S. Government and the Contractor, except for any negligent acts or omissions of the Contractor, be indemnified for all damages, costs, and expenses, including attorneys' fees, arising from personal injury or property damage occurring as a result of the making, using or selling of a product, process or service by or on behalf of the Participant, its assignees or licensees which was derived from the work performed under the agreement. The Contractor shall identify and obtain the approval of the contracting officer for any proposed exceptions to this requirement such as where State or local law expressly prohibit the Participant from providing indemnification or where the research results will be placed in the public domain.
(h) Disposition of Income.
(1) Royalties or other income earned or retained by the Contractor as a result of performance of authorized technology transfer activities herein shall be used by the Contractor for scientific research, development, technology transfer, and education at the Laboratory, consistent with the research and development mission and objectives of the Laboratory and subject to Section 12(b)(5) of the Stevenson-Wydler Technology Innovation Act of 1980, as amended (15 U.S.C. 3710a(b)(5)) and Chapter 38 of the Patent Laws (35 U.S.C. 200 et seq.) as amended through the effective date of this contract award or modification. If the net amounts of such royalties and income received from patent licensing after payment of patenting costs, licensing costs, payments to inventors and other expenses incidental to the administration of Subject Inventions during any fiscal year exceed 5 percent of the Laboratory's budget for that fiscal year, 75 percent of such excess amounts shall be paid to the Treasury of the United States, and the remaining amount of such excess shall be used by the Contractor for the purposes as described above in this paragraph. Any inventions arising out of such scientific research and development activities shall be deemed to be Subject Inventions under the Contract.
(2) The Contractor shall include as a part of its annual Laboratory Institutional Plan or other such annual document a plan setting out those uses to which royalties and other income received as a result of performance of authorized technology transfer activities herein will be applied at the Laboratory, and at the end of the year, provide a separate accounting for how the funds were actually used. Under no circumstances shall these royalties and income be used for an illegal augmentation of funds furnished by the U.S. Government.
(3) The Contractor shall establish subject to the approval of the contracting officer a policy for making awards or sharing of royalties with Contractor employees, other coinventors and coauthors, including Federal employee coinventors when deemed appropriate by the contracting officer.
(i) Transfer to successor contractor. In the event of termination or upon the expiration of this Contract, any unexpended balance of income received for use at the Laboratory shall be transferred, at the contracting officer's request, to a successor contractor, or in the absence of a successor contractor, to such other entity as designated by the contracting officer. The Contractor shall transfer title, as one package, to the extent the Contractor retains title, in all patents and patent applications, licenses, accounts containing royalty revenues from such license agreements, including equity positions in third party entities, and other Intellectual Property rights which arose at the Laboratory, to the successor contractor or to the Government as directed by the contracting officer.
(j) Technology transfer affecting the national security.
(1) The Contractor shall notify and obtain the approval of the contracting officer, prior to entering into any technology transfer arrangement, when such technology or any part of such technology is classified or sensitive under Section 148 of the Atomic Energy Act (42 U.S.C. 2168). Such notification shall include sufficient information to enable DOE to determine the extent that commercialization of such technology would enhance or diminish security interests of the United States, or diminish communications within DOE's nuclear weapon production complex. DOE shall use its best efforts to complete its determination within sixty (60) days of the Contractor's notification, and provision of any supporting information, and DOE shall promptly notify the Contractor as to whether the technology is transferable.
(2) The Contractor shall include in all of its technology transfer agreements with third parties, including, but not limited to, CRADAs, licensing agreements and assignments, notice to such third parties that the export of goods and/or Technical Data from the United States may require some form of export control license or other authority from the U.S. Government and that failure to obtain such export control license may result in criminal liability under U.S. laws.
(3) For other than fundamental research as defined in National Security Decision Directive 189, the Contractor is responsible to conduct internal export control reviews and assure that technology is transferred in accordance with applicable law.
(k) Records. The Contractor shall maintain records of its technology transfer activities in a manner and to the extent satisfactory to the DOE and specifically including, but not limited to, the licensing agreements, assignments and the records required to implement the requirements of paragraphs (e), (f), and (h) of this clause and shall provide reports to the contracting officer to enable DOE to maintain the reporting requirements of Section 12(c)(6) of the Stevenson-Wydler Technology Innovation Act of 1980, as amended (15 U.S.C. 3710a(c)(6)). Such reports shall be made annually in a format to be agreed upon between the Contractor and DOE and in such a format which will serve to adequately inform DOE of the Contractor's technology transfer activities while protecting any data not subject to disclosure under the Rights in Technical Data clause and paragraph (n) of this clause. Such records shall be made available in accordance with the clauses of this Contract pertaining to inspection, audit and examination of records.
(l) Reports to Congress. To facilitate DOE's reporting to Congress, the Contractor is required to submit annually to DOE a technology transfer plan for conducting its technology transfer function for the upcoming year, including plans for securing Intellectual Property rights in Laboratory innovations with commercial promise and plans for managing such innovations so as to benefit the competitiveness of United States industry. This plan shall be provided to the contracting officer on or before October 1st of each year.
(m) Oversight and appraisal. The Contractor is responsible for developing and implementing effective internal controls for all technology transfer activities consistent with the audit and record requirements of this Contract. Laboratory Contractor performance in implementing the technology transfer mission and the effectiveness of the Contractor's procedures will be evaluated by the contracting officer as part of the annual appraisal process, with input from the cognizant Secretarial Officer or program office.
(n) Technology transfer through cooperative research and development agreements. Upon approval of the contracting officer and as provided in a DOE approved Joint Work Statement (JWS), the Laboratory Director, or designee, may enter into CRADAs on behalf of the DOE subject to the requirements set forth in this paragraph.
(1) Review and approval of CRADAs.
(i) Except as otherwise directed in writing by the contracting officer, each JWS shall be submitted to the contracting officer for approval. The Contractor's Laboratory Director or designee shall provide a program mission impact statement and shall include an impact statement regarding related Intellectual Property rights known by the Contractor to be owned by the Government to assist the contracting officer in the approval determination.
(ii) The Contractor shall also include (specific to the proposed CRADA), a statement of compliance with the Fairness of Opportunity requirements of paragraph (e) of this clause.
(iii) Within thirty (30) days after submission of a JWS or proposed CRADA, the contracting officer shall approve, disapprove or request modification to the JWS or CRADA. The contracting officer shall provide a written explanation to the Contractor's Laboratory Director or designee of any disapproval or requirement for modification of a JWS or proposed CRADA.
(iv) Except as otherwise directed in writing by the contracting officer, the Contractor shall not enter into, or begin work under, a CRADA until approval of the CRADA has been granted by the contracting officer. The Contractor may submit its proposed CRADA to the contracting officer at the time of submitting its proposed JWS or any time thereafter.
(2) Selection of participants. The Contractor's Laboratory Director or designee in deciding what CRADA to enter into shall:
(i) Give special consideration to small business firms, and consortia involving small business firms;
(ii) Give preference to business units located in the United States which agree that products or processes embodying Intellectual Property will be substantially manufactured or practiced in the United States and, in the case of any industrial organization or other person subject to the control of a foreign company or government, take into consideration whether or not such foreign government permits United States agencies, organizations, or other persons to enter into cooperative research and development agreements and licensing agreements;
(iii) Provide Fairness of Opportunity in accordance with the requirements of paragraph (e) of this clause; and
(iv) Give consideration to the Conflicts of Interest requirements of paragraph (d) of this clause.
(3) Withholding of data.
(i) Data that is first produced as a result of research and development activities conducted under a CRADA and that would be a trade secret or commercial or financial data that would be privileged or confidential, if such data had been obtained from a non-Federal third party, may be protected from disclosure under the Freedom of Information Act as provided in the Stevenson-Wydler Technology Innovation Act of 1980, as amended (15 U.S.C. 3710a(c)(7)) for a period as agreed in the CRADA of up to five (5)years from the time the data is first produced. The DOE shall cooperate with the Contractor in protecting such data.
(ii) Unless otherwise expressly approved by the contracting officer in advance for a specific CRADA, the Contractor agrees, at the request of the contracting officer, to transmit such data to other DOE facilities for use by DOE or its Contractors by or on behalf of the Government. When data protected pursuant to paragraph (n)(3)(i) of this clause is so transferred, the Contractor shall clearly mark the data with a legend setting out the restrictions against private use and further dissemination, along with the expiration date of such restrictions.
(iii) In addition to its authority to license Intellectual Property, the Contractor may enter into licensing agreements with third parties for data developed by the Contractor under a CRADA subject to other provisions of this Contract. However, the Contractor shall neither use the protection against dissemination nor the licensing of data as an alternative to the submittal of invention disclosures which include data protected pursuant to paragraph (n)(3)(i) of this clause.
(4) Strategic Partnership Projects and user facility programs.
(i) SPP and User Facility Agreements (UFAs) are not CRADAs and will be available for use by the Contractor in addition to CRADAs for achieving utilization of employee expertise and unique facilities for maximizing technology transfer. The Contractor agrees form prospective CRADA participants, which are intending to substantially pay full cost recovery for the effort under a proposed CRADA, of the availability of alternative forms of agreements, i.e., SPP and UFA, and of the Class Patent Waiver provisions associated therewith.
(ii) Where the Contractor believes that the transfer of technology to the U.S. domestic economy will benefit from, or other equity considerations dictate, an arrangement other than the Class Waiver of patent rights to the sponsor in SPP and UFAs, a request may be made to the contracting officer for an exception to the Class Waivers.
(iii) Rights to inventions made under agreements other than funding agreements with third parties shall be governed by the appropriate provisions incorporated, with DOE approval, in such agreements, and the provisions in such agreements take precedence over any disposition of rights contained in this Contract. Disposition of rights under any such agreement shall be in accordance with any DOE class waiver (including Strategic Partnership Projects and User Class Waivers) or individually negotiated waiver which applies to the agreement.
(5) Conflicts of interest.
(i) Except as provided in paragraph (n)(5)(iii) of this clause, the Contractor shall assure that no employee of the Contractor shall have a substantial role (including an advisory role) in the preparation, negotiation, or approval of a CRADA, if, to such employee's knowledge:
(A) Such employee, or the spouse, child, parent, sibling, or partner of such employee, or an organization (other than the Contractor) in which such employee serves as an officer, director, trustee, partner, or employee -
(1) Holds financial interest in any entity, other than the Contractor, that has a substantial interest in the preparation, negotiation, or approval of the CRADA;
(2) Receives a gift or gratuity from any entity, other than the Contractor, that has a substantial interest in the preparation, negotiation, or approval of the CRADA; or
(B) A financial interest in any entity, other than the Contractor, that has a substantial interest in the preparation, negotiation, or approval of the CRADA, is held by any person or organization with whom such employee is negotiating or has any arrangement concerning prospective employment.
(ii) The Contractor shall require that each employee of the Contractor who has a substantial role (including an advisory role) in the preparation, negotiation, or approval of a CRADA certify through the Contractor to the contracting officer that the circumstances described in paragraph (n)(5)(i) of this clause do not apply to that employee.
(iii) The requirements of paragraphs (n)(5)(i) and (n)(5)(ii) of this clause shall not apply in a case where the contracting officer is advised by the Contractor in advance of the participation of an employee described in those paragraphs in the preparation, negotiation or approval of a CRADA of the nature of and extent of any financial interest described in paragraph (n)(5)(i) of this clause, and the contracting officer determines that such financial interest is not so substantial as to be considered likely to affect the integrity of the Contractor employee's participation in the process of preparing, negotiating, or approving the CRADA.
(o) Technology transfer in other cost-sharing agreements. In conducting research and development activities in cost-shared agreements not covered by paragraph (n) of this clause, the Contractor, with prior written permission of the contracting officer, may provide for the withholding of data produced thereunder in accordance with the applicable provisions of paragraph (n)(3) of this clause.
(End of clause)
Alternate I (AUG 2002). As prescribed in 48 CFR 970.2770-4(b), add the following definition under paragraph (b) and the following new paragraph (p):
(b)(8) Privately funded technology transfer means the prosecuting, maintaining, licensing, and marketing of inventions which are not owned by the Government (and not related to CRADAs) when such activities are conducted entirely without the use of Government funds.
(p) Technology partnership ombudsman.
(1) The Contractor agrees to establish a position to be known as “Technology Partnership Ombudsman,” to help resolve complaints from outside organizations regarding the policies and actions of the contractor with respect to technology partnerships (including CRADAs), patents owned by the contractor for inventions made at the laboratory, and technology licensing.
(2) The Ombudsman shall be a senior official of the Contactor's laborratory staff, who is not involved in day-to-day technology partnerships, patents or technology licensing, or, if appointed from outside the laboratory or facility, shall function as such senior official.
(3) The duties of the Technology Partnership Ombudsman shall include:
(i) Serving as the focal point for assisting the public and industry in resolving complaints and disputes with the laboratory or facility regarding technology partnerships, patents, and technology licensing;
(ii) Promoting the use of collaborative alternative dispute resolution techniques such as mediation to facilitate the speedy and low cost resolution of complaints and disputes, when appropriate; and
(iii) Submitting a quarterly report, in a format provided by DOE, to the Secretary of Energy, the Administrator for Nuclear Security, the Director of the DOE Office of Dispute Resolution, and the Contracting Officer concerning the number and nature of complaints and disputes raised, along with the Ombudsman's assessment of their resolution, consistent with the protection of confidential and sensitive information.
(q) Nothing in paragraphs (c) Allowable Costs, (e) Fairness of Opportunity, (f) U.S. Industrial Competitiveness, (g) Indemnity - Product Liability, (h) Disposition of Income, and (i) Transfer to Successor Contractor of this clause are intended to apply to the contractor's privately funded technology transfer activities if such privately funded activities are addressed elsewhere in the contract.
Alternate II (DEC 2000). As prescribed in 48 CFR 970.2770-4(c), the contracting officer shall substitute the phrase “weapon production facility” wherever the word “laboratory” appears in the clause.
970.5227-4 Authorization and consent.
Insert the following clause in solicitations and contracts in accordance with 970.2702-1:
Authorization and Consent (AUG 2002)
(a) The Government authorizes and consents to all use and manufacture of any invention described in and covered by a United States patent in the performance of this contract or any subcontract at any tier.
(b) If the Contractor is sued for copyright infringement or anticipates the filing of such a lawsuit, the Contractor may request authorization and consent to copy a copyrighted work from the contracting officer. Programmatic necessity is a major consideration for DOE in determining whether to grant such request.
(c)
(1) The Contractor agrees to include, and require inclusion of, the Authorization and Consent clause at 52.227-1, without Alternate 1, but suitably modified to identify the parties, in all subcontracts expected to exceed $100,000 at any tier for supplies or services, including construction, architect-engineer services, and materials, supplies, models, samples, and design or testing services.
(2) The Contractor agrees to include, and require inclusion of, paragraph (a) of this Authorization and Consent clause, suitably modified to identify the parties, in all subcontracts at any tier for research and development activities expected to exceed $100,000.
(3) Omission of an authorization and consent clause from any subcontract, including those valued less than $100,000 does not affect this authorization and consent.
(End of clause)
970.5227-5 Notice and assistance regarding patent and copyright infringement.
Insert the following clause in solicitations and contracts in accordance with 970.2702-2:
Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2000)
(a) The Contractor shall report to the Contracting Officer promptly and in reasonable written detail, each notice or claim of patent or copyright infringement based on the performance of this contract of which the Contractor has knowledge.
(b) If any person files a claim or suit against the Government on account of any alleged patent or copyright infringement arising out of the performance of this contract or out of the use of any supplies furnished or work or services performed hereunder, the Contractor shall furnish to the Government, when requested by the Contracting Officer, all evidence and information in possession of the Contractor pertaining to such suit or claim. Except where the Contractor has agreed to indemnify the Government, the Contractor shall furnish such evidence and information at the expense of the Government.
(c) The Contractor agrees to include, and require inclusion of, this clause suitably modified to identify the parties, in all subcontracts at any tier expected to exceed $100,000.
(End of clause)
970.5227-6 Patent indemnity - subcontracts.
Insert the following clause in solicitations and contracts in accordance with 970.2702-3:
Patent Indemnity - Subcontracts (DEC 2000)
Except as otherwise authorized by the Contracting Officer, the Contractor shall obtain indemnification of the Government and its officers, agents, and employees against liability, including costs, for infringement of any United States patent (except a patent issued upon an application that is now or may hereafter be withheld from issue pursuant to a secrecy order by the Government) from Contractor's subcontractors for any contract work subcontracted in accordance with FAR 48 CFR 52.227-3.
(End of clause)
970.5227-7 Royalty information.
Insert the following provision in solicitations in accordance with 970.2702-4:
Royalty Information (DEC 2000)
(a) Cost or charges for royalties. If the response to this solicitation contains costs or charges for royalties totaling more than $250, the following information shall be included in the response relating to each separate item of royalty or license fee:
(1) Name and address of licensor;
(2) Date of license agreement;
(3) Patent numbers, patent application serial numbers, or other basis on which the royalty is payable;
(4) Brief description, including any part or model numbers of each contract item or component on which the royalty is payable;
(5) Percentage or dollar rate of royalty per unit;
(6) Unit price of contract item;
(7) Number of units; and
(8) Total dollar amount of royalties.
(b) Copies of current licenses. In addition, if specifically requested by the Contracting Officer before execution of the contract, the offeror shall furnish a copy of the current license agreement and an identification of applicable claims of specific patents or other basis upon which the royalty may be payable.
(End of provision)
970.5227-8 Refund of royalties.
Insert the following clause in solicitations and contracts in accordance with 970.2702-4:
Refund of Royalties (AUG 2002)
(a) During performance of this Contract, if any royalties are proposed to be charged to the Government as costs under this Contract, the Contractor agrees to submit for approval of the Contracting Officer, prior to the execution of any license, the following information relating to each separate item of royalty:
(1) Name and address of licensor;
(2) Patent numbers, patent application serial numbers, or other basis on which the royalty is payable;
(3) Brief description, including any part or model numbers of each contract item or component on which the royalty is payable;
(4) Percentage or dollar rate of royalty per unit;
(5) Unit price of contract item;
(6) Number of units;
(7) Total dollar amount of royalties; and
(8) A copy of the proposed license agreement.
(b) If specifically requested by the Contracting Officer, the Contractor shall furnish a copy of any license agreement entered into prior to the effective date of this clause and an identification of applicable claims of specific patents or other basis upon which royalties are payable.
(c) The term “royalties” as used in this clause refers to any costs or charges in the nature of royalties, license fees, patent or license amortization costs, or the like, for the use of or for rights in patents and patent applications that are used in the performance of this contract or any subcontract hereunder.
(d) The Contractor shall furnish to the Contracting Officer, annually upon request, a statement of royalties paid or required to be paid in connection with performing this Contract and subcontracts hereunder.
(e) For royalty payments under licenses entered into after the effective date of this Contract, costs incurred for royalties proposed under this paragraph shall be allowable only to the extent that such royalties are approved by the Contracting Officer. If the Contracting Officer determines that existing or proposed royalty payments are inappropriate, any payments subsequent to such determination shall be allowable only to the extent approved by the Contracting Officer.
(f) Regardless of prior DOE approval of any individual payments or royalties, DOE may contest at any time the enforceability, validity, scope of, or title to a patent for which the Contractor makes a royalty or other payment.
(g) If at any time within 3 years after final payment under this contract, the Contractor for any reason is relieved in whole or in part from the payment of any royalties to which this clause applies, the Contractor shall promptly notify the Contracting Officer of that fact and shall promptly reimburse the Government for any refunds received or royalties paid after having received notice of such relief.
(h) The Contractor agrees to include, and require inclusion of, this clause, including this paragraph (h), suitably modified to identify the parties in any subcontract at any tier in which the amount of royalties reported during negotiation of the subcontract exceeds $250.
(End of clause)
970.5227-9 Notice of right to request patent waiver.
Insert the following provision in solicitations in accordance with 970.2704-6:
Notice of Right To Request Patent Waiver (DEC 2000)
Offerors have the right to request a waiver of all or any part of the rights of the United States in inventions conceived or first actually reduced to practice in performance of the contract, in advance of or within 30 days after the effective date of contracting. If such advance waiver is not requested or the request is denied, the Contractor has a continuing right under the contract to request a waiver of the rights of the Government in identified inventions, i.e., individual inventions conceived or first actually reduced to practice in performance of the contract. Contractors that are domestic small businesses and domestic nonprofit organizations may not need a waiver and will have included in their contracts a patent clause reflecting their right to elect title to subject inventions pursuant to the Bayh-Dole Act (35 U.S.C. 200 et seq.).
(End of provision)
970.5227-10 Patent rights - management and operating contracts, nonprofit organization or small business firm contractor.
As prescribed in 970.2703-1(b)(2), insert the following clause:
Patent Rights-Management and Operating Contracts, Nonprofit Organization or Small Business Firm Contractor (DEC 2000)
(a) Definitions.
(1) DOE licensing regulations means the Department of Energy patent licensing regulations at 10 CFR part 781.
(2) Exceptional circumstance subject invention means any subject invention in a technical field or related to a task determined by the Department of Energy to be subject to an exceptional circumstance under 35 U.S.C. 202(a)(ii) and in accordance with 37 CFR 401.3(e).
(3) Invention means any invention or discovery which is or may be patentable or otherwise protectable under Title 35 of the United States Code, or any novel variety of plant which is or may be protected under the Plant Variety Protection Act (7 U.S.C. 2321 et seq.).
(4) Made when used in relation to any invention means the conception or first actual reduction to practice of such invention.
(5) Nonprofit organization means a university or other institution of higher education or an organization of the type described in section 501(c)(3) of the Internal Revenue Code of 1954 (26 U.S.C. 501(c)) and exempt from taxation under section 501(a) of the Internal Revenue Code (26 U.S.C. 501(a)) or any nonprofit scientific or educational organization qualified under a state nonprofit organization statute.
(6) Patent Counsel means the Department of Energy (DOE) Patent Counsel assisting the DOE contracting activity.
(7) Practical application means to manufacture, in the case of a composition or product; to practice, in the case of a process or method; or to operate, in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and that its benefits are, to the extent permitted by law or Government regulations, available to the public on reasonable terms.
(8) Small business firm means a small business concern as defined at section 2 of Pub. L. 85-536 (15 U.S.C. 632) and implementing regulations of the Administrator of the Small Business Administration. For the purpose of this clause, the size standards for small business concerns involved in Government procurement and subcontracting at 13 CFR 121.3-8 and 13 CFR 121.3-12, respectively, are used.
(9) Subject Invention means any invention of the contractor conceived or first actually reduced to practice in the performance of work under this contract, provided that in the case of a variety of plant, the date of determination (as defined in section 41(d) of the Plant Variety Protection Act, 7 U.S.C. 2401(d)) shall also occur during the period of contract performance.
(b) Allocation of Principal Rights.
(1) Retention of title by the Contractor. Except for exceptional circumstance subject inventions, the contractor may retain the entire right, title, and interest throughout the world to each subject invention subject to the provisions of this clause and 35 U.S.C. 203. With respect to any subject invention in which the Contractor retains title, the Federal government shall have a nonexclusive, nontransferable, irrevocable, paid-up license to practice or have practiced for or on behalf of the United States the subject invention throughout the world.
(2) Exceptional circumstance subject inventions. Except to the extent that rights are retained by the Contractor in a determination of exceptional circumstances or granted to a contractor through a determination of greater rights in accordance with subparagraph (b)(4) of this clause, the Contractor does not have a right to retain title to any exceptional circumstance subject inventions and agrees to assign to the Government the entire right, title, and interest, throughout the world, in and to any exceptional circumstance subject inventions.
(i) Inventions within or relating to the following fields of technology are exceptional circumstance subject inventions:
(A) Uranium enrichment technology;
(B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and
(C) National security technologies classified or sensitive under Section 148 of the Atomic Energy Act (42 U.S.C. 2168).
(ii) Inventions made under any agreement, contract or subcontract related to the following are exceptional circumstance subject inventions:
(A) DOE Steel Initiative and Metals Initiative;
(B) U.S. Advanced Battery Consortium; and
(C) Any funding agreement which is funded in part by the Electric Power Research Institute (EPRI) or the Gas Research Institute (GRI).
(iii) DOE reserves the right to unilaterally amend this contract to modify, by deletion or insertion, technical fields, tasks, or other classifications for the purpose of determining DOE exceptional circumstance subject inventions.
(3) Treaties and international agreements. Any rights acquired by the Contractor in subject inventions are subject to any disposition of right, title, or interest in or to subject inventions provided for in treaties or international agreements identified at Appendix [Insert Reference] to this contract. DOE reserves the right to unilaterally amend this contract to identify specific treaties or international agreements entered into or to be entered into by the Government after the effective date of this contract and to effectuate those license or other rights which are necessary for the Government to meet its obligations to foreign governments, their nationals and international organizations under such treaties or international agreements with respect to subject inventions made after the date of the amendment.
(4) Contractor request for greater rights in exceptional circumstance subject inventions. The Contractor may request rights greater than allowed by the exceptional circumstance determination in an exceptional circumstance subject invention by submitting such a request in writing to Patent Counsel at the time the exceptional circumstance subject invention is disclosed to DOE or within eight (8) months after conception or first actual reduction to practice of the exceptional circumstance subject invention, whichever occurs first, unless a longer period is authorized in writing by the Patent Counsel for good cause shown in writing by the Contractor. DOE may, in its discretion, grant or refuse to grant such a request by the Contractor.
(5) Contractor employee-inventor rights. If the Contractor does not elect to retain title to a subject invention or does not request greater rights in an exceptional circumstance subject invention, a Contractor employee-inventor, after consultation with the Contractor and with written authorization from the Contractor in accordance with 10 CFR 784.9(b)(4), may request greater rights, including title, in the subject invention or the exceptional circumstance invention from DOE, and DOE may, in its discretion, grant or refuse to grant such a request by the Contractor employee-inventor.
(6) Government assignment of rights in Government employees' subject inventions. If a Government employee is a joint inventor of a subject invention or of an exceptional circumstance subject invention to which the Contractor has rights, the Government may assign or refuse to assign to the Contractor any rights in the subject invention or exceptional circumstance subject invention acquired by the Government from the Government employee, in accordance with 48 CFR 27.304-1(d). The rights assigned to the Contractor are subject to any provision of this clause that is applicable to subject inventions in which the Contractor retains title, including reservation by the Government of a nonexclusive, nontransferable, irrevocable, paid-up license, except that the Contractor shall file its initial patent application claiming the subject invention or exceptional circumstance invention within one (1) year after the assignment of such rights. The Contractor shall share royalties collected for the manufacture, use or sale of the subject invention with the Government employee.
(c) Subject invention disclosure, election of title and filing of patent application by contractor -
(1) Subject invention disclosure. The contractor will disclose each subject invention to the Patent Counsel within two months after the inventor discloses it in writing to contractor personnel responsible for patent matters. The disclosure to the agency shall be in the form of a written report and shall identify the contract under which the invention was made and the inventor(s) and all sources of funding by B&R code for the invention. It shall be sufficiently complete in technical detail to convey a clear understanding to the extent known at the time of the disclosure, of the nature, purpose, operation, and the physical, chemical, biological or electrical characteristics of the invention. The disclosure shall also identify any publication, on sale or public use of the invention and whether a manuscript describing the invention has been submitted for publication and, if so, whether it has been accepted for publication at the time of disclosure. The disclosure shall include a written statement as to whether the invention falls within an exceptional circumstance field. DOE will make a determination and advise the Contractor within 30 days of receipt of an invention disclosure as to whether the invention is an exceptional circumstance subject invention. In addition, after disclosure to the Patent Counsel, the Contractor will promptly notify the agency of the acceptance of any manuscript describing the invention for publication or of any on sale or public use planned by the contractor. The Contractor shall obtain approval from Patent Counsel prior to any release or publication of information concerning any nonelectable subject invention such as an exceptional circumstance subject invention or any subject invention related to a treaty or international agreement.
(2) Election by the Contractor. Except as provided in paragraph (b)(2) of this clause, the Contractor will elect in writing whether or not to retain title to any such invention by notifying the Federal agency within two years of disclosure to the Federal agency. However, in any case where publication, on sale or public use has initiated the one year statutory period wherein valid patent protection can still be obtained in the United States, the period for election of title may be shortened by the agency to a date that is no more than 60 days prior to the end of the statutory period.
(3) Filing of patent applications by the Contractor. The Contractor will file its initial patent application on a subject invention to which it elects to retain title within one year after election of title or, if earlier, or prior to the end of any 1-year statutory period wherein valid patent protection can be obtained in the United States after a publication, on sale, or public use. The Contractor will file patent applications in additional countries or international patent offices within either ten months of the corresponding initial patent application or six months from the date permission is granted by the Commissioner of Patents and Trademarks to file foreign patent applications where such filing has been prohibited by a Secrecy Order.
(4) Contractor's request for an extension of time. Requests for an extension of the time for disclosure, election, and filing under subparagraphs (c)(1), (2) and (3) may, at the discretion of Patent Counsel, be granted.
(5) Publication approval. During the course of the work under this contract, the Contractor or its employees may desire to release or publish information regarding scientific or technical developments conceived or first actually reduced to practice in the course of or under this contract. In order that public disclosure of such information will not adversely affect the patent interest of DOE or the Contractor, approval for release or publication shall be secured from the Contractor personnel responsible for patent matters prior to any such release or publication. Where DOE's approval of publication is requested, DOE's response to such requests for approval shall normally be provided within 90 days except in circumstances in which a domestic patent application must be filed in order to protect foreign rights. In the case involving foreign patent rights, DOE shall be granted an additional 180 days with which to respond to the request for approval, unless extended by mutual agreement.
(d) Conditions when the Government may obtain title. The Contractor will convey to the DOE, upon written request, title to any subject invention -
(1) If the Contractor fails to disclose or elect title to the subject invention within the times specified in paragraph (c) of this clause, or elects not to retain title; provided, that DOE may only request title within sixty (60) days after learning of the failure of the Contractor to disclose or to elect within the specified times.
(2) In those countries in which the Contractor fails to file a patent application within the times specified in subparagraph (c) of this clause; provided, however, that if the Contractor has filed a patent application in a country after the times specified in subparagraph (c) above, but prior to its receipt of the written request of the DOE, the Contractor shall continue to retain title in that country.
(3) In any country in which the Contractor decides not to continue the prosecution of any application for, to pay the maintenance fees on, or defend in a reexamination or opposition proceeding on, a patent on a subject invention.
(4) If the Contractor requests that DOE acquire title or rights from the Contractor in a subject invention to which the Contractor had initially retained title or rights, or in an exceptional circumstance subject invention to which the Contractor was granted greater rights, DOE may acquire such title or rights from the Contractor, or DOE may decide against acquiring such title or rights from the Contractor, at DOE's sole discretion.
(e) Minimum rights of the Contractor and protection of the Contractor's right to file -
(1) Request for a Contractor license. The Contractor may request the right to reserve a revocable, nonexclusive, royalty-free license throughout the world in each subject invention to which the Government obtains title, except if the Contractor fails to disclose the invention within the times specified in paragraph (c) of this clause. DOE may grant or refuse to grant such a request by the Contractor. When DOE approves such reservation, the Contractor's license will normally extend to its domestic subsidiaries and affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right to grant sublicenses of the same scope to the extent the Contractor was legally obligated to do so at the time the contract was awarded. The license is transferable only with the approval of DOE, except when transferred to the successor of that part of the contractor's business to which the invention pertains.
(2) Revocation or modification of a Contractor license. The Contractor's domestic license may be revoked or modified by DOE to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with applicable provisions at 37 CFR Part 404 and DOE licensing regulations at 10 CFR Part 781. This license will not be revoked in the field of use or the geographical areas in which the Contractor has achieved practical application and continues to make the benefits of the subject invention reasonably accessible to the public. The license in any foreign country may be revoked or modified at the discretion of DOE to the extent the Contractor, its licensees, or the domestic subsidiaries or affiliates have failed to achieve practical application of the subject invention in that foreign country.
(3) Notice of revocation of modification of a Contractor license. Before revocation or modification of the license, DOE will furnish the Contractor a written notice of its intention to revoke or modify the license, and the Contractor will be allowed thirty days (or such other time as may be authorized by DOE for good cause shown by the Contractor) after the notice to show cause why the license should not be revoked or modified. The Contractor has the right to appeal, in accordance with applicable regulations in 37 CFR part 404 and DOE licensing regulations at 10 CFR part 781 concerning the licensing of Government owned inventions, any decision concerning the revocation or modification of the license.
(f) Contractor action to protect the Government's interest -
(1) Execution of delivery of title or license instruments. The Contractor agrees to execute or to have executed, and promptly deliver to the Patent Counsel all instruments necessary to accomplish the following actions:
(i) Establish or confirm the rights the Government has throughout the world in those subject inventions to which the Contractor elects to retain title, and
(ii) Convey title to DOE when requested under subparagraphs (b) or paragraph (d) of this clause and to enable the Government to obtain patent protection throughout the world in that subject invention.
(2) Contractor employee agreements. The Contractor agrees to require, by written agreement, its employees, other than clerical and nontechnical employees, to disclose promptly in writing to Contractor personnel identified as responsible for the administration of patent matters and in a format suggested by the Contractor, each subject invention made under this contract in order that the Contractor can comply with the disclosure provisions of paragraph (c) of this clause, and to execute all papers necessary to file patent applications on subject inventions and to establish the Government's rights in the subject inventions. This disclosure format should require, as a minimum, the information required by subparagraph (c)(1) of this clause. The Contractor shall instruct such employees, through employee agreements or other suitable educational programs, on the importance of reporting inventions in sufficient time to permit the filing of patent applications prior to U.S. or foreign statutory bars.
(3) Notification of discontinuation of patent protection. The contractor will notify the Patent Counsel of any decision not to continue the prosecution of a patent application, pay maintenance fees, or defend in a reexamination or opposition proceeding on a patent, in any country, not less than thirty days before the expiration of the response period required by the relevant patent office.
(4) Notification of Government rights. The contractor agrees to include, within the specification of any United States patent applications and any patent issuing thereon covering a subject invention, the following statement, “This invention was made with government support under (identify the contract) awarded by (identify the Federal agency). The government has certain rights in the invention.”
(5) Invention identification procedures. The Contractor shall establish and maintain active and effective procedures to ensure that subject inventions are promptly identified and timely disclosed and shall submit a written description of such procedures to the Contracting Officer so that the Contracting Officer may evaluate and determine their effectiveness.
(6) Invention filing documentation. If the Contractor files a domestic or foreign patent application claiming a subject invention, the Contractor shall promptly submit to Patent Counsel, upon request, the following information and documents:
(i) The filing date, serial number, title, and a copy of the patent application (including an English-language version if filed in a language other than English);
(ii) An executed and approved instrument fully confirmatory of all Government rights in the subject invention; and
(iii) The patent number, issue date, and a copy of any issued patent claiming the subject invention.
(7) Duplication and disclosure of documents. The Government may duplicate and disclose subject invention disclosures and all other reports and papers furnished or required to be furnished pursuant to this clause; provided, however, that any such duplication or disclosure by the Government is subject to the confidentiality provision at 35 U.S.C. 205 and 37 CFR part 40.
(g) Subcontracts -
(1) Subcontractor subject inventions. The Contractor shall not obtain rights in the subcontractor's subject inventions as part of the consideration for awarding a subcontract.
(2) Inclusion of patent rights clause - non-profit organization or small business firm subcontractors. Unless otherwise authorized or directed by the Contracting Officer, the Contractor shall include the patent rights clause at 48 CFR 952.227-11, suitably modified to identify the parties, in all subcontracts, at any tier, for experimental, developmental, demonstration or research work to be performed by a small business firm or domestic nonprofit organization, except subcontracts which are subject to exceptional circumstances in accordance with 35 U.S.C. 202 and subparagraph (b)(2) of this clause. The subcontractor retains all rights provided for the contractor in the patent rights clause at 48 CFR 952.227-11.
(3) Inclusion of patent rights clause - subcontractors other than non-profit organizations and small business firms. Except for the subcontracts described in subparagraph (g)(2) of this clause, the Contractor shall include the patent rights clause at 48 CFR 952.227-13, suitably modified to identify the parties, in any contract for experimental, developmental, demonstration or research work. For subcontracts subject to exceptional circumstances, the contractor must consult with DOE patent counsel with respect to the appropriate patent clause.
(4) DOE and subcontractor contract. With respect to subcontracts at any tier, DOE, the subcontractor, and the Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and DOE with respect to the matters covered by the clause; provided, however, that nothing in this paragraph is intended to confer any jurisdiction under the Contract Disputes Act in connection with proceedings under paragraph (j) of this clause.
(5) Subcontractor refusal to accept terms of patent clause. If a prospective subcontractor refuses to accept the terms of a patent rights clause, the Contractor shall promptly submit a written notice to the Contracting Officer stating the subcontractor's reasons for such a refusal, including any relevant information for expediting disposition of the matter, and the Contractor shall not proceed with the subcontract without the written authorization of the Contracting Officer.
(6) Notification of award of subcontract. Upon the award of any subcontract at any tier containing a patent rights clause, the Contractor shall promptly notify the Contracting Officer in writing and identify the subcontractor, the applicable patent rights clause, the work to be performed under the subcontract, and the dates of award and estimated completion. Upon request of the Contracting Officer, the Contractor shall furnish a copy of a subcontract.
(7) Identification of subcontractor subject inventions. If the Contractor in the performance of this contract becomes aware of a subject invention made under a subcontract, the Contractor shall promptly notify Patent Counsel and identify the subject invention.
(h) Reporting on utilization of subject inventions. The Contractor agrees to submit to DOE on request, periodic reports, no more frequently than annually, on the utilization of a subject invention or on efforts at obtaining such utilization that are being made by the Contractor or its licensees or assignees. Such reports shall include information regarding the status of development, date of first commercial sale or use, gross royalties received by the Contractor, and such other data and information as DOE may reasonably specify. The Contractor also agrees to provide additional reports as may be requested by DOE in connection with any march-in proceeding undertaken by DOE in accordance with paragraph (j) of this clause. As required by 35 U.S.C. 202(c)(5), DOE agrees it will not disclose such information to persons outside the Government without permission of the Contractor.
(i) Preference for United States Industry. Notwithstanding any other provision of this clause, the Contractor agrees that neither it nor any assignee will grant to any person the exclusive right to use or sell any subject invention in the United States unless such person agrees that any product embodying the subject invention or produced through the use of the subject invention will be manufactured substantially in the United States. However, in individual cases, the requirement for such an agreement may be waived by DOE upon a showing by the Contractor or its assignee that reasonable but unsuccessful efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in the United States or that under the circumstances domestic manufacture is not commercially feasible.
(j) March-in Rights. The Contractor agrees that, with respect to any subject invention in which it has acquired title, DOE has the right in accordance with the procedures in 37 CFR 401.6 and any DOE supplemental regulations to require the Contractor, an assignee or exclusive licensee of a subject invention to grant a nonexclusive, partially exclusive, or exclusive license in any field of use to a responsible applicant or applicants, upon terms that are reasonable under the circumstances, and, if the Contractor, assignee or exclusive licensee refuses such a request, DOE has the right to grant such a license itself if DOE determines that -
(1) Such action is necessary because the Contractor or assignee has not taken, or is not expected to take within a reasonable time, effective steps to achieve practical application of the subject invention in such field of use;
(2) Such action is necessary to alleviate health or safety needs which are not reasonably satisfied by the Contractor, assignee, or their licensees;
(3) Such action is necessary to meet requirements for public use specified by Federal regulations and such requirements are not reasonably satisfied by the Contractor, assignee, or licensees; or
(4) Such action is necessary because the agreement required by paragraph
(i) of this clause has not been obtained or waived, or because a licensee of the exclusive right to use or sell any subject invention in the United States is in breach of such agreement.
(k) Special provisions for contracts with nonprofit organizations. If the Contractor is a nonprofit organization, it agrees that -
(1) DOE approval of assignment of rights. Rights to a subject invention in the United States may not be assigned by the Contractor without the approval of DOE, except where such assignment is made to an organization which has as one of its primary functions the management of inventions; provided, that such assignee will be subject to the same provisions of this clause as the Contractor.
(2) Small business firm licensees. It will make efforts that are reasonable under the circumstances to attract licensees of subject inventions that are small business firms, and that it will give a preference to a small business firm when licensing a subject invention if the Contractor determines that the small business firm has a plan or proposal for marketing the invention which, if executed, is equally as likely to bring the invention to practical application as any plans or proposals from applicants that are not small business firms; provided, that the Contractor is also satisfied that the small business firm has the capability and resources to carry out its plan or proposal. The decision whether to give a preference in any specific case will be at the discretion of the Contractor. However, the Contractor agrees that the Secretary of Commerce may review the Contractor's licensing program and decisions regarding small business firm applicants, and the Contractor will negotiate changes to its licensing policies, procedures, or practices with the Secretary of Commerce when that Secretary's review discloses that the Contractor could take reasonable steps to more effectively implement the requirements of this subparagraph (k)(2).
(3) Contractor licensing of subject inventions. To the extent that it provides the most effective technology transfer, licensing of subject inventions shall be administered by Contractor employees on location at the facility.
(l) Communications. The Contractor shall direct any notification, disclosure or request provided for in this clause to the Patent Counsel assisting the DOE contracting activity.
(m) Reports -
(1) Interim reports. Upon DOE's request, the Contractor shall submit to DOE, no more frequently than annually, a list of subject inventions disclosed to DOE during a specified period, or a statement that no subject inventions were made during the specified period; and a list of subcontracts containing a patent clause and awarded by the Contractor during a specified period, or a statement that no such subcontracts were awarded during the specified period.
(2) Final reports. Upon DOE's request, the Contractor shall submit to DOE, prior to closeout of the contract, a list of all subject inventions disclosed during the performance period of the contract, or a statement that no subject inventions were made during the contract performance period; and a list of all subcontracts containing a patent clause and awarded by the Contractor during the contract performance period, or a statement that no such subcontracts were awarded during the contract performance period.
(n) Examination of Records Relating to Subject Inventions -
(1) Contractor compliance. Until the expiration of three (3) years after final payment under this contract, the Contracting Officer or any authorized representative may examine any books (including laboratory notebooks), records, documents, and other supporting data of the Contractor, which the Contracting Officer or authorized representative deems reasonably pertinent to the discovery or identification of subject inventions, including exceptional circumstance subject inventions, or to determine Contractor compliance with any requirement of this clause.
(2) Unreported inventions. If the Contracting Officer is aware of an invention that is not disclosed by the Contractor to DOE, and the Contracting Officer believes the unreported invention may be a subject invention, including exceptional circumstance subject inventions, DOE may require the Contractor to submit to DOE a disclosure of the invention for a determination of ownership rights.
(3) Confidentiality. Any examination of records under this paragraph is subject to appropriate conditions to protect the confidentiality of the information involved.
(4) Power of inspection. With respect to a subject invention for which the Contractor has responsibility for patent prosecution, the Contractor shall furnish the Government, upon request by DOE, an irrevocable power to inspect and make copies of a prosecution file for any patent application claiming the subject invention.
(o) Facilities License. In addition to the rights of the parties with respect to inventions or discoveries conceived or first actually reduced to practice in the course of or under this contract, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up license in and to any inventions or discoveries regardless of when conceived or actually reduced to practice or acquired by the Contractor at any time through completion of this contract and which are incorporated or embodied in the construction of the facility or which are utilized in the operation of the facility or which cover articles, materials, or product manufactured at the facility
(1) to practice or have practiced by or for the Government at the facility, and (2) to transfer such license with the transfer of that facility. Notwithstanding the acceptance or exercise by the Government of these rights, the Government may contest at any time the enforceability, validity or scope of, or title to, any rights or patents herein licensed.
(p) Atomic Energy -
(1) Pecuniary awards. No claim for pecuniary award of compensation under the provisions of the Atomic Energy Act of 1954, as amended, may be asserted with respect to any invention or discovery made or conceived in the course of or under this contract.
(2) Patent agreements. Except as otherwise authorized in writing by the Contracting Officer, the Contractor shall obtain patent agreements to effectuate the provisions of subparagraph (p)(1) of this clause from all persons who perform any part of the work under this contract, except nontechnical personnel, such as clerical employees and manual laborers.
(q) Classified inventions -
(1) Approval for filing a foreign patent application. The Contractor shall not file or cause to be filed an application or registration for a patent disclosing a subject invention related to classified subject matter in any country other than the United States without first obtaining the written approval of the Contracting Officer.
(2) Transmission of classified subject matter. If in accordance with this clause the Contractor files a patent application in the United States disclosing a subject invention that is classified for reasons of security, the Contractor shall observe all applicable security regulations covering the transmission of classified subject matter. If the Contractor transmits a patent application disclosing a classified subject invention to the United States Patent and Trademark Office (USPTO), the Contractor shall submit a separate letter to the USPTO identifying the contract or contracts by agency and agreement number that require security classification markings to be placed on the patent application.
(3) Inclusion of clause in subcontracts. The Contractor agrees to include the substance of this clause in subcontracts at any tier that cover or are likely to cover subject matter classified for reasons of security.
(r) Patent functions. Upon the written request of the Contracting Officer or Patent Counsel, the Contractor agrees to make reasonable efforts to support DOE in accomplishing patent-related functions for work arising out of the contract, including, but not limited to, the prosecution of patent applications, and the determination of questions of novelty, patentability, and inventorship.
(s) Educational awards subject to 35 U.S.C. 212. The Contractor shall notify the Contracting Officer prior to the placement of any person subject to 35 U.S.C. 212 in an area of technology or task
(1) related to exceptional circumstance technology or (2) which is subject to treaties or international agreements as set forth in paragraph (b)(3) of this clause or agreements other than funding agreements. The Contracting Officer may disapprove of any such placement.
(t) Annual appraisal by Patent Counsel. Patent Counsel may conduct an annual appraisal to evaluate the Contractor's effectiveness in identifying and protecting subject inventions in accordance with DOE policy.
(End of clause)
Alternate 1 Weapons Related Subject Inventions. As prescribed at 970.2703-2(g), insert the following as subparagraphs (a)(10) and (b)(7), respectively:
(a) Definitions. (10) Weapons Related Subject Invention means any subject invention conceived or first actually reduced to practice in the course of or under work funded by or through defense programs , including Department of Defense and intelligence reimbursable work, or the Naval Nuclear Propulsion Program of the Department of Energy or the National Nuclear Security Administration.
(b) Allocation of Principal Rights - (7) Weapons related subject inventions. Except to the extent that DOE is solely satisfied that the Contractor meets certain procedural requirements and DOE grants rights to the Contractor in weapons related subject inventions, the Contractor does not have the right to retain title to any weapons related subject inventions.
(End of alternate)
970.5227-11 Patent rights - management and operating contracts, for-profit contractor, non-technology transfer.
Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(4):
Patent Rights - Management and Operating Contracts, for-Profit Contractor, Non-Technology Transfer (DEC 2000)
(a) Definitions.
(1) DOE licensing regulations means the Department of Energy patent licensing regulations at 10 CFR part 781.
(2) DOE patent waiver regulations means the Department of Energy patent waiver regulations at 10 CFR part 784.
(3) Invention means any invention or discovery which is or may be patentable or otherwise protectable under title 35 of the United States Code, or any novel variety of plant which is or may be protected under the Plant Variety Protection Act (7 U.S.C. 2321, et seq.).
(4) Made when used in relation to any invention means the conception or first actual reduction to practice of such invention.
(5) Patent Counsel means DOE Patent Counsel assisting the contracting activity.
(6) Practical application means to manufacture, in the case of a composition or product; to practice, in the case of a process or method; or to operate, in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and that its benefits are, to the extent permitted by law or Government regulations, available to the public on reasonable terms.
(7) Subject invention means any invention of the contractor conceived or first actually reduced to practice in the course of or under this contract, provided that in the case of a variety of plant, the date of determination (as defined in section 41(d) of the Plant Variety Protection Act, 7 U.S.C. 2401(d)) shall also occur during the period of contract performance.
(b) Allocation of principal rights -
(1) Assignment to the Government. Except to the extent that rights are retained by the Contractor by a determination of greater rights in accordance with subparagraph (b)(2) of this clause or by a request for foreign patent rights in accordance with subparagraph (d)(2) of this clause, the Contractor agrees to assign to the Government the entire right, title, and interest throughout the world in and to each subject invention.
(2) Greater rights determinations. The Contractor, or an Contractor employee-inventor after consultation with the Contractor and with the written authorization of the Contractor in accordance with DOE patent waiver regulations, may request greater rights, including title, in an identified subject invention than the nonexclusive license and the foreign patent rights provided for in paragraph (d) of this clause, in accordance with the DOE patent waiver regulations. Such a request shall be submitted in writing to Patent Counsel with a copy to the Contracting Officer at the time the subject invention is first disclosed to DOE in accordance with subparagraph (c)(2) of this clause, or not later than eight (8) months after such disclosure, unless a longer period is authorized in writing by the Contracting Officer for good cause shown in writing by the Contractor. DOE may grant or refuse to grant such a request by the Contractor or Contractor employee-inventor. Unless otherwise provided in the greater rights determination, any rights in a subject invention obtained by the Contractor pursuant to a determination of greater rights are subject to a nonexclusive, nontransferable, irrevocable, paid-up license to the Government to practice or have practiced the subject invention throughout the world by or on behalf of the Government of the United States (including any Government agency), and to any reservations and conditions deemed appropriate by the Secretary of Energy or designee.
(c) Subject invention disclosures -
(1) Contractor procedures for reporting subject inventions to Contractor personnel. Subject inventions shall be reported to Contractor personnel responsible for patent matters within six (6) months of conception and/or first actual reduction to practice, whichever occurs first in the performance of work under this contract. Accordingly, the Contractor shall establish and maintain effective procedures for ensuring such prompt identification and timely disclosure of subject inventions to Contractor personnel responsible for patent matters, and the procedures shall include the maintenance of laboratory notebooks, or equivalent records, and other records that are reasonably necessary to document the conception and/or the first actual reduction to practice of subject inventions, and the maintenance of records demonstrating compliance with such procedures. The Contractor shall submit a written description of such procedures to the Contracting Officer, upon request, for evaluation of the effectiveness of such procedures by the Contracting Officer.
(2) Subject invention disclosure. The Contractor shall disclose each subject invention to Patent Counsel with a copy to the Contracting Officer within two (2) months after the subject invention is reported to Contractor personnel responsible for patent matters, in accordance with subparagraph (c)(1) of this clause, or, if earlier, within six (6) months after the Contractor has knowledge of the subject invention, but in any event before any on sale, public use, or publication of the subject invention. The disclosure to DOE shall be in the form of a written report and shall include:
(i) The contract number under which the subject invention was made;
(ii) The inventor(s) of the subject invention;
(iii) A description of the subject invention in sufficient technical detail to convey a clear understanding of the nature, purpose and operation of the subject invention, and of the physical, chemical, biological or electrical characteristics of the subject invention, to the extent known by the Contractor at the time of the disclosure;
(iv) The date and identification of any publication, on sale or public use of the invention;
(v) The date and identification of any submissions for publication of any manuscripts describing the invention, and a statement of whether the manuscript is accepted for publication, to the extent known by the Contractor at the time of the disclosure;
(vi) A statement indicating whether the subject invention concerns exceptional circumstances pursuant to 35 U.S.C. 202(ii), related to national security, or subject to a treaty or an international agreement, to the extent known or believed by Contractor at the time of the disclosure;
(vii) All sources of funding by Budget and Resources (B&R) code; and
(viii) The identification of any agreement relating to the subject invention, including Cooperative Research and Development Agreements and Strategic Partnership Projects agreements. Unless the Contractor contends otherwise in writing at the time the invention is disclosed, inventions disclosed to DOE under this paragraph are deemed made in the manner specified in Sections (a)(1) and (a)(2) of 42 U.S.C. 5908.
(3) Publication after disclosure. After disclosure of the subject invention to the DOE, the Contractor shall promptly notify Patent Counsel of the acceptance for publication of any manuscript describing the subject invention or of any expected or on sale or public use of the subject invention, known by the Contractor.
(4) Contractor employee agreements. The Contractor agrees to require, by written agreement, its employees, other than clerical and nontechnical employees, to disclose promptly in writing to Contractor personnel identified as responsible for the administration of patent matters and in a format suggested by the Contractor, each subject invention made under this contract, and to execute all papers necessary to file patent applications claiming subject inventions or to establish the Government's rights in the subject inventions. This disclosure format shall at a minimum include the information required by subparagraph (c)(2) of this clause. The Contractor shall instruct such employees, through employee agreements or other suitable educational programs, on the importance of reporting inventions in sufficient time to permit the filing of patent applications prior to U.S. or foreign statutory bars.
(5) Contractor procedures for reporting subject inventions to DOE. The Contractor agrees to establish and maintain effective procedures for ensuring the prompt identification and timely disclosure of subject inventions to DOE. The Contractor shall submit a written description of such procedures to the Contracting Officer, upon request, for evaluation of the effectiveness of such procedures by the Contracting Officer.
(6) Duplication and disclosure of documents. The Government may duplicate and disclose subject invention disclosures and all other reports and papers furnished or required to be furnished pursuant to this clause; provided, however, that any such duplication or disclosure by the Government is subject to 35 U.S.C. 205 and 37 CFR 401.13.
(d) Minimum rights of the Contractor -
(1) Contractor License - (i) Request for a Contractor license. Except for subject inventions that the Contractor fails to disclose within the time periods specified at subparagraph (c)(2) of this clause, the Contractor may request a revocable, nonexclusive, royalty-free license in each patent application filed in any country claiming a subject invention and any resulting patent in which the Government obtains title, and DOE may grant or refuse to grant such a request by the Contractor. If DOE grants the Contractor's request for a license, the Contractor's license extends to its domestic subsidiaries and affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right to grant sublicenses of the same scope to the extent the Contractor was legally obligated to do so at the time the contract was awarded.
(ii) Transfer of a Contractor license. DOE shall approve any transfer of the Contractor's license in a subject invention, and DOE may determine the Contractor's license is non-transferrable, on a case-by-case basis.
(iii) Revocation or modification of a Contractor license. DOE may revoke or modify the Contractor's domestic license to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with applicable provisions in 37 CFR Part 404 and DOE licensing regulations. DOE may not revoke the Contractor's domestic license in that field of use or the geographical areas in which the Contractor, its licensee, or its domestic subsidiaries or affiliates achieved practical applications and continues to make the benefits of the invention reasonably accessible to the public. DOE may revoke or modify the Contractor's license in any foreign country to the extent the Contractor, its licensees, or its domestic subsidiaries or affiliates failed to achieve practical application in that foreign country.
(iv) Notice of revocation or modification of a Contractor license. Before revocation or modification of the license, DOE shall furnish the Contractor a written notice of its intention to revoke or modify the license, and the Contractor shall be allowed thirty (30) days from the date of the notice (or such other time as may be authorized by DOE for good cause shown by the Contractor) to show cause why the license should not be revoked or modified. The Contractor has the right to appeal any decision concerning the revocation or modification of its license, in accordance with applicable regulations in 37 CFR part 404 and DOE licensing regulations.
(2) Contractor's right to request foreign patent rights. If the Government has title to a subject invention and the Government decides against securing patent rights in a foreign country for the subject invention, the Contractor may request such foreign patent rights from DOE, and DOE may grant the Contractor's request, subject to a nonexclusive, nontransferable, irrevocable, paid-up license to the Government to practice or have practiced the subject invention in the foreign country, and any reservations and conditions deemed appropriate by the Secretary of Energy or designee. Such a request shall be submitted in writing to the Patent Counsel as part of the disclosure required by subparagraph (c)(2) of this clause, with a copy to the DOE Contracting Officer, unless a longer period is authorized in writing by the Contracting Officer for good cause shown in writing by the Contractor. DOE may grant or refuse to grant such a request, and may consider whether granting the Contractor's request best serves the interests of the United States.
(e) Examination of records relating to inventions -
(1) Contractor compliance. Until the expiration of three (3) years after final payment under this contract, the Contracting Officer or any authorized representative may examine any books (including laboratory notebooks), records, and documents and other supporting data of the Contractor, which the Contracting Officer or authorized representative deems reasonably pertinent to the discovery or identification of subject inventions, or to determine Contractor (and inventor) compliance with the requirements of this clause, including proper identification and disclosure of subject inventions, and establishment and maintenance of invention disclosure procedures.
(2) Unreported inventions. If the Contracting Officer is aware of an invention that is not disclosed by the Contractor to DOE, and the Contracting Officer believes the unreported invention may be a subject invention, DOE may require the Contractor to submit to DOE a disclosure of the invention for a determination of ownership rights.
(3) Confidentiality. Any examination of records under this paragraph is subject to appropriate conditions to protect the confidentiality of the information involved.
(f) Subcontracts -
(1) Subcontractor subject inventions. The Contractor shall not obtain rights in the subcontractor's subject inventions as part of the consideration for awarding a subcontract.
(2) Inclusion of patent rights clause - non-profit organization or small business firm subcontractors. Unless otherwise authorized or directed by the Contracting Officer, the Contractor shall include the patent rights clause at 48 CFR 952.227-11, suitably modified to identify the parties in all subcontracts, at any tier, for experimental, developmental, demonstration or research work to be performed by a small business firm or domestic nonprofit organization, except subcontracts which are subject to exceptional circumstances in accordance with 35 U.S.C. 202(a)(ii).
(3) Inclusion of patent rights clause - subcontractors other than non-profit organizations and small business firms. Except for the subcontracts described in subparagraph (f)(2) of this clause, the Contractor shall include the patent rights clause at 48 CFR 952.227-13, suitably modified to identify the parties, in any contract for experimental, developmental, demonstration or research work.
(4) DOE and subcontractor contract. With respect to subcontracts at any tier, DOE, the subcontractor, and the Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and DOE with respect to those matters covered by this clause.
(5) Subcontractor refusal to accept terms of patent rights clause. If a prospective subcontractor refuses to accept the terms of a patent rights clause, the Contractor shall promptly submit a written notice to the Contracting Officer stating the subcontractor's reasons for such a refusal, including any relevant information for expediting disposition of the matter, and the Contractor shall not proceed with the subcontract without the written authorization of the Contracting Officer.
(6) Notification of award of subcontract. Upon the award of any subcontract at any tier containing a patent rights clause, the Contractor shall promptly notify the Contracting Officer in writing and identify the subcontractor, the applicable patent rights clause, the work to be performed under the subcontract, and the dates of award and estimated completion. Upon request of the Contracting Officer, the Contractor shall furnish a copy of a subcontract.
(7) Identification of subcontractor subject inventions. If the Contractor in the performance of this contract becomes aware of a subject invention made under a subcontract, the Contractor shall promptly notify Patent Counsel and identify the subject invention, with a copy of the notification and identification to the Contracting Officer.
(g) Atomic energy -
(1) Pecuniary awards. No claim for pecuniary award of compensation under the provisions of the Atomic Energy Act of 1954, as amended, may be asserted with respect to any invention or discovery made or conceived in the course of or under this contract.
(2) Patent agreements. Except as otherwise authorized in writing by the Contracting Officer, the Contractor shall obtain patent agreements to effectuate the provisions of subparagraph (g)(1) of this clause from all persons who perform any part of the work under this contract, except nontechnical personnel, such as clerical employees and manual laborers.
(h) Publication. The Contractor shall receive approval from Patent Counsel prior to releasing or publishing information regarding scientific or technical developments conceived or first actually reduced to practice in the course of or under this contract, to ensure such release or publication does not adversely affect the patent interests of DOE or the Contractor.
(i) Communications. The Contractor shall direct any notification, disclosure, or request provided for in this clause to the Patent Counsel assisting the DOE contracting activity, with a copy of the communication to the Contracting Officer.
(j) Reports -
(1) Interim reports. Upon DOE's request, the Contractor shall submit to DOE, no more frequently than annually, a list of subject inventions disclosed to DOE during a specified period, or a statement that no subject inventions were made during the specified period; and/or a list of subcontracts containing a patent clause and awarded by the Contractor during a specified period, or a statement that no such subcontracts were awarded during the specified period. The interim report shall state whether the Contractor's invention disclosures were submitted to DOE in accordance with the requirements of subparagraphs (c)
(1) and (c)(5) of this clause.
(2) Final reports. Upon DOE's request, the Contractor shall submit to DOE, prior to closeout of the contract or within three (3) months of the date of completion of the contracted work, a list of all subject inventions disclosed during the performance period of the contract, or a statement that no subject inventions were made during the contract performance period; and/or a list of all subcontracts containing a patent clause and awarded by the Contractor during the contract performance period, or a statement that no such subcontracts were awarded during the contract performance period.
(k) Facilities License. In addition to the rights of the parties with respect to inventions or discoveries conceived or first actually reduced to practice in the course of or under this contract, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up license in and to any inventions or discoveries regardless of when conceived or actually reduced to practice or acquired by the contractor at any time through completion of this contract and which are incorporated or embodied in the construction of the facility or which are utilized in the operation of the facility or which cover articles, materials, or products manufactured at the facility
(1) to practice or have practiced by or for the Government at the facility, and (2) to transfer such license with the transfer of that facility. Notwithstanding the acceptance or exercise by the Government of these rights, the Government may contest at any time the enforceability, validity or scope of, or title to, any rights or patents herein licensed.
(l) Classified inventions -
(1) Approval for filing a foreign patent application. The Contractor shall not file or cause to be filed an application or registration for a patent disclosing a subject invention related to classified subject matter in any country other than the United States without first obtaining the written approval of the Contracting Officer.
(2) Transmission of classified subject matter. If in accordance with this clause the Contractor files a patent application in the United States disclosing a subject invention that is classified for reasons of security, the Contractor shall observe all applicable security regulations covering the transmission of classified subject matter. If the Contractor transmits a patent application disclosing a classified subject invention to the United States Patent and Trademark Office (USPTO), the Contractor shall submit a separate letter to the USPTO identifying the contract or contracts by agency and agreement number that require security classification markings to be placed on the patent application.
(3) Inclusion of clause in subcontracts. The Contractor agrees to include the substance of this clause in subcontracts at any tier that cover or are likely to cover subject matter classified for reasons of security.
(m) Patent functions. Upon the written request of the Contracting Officer or Patent Counsel, the Contractor agrees to make reasonable efforts to support DOE in accomplishing patent-related functions for work arising out of the contract, including, but not limited to, the prosecution of patent applications, and the determination of questions of novelty, patentability, and inventorship.
(n) Annual appraisal by Patent Counsel. Patent Counsel may conduct an annual appraisal to evaluate the Contractor's effectiveness in identifying and protecting subject inventions in accordance with DOE policy.
(End of clause)
970.5227-12 Patent rights - management and operating contracts, for-profit contractor, advance class waiver.
Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(3):
Patent Rights - Management and Operating Contracts, For-Profit Contractor, Advance Class Waiver (DEC 2000)
(a) Definitions.
(1) DOE licensing regulations means the Department of Energy patent licensing regulations at 10 CFR Part 781.
(2) DOE patent waiver regulations means the Department of Energy patent waiver regulations at 10 CFR Part 784.
(3) Exceptional Circumstance Subject Invention means any subject invention in a technical field or related to a task determined by the Department of Energy to be subject to an exceptional circumstance under 35 U.S.C. 202(a)(ii), and in accordance with 37 CFR 401.3(e).
(4) Invention means any invention or discovery which is or may be patentable or otherwise protectable under title 35 of the United States Code, or any novel variety of plant which is or may be protected under the Plant Variety Protection Act (7 U.S.C. 2321, et seq.).
(5) Made when used in relation to any invention means the conception or first actual reduction to practice of such invention.
(6) Patent Counsel means DOE Patent Counsel assisting the contracting activity.
(7) Practical application means to manufacture, in the case of a composition or product; to practice, in the case of a process or method; or to operate, in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and that its benefits are, to the extent permitted by law or Government regulations, available to the public on reasonable terms.
(8) Subject Invention means any invention of the contractor conceived or first actually reduced to practice in the course of or under this contract, provided that in the case of a variety of plant, the date of determination (as defined in section 41(d) of the Plant Variety Protection Act, 7 U.S.C. 2401(d)) shall also occur during the period of contract performance.
(b) Allocation of Principal Rights -
(1) Assignment to the Government. Except to the extent that rights are retained by the Contractor by the granting of an advance class waiver pursuant to subparagraph (b)(2) of this clause or a determination of greater rights pursuant to subparagraph (b)(7) of this clause, the Contractor agrees to assign to the Government the entire right, title, and interest throughout the world in and to each subject invention.
(2) Advance class waiver of Government rights to the Contractor. DOE may grant to the Contractor an advance class waiver of Government rights in any or all subject inventions, at the time of execution of the contract, such that the Contractor may elect to retain the entire right, title and interest throughout the world to such waived subject inventions, in accordance with the terms and conditions of the advance class waiver. Unless otherwise provided by the terms of the advance class waiver, any rights in a subject invention retained by the Contractor under an advance class waiver are subject to 35 U.S.C. 203 and the provisions of this clause, including the Government license provided for in subparagraph (b)(3) of this clause, and any reservations and conditions deemed appropriate by the Secretary of Energy or designee.
(3) Government license. With respect to any subject invention to which the Contractor retains title, either under an advance class waiver pursuant to subparagraph (b)(2) or a determination of greater rights pursuant to subparagraph (b)(7) of this clause, the Government has a nonexclusive, nontransferable, irrevocable, paid-up license to practice or have practiced for or on behalf of the United States the subject invention throughout the world.
(4) Foreign patent rights. If the Government has title to a subject invention and the Government decides against securing patent rights in a foreign country for the subject invention, the Contractor may request such foreign patent rights from DOE, and DOE may grant the Contractor's request, subject to 35 U.S.C. 203 and the provisions of this clause, including the Government license provided for in subparagraph (b)(3) of this clause, and any reservations and conditions deemed appropriate by the Secretary of Energy or designee.
(5) Exceptional circumstance subject inventions. Except to the extent that rights are retained by the Contractor by a determination of greater rights in accordance with subparagraph (b)(7) of this clause, the Contractor does not have the right to retain title to any exceptional circumstance subject inventions and agrees to assign to the Government the entire right, title, and interest, throughout the world, in and to any exceptional circumstance subject inventions.
(i) Inventions within or relating to the following fields of technology are exceptional circumstance subject inventions:
(A) Uranium enrichment technology;
(B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and
(C) National security technologies classified or sensitive under Section 148 of the Atomic Energy Act (42 U.S.C. 2168).
(ii) Inventions made under any agreement, contract or subcontract related to the following initiatives or programs are exceptional circumstance subject inventions:
(A) DOE Steel Initiative and Metals Initiative;
(B) U.S. Advanced Battery Consortium; and
(C) Any funding agreement which is funded in part by the Electric Power Research Institute (EPRI) or the Gas Research Institute (GRI).
(iii) DOE reserves the right to unilaterally amend this contract to modify, by deletion or insertion, technical fields, programs, initiatives, and/or other classifications for the purpose of defining DOE exceptional circumstance subject inventions.
(6) Treaties and international agreements. Any rights acquired by the Contractor in subject inventions are subject to any disposition of right, title, or interest in or to subject inventions provided for in treaties or international agreements identified at Appendix [Insert Reference], to this contract. DOE reserves the right to unilaterally amend this contract to identify specific treaties or international agreements entered into or to be entered into by the Government after the effective date of this contract and to effectuate those license or other rights which are necessary for the Government to meet its obligations to foreign governments, their nationals and international organizations under such treaties or international agreements with respect to subject inventions made after the date of the amendment.
(7) Contractor request for greater rights. The Contractor may request greater rights in an identified subject invention, including an exceptional circumstance subject invention, to which the Contractor does not have the right to elect to retain title, in accordance with the DOE patent waiver regulations, by submitting such a request in writing to Patent Counsel with a copy to the Contracting Officer at the time the subject invention is first disclosed to DOE pursuant to subparagraph (c)(1) of this clause, or not later than eight (8) months after such disclosure, unless a longer period is authorized in writing by the Contracting Officer for good cause shown in writing by the Contractor. DOE may grant or refuse to grant such a request by the Contractor. Unless otherwise provided in the greater rights determination, any rights in a subject invention obtained by the Contractor under a determination of greater rights is subject to 35 U.S.C. 203 and the provisions of this clause, including the Government license provided for in subparagraph (b)(3) of this clause, and to any reservations and conditions deemed appropriate by the Secretary of Energy or designee.
(8) Contractor employee-inventor rights. If the Contractor does not elect to retain title to a subject invention or does not request greater rights in a subject invention, including an exceptional circumstance subject invention, to which the Contractor does not have the right to elect to retain title, a Contractor employee-inventor, after consultation with the Contractor and with written authorization from the Contractor in accordance with 10 CFR 784.9(b)(4), may request greater rights, including title, in the subject invention or the exceptional circumstance invention from DOE, and DOE may grant or refuse to grant such a request by the Contractor employee-inventor.
(9) Government assignment of rights in Government employees' subject inventions. If a DOE employee is a joint inventor of a subject invention to which the Contractor has rights, DOE may assign or refuse to assign any rights in the subject invention acquired by the Government from the DOE employee to the Contractor, consistent with 48 CFR 27.304-1(d). Unless otherwise provided in the assignment, the rights assigned to the Contractor are subject to the Government license provided for in subparagraph (b)(3) of this clause, and to any provision of this clause applicable to subject inventions in which rights are retained by the Contractor, and to any reservations and conditions deemed appropriate by the Secretary of Energy or designee. The Contractor shall share royalties collected for the manufacture, use or sale of the subject invention with the DOE employee.
(c) Subject invention disclosure, election of title, and filing of patent application by Contractor -
(1) Subject invention disclosure. The Contractor shall disclose each subject invention to Patent Counsel with a copy to the Contracting Officer within two (2) months after an inventor discloses it in writing to Contractor personnel responsible for patent matters or, if earlier, within six (6) months after the Contractor has knowledge of the subject invention, but in any event before any on sale, public use, or publication of the subject invention. The disclosure to DOE shall be in the form of a written report and shall include:
(i) The contract number under which the subject invention was made;
(ii) The inventor(s) of the subject invention;
(iii) A description of the subject invention in sufficient technical detail to convey a clear understanding of the nature, purpose and operation of the subject invention, and of the physical, chemical, biological or electrical characteristics of the subject invention, to the extent known by the Contractor at the time of the disclosure;
(iv) The date and identification of any publication, on sale or public use of the invention;
(v) The date and identification of any submissions for publication of any manuscripts describing the invention, and a statement of whether the manuscript is accepted for publication, to the extent known by the Contractor at the time of the disclosure;
(vi) A statement indicating whether the subject invention is an exceptional circumstance subject invention, related to national security, or subject to a treaty or an international agreement, to the extent known or believed by Contractor at the time of the disclosure;
(vii) All sources of funding by Budget and Resources (B&R) code; and
(viii) The identification of any agreement relating to the subject invention, including Cooperative Research and Development Agreements and Strategic Partnership Projects agreements.
Unless the Contractor contends otherwise in writing at the time the invention is disclosed, inventions disclosed to DOE under this paragraph are deemed made in the manner specified in Sections (a)(1) and (a)(2) of 42 U.S.C. 5908.
(2) Publication after disclosure. After disclosure of the subject invention to the DOE, the Contractor shall promptly notify Patent Counsel of the acceptance for publication of any manuscript describing the subject invention or of any expected or on sale or public use of the subject invention, known by the Contractor. The Contractor shall obtain approval from Patent Counsel prior to any release or publication of information concerning an exceptional circumstance subject invention or any subject invention related to a treaty or international agreement.
(3) Election by the Contractor under an advance class waiver. If the Contractor has the right to elect to retain title to subject inventions under an advance class waiver granted in accordance with subparagraph (b)(2) of this clause, and unless otherwise provided for by the terms of the advance class waiver, the Contractor shall elect in writing whether or not to retain title to any subject invention by notifying DOE within two (2) years of the date of the disclosure of the subject invention to DOE, in accordance with subparagraph (c)(1) of this clause. The notification shall identify the advance class waiver, state the countries, including the United States, in which rights are retained, and certify that the subject invention is not an exceptional circumstance subject invention or subject to a treaty or international agreement. If a publication, on sale or public use of the subject invention has initiated the 1-year statutory period under 35 U.S.C. 102(b), the period for election may be shortened by DOE to a date that is no more than sixty (60) days prior to the end of the 1-year statutory period.
(4) Filing of patent applications by the Contractor under an advance class waiver. If the Contractor has the right to retain title to a subject invention in accordance with an advance class waiver pursuant to subparagraph (b)(2) of this clause or a determination of greater rights pursuant to paragraph (b)(7) of this clause, and unless otherwise provided for by the terms of the advance class waiver or greater rights determination, the Contractor shall file an initial patent application claiming the subject invention to which it retains title either within one (1) year after the Contractor's election to retain or grant of title to the subject invention or prior to the end of any 1-year statutory period under 35 U.S.C. 102(b), whichever occurs first. Any patent applications filed by the Contractor in foreign countries or international patent offices shall be filed within either ten (10) months of the corresponding initial patent application or, if such filing has been prohibited by a Secrecy Order, within six (6) months from the date permission is granted by the Commissioner of Patents and Trademarks to file foreign patent applications.
(5) Submission of patent information and documents. If the Contractor files a domestic or foreign patent application claiming a subject invention, the Contractor shall promptly submit to Patent Counsel the following information and documents:
(i) The filing date, serial number, title, and a copy of the patent application (including an English-language version if filed in a language other than English);
(ii) An executed and approved instrument fully confirmatory of all Government rights in the subject invention; and
(iii) The patent number, issue date, and a copy of any issued patent claiming the subject invention.
(6) Contractor's request for an extension of time. Requests for an extension of the time to disclose a subject invention, to elect to retain title to a subject invention, or to file a patent application under subparagraphs (c)(1), (3), and (4) of this clause may be granted at the discretion of Patent Counsel or DOE.
(7) Duplication and disclosure of documents. The Government may duplicate and disclose subject invention disclosures and all other reports and papers furnished or required to be furnished pursuant to this clause; provided, however, that any such duplication or disclosure by the Government is subject to 35 U.S.C. 205 and 37 CFR part 40.
(d) Conditions when the Government may obtain title notwithstanding an advance class waiver -
(1) Return of title to a subject invention. If the Contractor requests that DOE acquire title or rights from the Contractor in a subject invention, including an exceptional circumstance subject invention, to which the Contractor retained title or rights under subparagraph (b)(2) or subparagraph (b)(7) of this clause, DOE may acquire such title or rights from the Contractor, or DOE may decide against acquiring such title or rights from the Contractor, at DOE's sole discretion.
(2) Failure to disclose or elect to retain title. Title vests in DOE and DOE may request, in writing, a formal assignment of title to a subject invention from the Contractor, and the Contractor shall convey title to the subject invention to DOE, if the Contractor elects not to retain title to the subject invention under an advance class waiver, or the Contractor fails to disclose or fails to elect to retain title to the subject invention within the times specified in subparagraphs (c)(1) and (c)(3) of this clause.
(3) Failure to file domestic or foreign patent applications. In those countries in which the Contractor fails to file a patent application within the times specified in subparagraph (c)(4) of this clause, DOE may request, in writing, title to the subject invention from the Contractor, and the Contractor shall convey title to the subject invention to DOE; provided, however, that if the Contractor has filed a patent application in any country after the times specified in subparagraph (c)(4) of this clause, but prior to its receipt of DOE's written request for title, the Contractor continues to retain title in that country.
(4) Discontinuation of patent protection by the Contractor. If the Contractor decides to discontinue the prosecution of a patent application, the payment of maintenance fees, or the defense of a subject invention in a reexamination or opposition proceeding, in any country, DOE may request, in writing, title to the subject invention from the Contractor, and the Contractor shall convey title to the subject invention to DOE.
(5) Termination of advance class waiver. DOE may request, in writing, title to any subject inventions from the Contractor, and the Contractor shall convey title to the subject inventions to DOE, if the advance class waiver granted under subparagraph (b)(2) of this clause is terminated under paragraph (u) of this clause.
(e) Minimum rights of the Contractor -
(1) Request for a Contractor license. Except for subject inventions that the Contractor fails to disclose within the time periods specified at subparagraph (c)
(1) of this clause, the Contractor may request a revocable, nonexclusive, royalty-free license in each patent application filed in any country claiming a subject invention and any resulting patent in which the Government obtains title, and DOE may grant or refuse to grant such a request by the Contractor. If DOE grants the Contractor's request for a license, the Contractor's license extends to its domestic subsidiaries and affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right to grant sublicenses of the same scope to the extent the Contractor was legally obligated to do so at the time the contract was awarded.
(2) Transfer of a Contractor license. DOE shall approve any transfer of the Contractor's license in a subject invention, and DOE may determine that the Contractor's license is non-transferrable, on a case-by-case basis.
(3) Revocation or modification of a Contractor license. DOE may revoke or modify the Contractor's domestic license to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with applicable provisions in 37 CFR Part 404 and DOE licensing regulations. DOE may not revoke the Contractor's domestic license in that field of use or the geographical areas in which the Contractor, its licensees or its domestic subsidiaries or affiliates have achieved practical applications and continues to make the benefits of the invention reasonably accessible to the public. DOE may revoke or modify the Contractor's license in any foreign country to the extent the Contractor, its licensees, or its domestic subsidiaries or affiliates failed to achieve practical application in that foreign country.
(4) Notice of revocation or modification of a Contractor license. Before revocation or modification of the license, DOE shall furnish the Contractor a written notice of its intention to revoke or modify the license, and the Contractor shall be allowed thirty (30) days from the date of the notice (or such other time as may be authorized by DOE for good cause shown by the Contractor) to show cause why the license should not be revoked or modified. The Contractor has the right to appeal any decision concerning the revocation or modification of its license, in accordance with applicable regulations in 37 CFR part 404 and DOE licensing regulations.
(f) Contractor action to protect the Government's interest -
(1) Execution and delivery of title or license instruments. The Contractor agrees to execute or have executed, and to deliver promptly to DOE all instruments necessary to accomplish the following actions:
(i) Establish or confirm the Government's rights throughout the world in subject inventions to which the Contractor elects to retain title;
(ii) Convey title in a subject invention to DOE pursuant to subparagraph (b)(5) and paragraph (d) of this clause; or
(iii) Enable the Government to obtain patent protection throughout the world in a subject invention to which the Government has title.
(2) Contractor employee agreements. The Contractor agrees to require, by written agreement, its employees, other than clerical and nontechnical employees, to disclose promptly in writing to Contractor personnel identified as responsible for the administration of patent matters and in a format suggested by the Contractor, each subject invention made under this contract, and to execute all papers necessary to file patent applications claiming subject inventions or to establish the Government's rights in the subject inventions. This disclosure format shall at a minimum include the information required by subparagraph (c)(1) of this clause. The Contractor shall instruct such employees, through employee agreements or other suitable educational programs, on the importance of reporting inventions in sufficient time to permit the filing of patent applications prior to U.S. or foreign statutory bars.
(3) Contractor procedures for reporting subject inventions to DOE. The Contractor agrees to establish and maintain effective procedures for ensuring the prompt identification and timely disclosure of subject inventions to DOE. The Contractor shall submit a written description of such procedures to the Contracting Officer, upon request, for evaluation and approval of the effectiveness of such procedures by the Contracting Officer.
(4) Notification of discontinuation of patent protection. With respect to any subject invention for which the Contractor has responsibility for patent prosecution, the Contractor shall notify Patent Counsel of any decision to discontinue the prosecution of a patent application, payment of maintenance fees, or defense of a subject invention in a reexamination or opposition proceeding, in any country, not less than thirty (30) days before the expiration of the response period for any action required by the corresponding patent office.
(5) Notification of Government rights. With respect to any subject invention to which the Contractor has title, the Contractor agrees to include, within the specification of any United States patent application and within any patent issuing thereon claiming a subject invention, the following statement, “This invention was made with Government support under (identify the contract) awarded by the United States Department of Energy. The Government has certain rights in the invention.”
(6) Avoidance of royalty charges. If the Contractor licenses a subject invention, the Contractor agrees to avoid royalty charges on acquisitions involving Government funds, including funds derived through a Military Assistance Program of the Government or otherwise derived through the Government, to refund any amounts received as royalty charges on a subject invention in acquisitions for, or on behalf of, the Government, and to provide for such refund in any instrument transferring rights in the subject invention to any party.
(7) DOE approval of assignment of rights. Rights in a subject invention in the United States may not be assigned by the Contractor without the approval of DOE.
(8) Small business firm licensees. The Contractor shall make efforts that are reasonable under the circumstances to attract licensees of subject inventions that are small business firms, and may give a preference to a small business firm when licensing a subject invention if the Contractor determines that the small business firm has a plan or proposal for marketing the invention which, if executed, is equally as likely to bring the invention to practical application as any plans or proposals from applicants that are not small business firms; provided, the Contractor is also satisfied that the small business firm has the capability and resources to carry out its plan or proposal. The decision as to whether to give a preference in any specific case is at the discretion of the Contractor.
(9) Contractor licensing of subject inventions. To the extent that it provides the most effective technology transfer, licensing of subject inventions shall be administered by Contractor employees on location at the facility.
(g) Subcontracts -
(1) Subcontractor subject inventions. The Contractor shall not obtain rights in the subcontractor's subject inventions as part of the consideration for awarding a subcontract.
(2) Inclusion of patent rights clause - non-profit organization or small business firm subcontractors. Unless otherwise authorized or directed by the Contracting Officer, the Contractor shall include the patent rights clause at 48 CFR 952.227-11, suitably modified to identify the parties, in all subcontracts, at any tier, for experimental, developmental, demonstration or research work to be performed by a small business firm or domestic nonprofit organization, except subcontracts which are subject to exceptional circumstances in accordance with 35 U.S.C. 202 and subparagraph (b)(5) of this clause.
(3) Inclusion of patent rights clause - subcontractors other than non-profit organizations or small business firms. Except for the subcontracts described in subparagraph (g)(2) of this clause, the Contractor shall include the patent rights clause at 48 CFR 952.227-13, suitably modified to identify the parties and any applicable exceptional circumstance, in any contract for experimental, developmental, demonstration or research work.
(4) DOE and subcontractor contract. With respect to subcontracts at any tier, DOE, the subcontractor and Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and DOE with respect to those matters covered by this clause; provided, however, that nothing in this paragraph is intended to confer any jurisdiction under the Contract Disputes Act in connection with proceedings under paragraph (j) of this clause.
(5) Subcontractor refusal to accept terms of patent rights clause. If a prospective subcontractor refuses to accept the terms of a patent rights clause, the Contractor shall promptly submit a written notice to the Contracting Officer stating the subcontractor's reasons for such refusal and including relevant information for expediting disposition of the matter; and the Contractor shall not proceed with the subcontract without the written authorization of the Contracting Officer.
(6) Notification of award of subcontract. Upon the award of any subcontract at any tier containing a patent rights clause, the Contractor shall promptly notify the Contracting Officer in writing and identify the subcontractor, the applicable patent rights clause, the work to be performed under the subcontract, and the dates of award and estimated completion. Upon request of the Contracting Officer, the Contractor shall furnish a copy of a subcontract.
(7) Identification of subcontractor subject inventions. If the Contractor in the performance of this contract becomes aware of a subject invention made under a subcontract, the Contractor shall promptly notify Patent Counsel and identify the subject invention, with a copy of the notification and identification to the Contracting Officer.
(h) Reporting on utilization of subject inventions. Upon request by DOE, the Contractor agrees to submit periodic reports, no more frequently than annually, describing the utilization of a subject invention or efforts made by the Contractor or its licensees or assignees to obtain utilization of the subject invention. The reports shall include information regarding the status of development, date of first commercial sale or use, gross royalties received by the Contractor, and other data and information reasonably specified by DOE. Upon request by DOE, the Contractor also agrees to provide reports in connection with any march-in proceedings undertaken by DOE, in accordance with paragraph (j) of this clause. If any data or information reported by the Contractor in accordance with this provision is considered privileged and confidential by the Contractor, its licensee, or assignee and the Contractor properly marks the data or information privileged or confidential, DOE agrees not to disclose such information to persons outside the Government, to the extent permitted by law.
(i) Preference for United States industry. Notwithstanding any other provision of this clause the Contractor agrees that with respect to any subject invention in which it retains title, neither it nor any assignee may grant to any person the exclusive right to use or sell any subject invention in the United States unless such person agrees that any products embodying the subject invention or produced through the use of the subject invention will be manufactured substantially in the United States. However, in individual cases, DOE may waive the requirement for such an agreement upon a showing by the Contractor or its assignee that reasonable but unsuccessful efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in the United States or that under the circumstances domestic manufacture is not commercially feasible.
(j) March-In rights. With respect to any subject invention to which the Contractor has elected to retain or is granted title, DOE may, in accordance with the procedures in the DOE patent waiver regulations, require the Contractor, an assignee or exclusive licensee of a subject invention to grant a nonexclusive, partially exclusive or exclusive license in any field of use to a responsible applicant or applicants, upon terms that are reasonable under the circumstances. If the Contractor, assignee or exclusive licensee refuses such a request, DOE has the right to grant such a license itself if DOE determines that -
(1) Such action is necessary because the Contractor or assignee has not taken, or is not expected to take within a reasonable time, effective steps to achieve practical application of the subject invention in such field of use;
(2) Such action is necessary to alleviate health or safety needs that are not reasonably satisfied by the Contractor, assignee, or their licensees;
(3) Such action is necessary to meet requirements for public use specified by government regulations and such requirements are not reasonably satisfied by the Contractor, assignee, or licensees; or
(4) Such action is necessary because the agreement to substantially manufacture in the United States and required by paragraph
(i) of this clause has neither been obtained nor waived or because a licensee of the exclusive right to use or sell any subject invention in the United States is in breach of such agreement.
(k) Communications. The Contractor shall direct any notification, disclosure, or request provided for in this clause to the Patent Counsel identified in the contract.
(l) Reports -
(1) Interim reports. Upon DOE's request, the Contractor shall submit to DOE, no more frequently than annually, a list of subject inventions disclosed to DOE during a specified period, or a statement that no subject inventions were made during the specified period; and/or a list of subcontracts containing a patent clause and awarded by the Contractor during a specified period, or a statement that no such subcontracts were awarded during the specified period. The interim report shall state whether the Contractor's invention disclosures were submitted to DOE in accordance with the requirements of subparagraphs (f)(3) and (f)(4) of this clause.
(2) Final reports. Upon DOE's request, the Contractor shall submit to DOE, prior to closeout of the contract or within three (3) months of the date of completion of the contracted work, a list of all subject inventions disclosed during the performance period of the contract, or a statement that no subject inventions were made during the contract performance period; and/or a list of all subcontracts containing a patent clause and awarded by the Contractor during the contract performance period, or a statement that no such subcontracts were awarded during the contract performance period.
(m) Facilities License. In addition to the rights of the parties with respect to inventions or discoveries conceived or first actually reduced to practice in the course of or under this contract, the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up license in and to any inventions or discoveries regardless of when conceived or actually reduced to practice or acquired by the contractor at any time through completion of this contract and which are incorporated or embodied in the construction of the facility or which are utilized in the operation of the facility or which cover articles, materials, or products manufactured at the facility
(1) to practice or have practiced by or for the Government at the facility, and (2) to transfer such license with the transfer of that facility. Notwithstanding the acceptance or exercise by the Government of these rights, the Government may contest at any time the enforceability, validity or scope of, or title to, any rights or patents herein licensed.
(n) Atomic energy -
(1) Pecuniary awards. No claim for pecuniary award of compensation under the provisions of the Atomic Energy Act of 1954, as amended, may be asserted with respect to any invention or discovery made or conceived in the course of or under this contract.
(2) Patent agreements. Except as otherwise authorized in writing by the Contracting Officer, the Contractor shall obtain patent agreements to effectuate the provisions of subparagraph (o)(1) of this clause from all persons who perform any part of the work under this contract, except nontechnical personnel, such as clerical employees and manual laborers.
(o) Classified inventions -
(1) Approval for filing a foreign patent application. The Contractor shall not file or cause to be filed an application or registration for a patent disclosing a subject invention related to classified subject matter in any country other than the United States without first obtaining the written approval of the Contracting Officer.
(2) Transmission of classified subject matter. If in accordance with this clause the Contractor files a patent application in the United States disclosing a subject invention that is classified for reasons of security, the Contractor shall observe all applicable security regulations covering the transmission of classified subject matter. If the Contractor transmits a patent application disclosing a classified subject invention to the United States Patent and Trademark Office (USPTO), the Contractor shall submit a separate letter to the USPTO identifying the contract or contracts by agency and agreement number that require security classification markings to be placed on the patent application.
(3) Inclusion of clause in subcontracts. The Contractor agrees to include the substance of this clause in subcontracts at any tier that cover or are likely to cover subject matter classified for reasons of security.
(p) Examination of records relating to inventions -
(1) Contractor compliance. Until the expiration of three (3) years after final payment under this contract, the Contracting Officer or any authorized representative may examine any books (including laboratory notebooks), records, and documents and other supporting data of the Contractor, which the Contracting Officer or authorized representative deems reasonably pertinent to the discovery or identification of subject inventions, including exceptional circumstance subject inventions, or to determine Contractor (and inventor) compliance with the requirements of this clause, including proper identification and disclosure of subject inventions, and establishment and maintenance of invention disclosure procedures.
(2) Unreported inventions. If the Contracting Officer is aware of an invention that is not disclosed by the Contractor to DOE, and the Contracting Officer believes the unreported invention may be a subject invention, DOE may require the Contractor to submit to DOE a disclosure of the invention for a determination of ownership rights.
(3) Confidentiality. Any examination of records under this paragraph is subject to appropriate conditions to protect the confidentiality of the information involved.
(4) Power of inspection. With respect to a subject invention for which the Contractor has responsibility for patent prosecution, the Contractor shall furnish the Government, upon request by DOE, an irrevocable power to inspect and make copies of a prosecution file for any patent application claiming the subject invention.
(q) Patent functions. Upon the written request of the Contracting Officer or Patent Counsel, the Contractor agrees to make reasonable efforts to support DOE in accomplishing patent-related functions for work arising out of the contract, including, but not limited to, the prosecution of patent applications, and the determination of questions of novelty, patentability, and inventorship.
(r) Educational awards subject to 35 U.S.C. 212. The Contractor shall notify the Contracting Officer prior to the placement of any person subject to 35 U.S.C. 212 in an area of technology or task
(1) related to exceptional circumstance technology or (2) any person who is subject to treaties or international agreements as set forth in paragraph (b)(6) of this clause or to agreements other than funding agreements. The Contracting Officer may disapprove of any such placement.
(s) Annual appraisal by Patent Counsel. Patent Counsel may conduct an annual appraisal to evaluate the Contractor's effectiveness in identifying and protecting subject inventions in accordance with DOE policy.
(t) Publication. The Contractor shall receive approval from Patent Counsel prior to releasing or publishing information regarding scientific or technical developments conceived or first actually reduced to practice in the course of or under this contract, to ensure such release or publication does not adversely affect the patent rights of DOE or the Contractor.
(u) Termination of contractor's advance class waiver. If a request by the Contractor for an advance class waiver pursuant to subparagraph (b)(2) of this clause or a determination of greater rights pursuant to paragraph (c) of this clause contains false material statements or fails to disclose material facts, and DOE relies on the false statements or omissions in granting the Contractor's request, the waiver or grant of any Government rights (in whole or in part) to the subject invention(s) may be terminated at the discretion of the Secretary of Energy or designee. Prior to termination, DOE shall provide the Contractor with written notification of the termination, including a statement of facts in support of the termination, and the Contractor shall be allowed thirty (30) days, or a longer period authorized by the Secretary of Energy or designee for good cause shown in writing by the Contractor, to show cause for not terminating the waiver or grant. Any termination of an advance class waiver or a determination of greater rights is subject to the Contractor's license as provided for in paragraph (f) of this clause.
(End of clause)
Alternate 1 Weapons Related Subject Inventions. As prescribed at 970.2703-2(g), insert the following as subparagraphs (a)(9)and (b)(10), respectively:
(a) Definitions. (9) Weapons Related Subject Invention means any subject invention conceived or first actually reduced to practice in the course of or under work funded by or through defense programs, including Department of Defense and intelligence reimbursable work, or the Naval Nuclear Propulsion Program of the Department of Energy or the National Nuclear Security Administration.
(b) Allocation of Principal Rights. (10) Weapons related subject inventions. Except to the extent that DOE is solely satisfied that the Contractor meets certain procedural requirements and DOE grants rights to the Contractor in weapons related subject inventions, the Contractor does not have a right to retain title to any weapons related subject inventions.
(End of alternate)
970.5228-1 Insurance - litigation and claims.
As prescribed in 970.2803-2, insert the following clause:
Insurance - Litigation and Claims (JUL 2013)
(a) The contractor must comply with 10 CFR part 719, Contractor Legal Management Requirements, if applicable.
(b)
(1) Except as provided in paragraph (b)(2) of this clause, the contractor shall procure and maintain such bonds and insurance as required by law or approved in writing by the Contracting Officer.
(2) The contractor may, with the approval of the Contracting Officer, maintain a self-insurance program in accordance with FAR 28.308; provided that, with respect to workers' compensation, the contractor is qualified pursuant to statutory authority.
(3) All bonds and insurance required by this clause shall be in a form and amount and for those periods as the Contracting Officer may require or approve and with sureties and insurers approved by the Contracting Officer.
(c) The contractor agrees to submit for the Contracting Officer's approval, to the extent and in the manner required by the Contracting Officer, any other bonds and insurance that are maintained by the contractor in connection with the performance of this contract and for which the contractor seeks reimbursement. If an insurance cost (whether a premium for commercial insurance or related to self-insurance) includes a portion covering costs made unallowable elsewhere in the contract, and the share of the cost for coverage for the unallowable cost is determinable, the portion of the cost that is otherwise an allowable cost under this contract is reimbursable to the extent determined by the Contracting Officer.
(d) Except as provided in paragraph (f) of this clause, or specifically disallowed elsewhere in this contract, the contractor shall be reimbursed -
(1) For that portion of the reasonable cost of bonds and insurance allocable to this contract required in accordance with contract terms or approved under this clause, and
(2) For liabilities (and reasonable expenses incidental to such liabilities, including litigation costs) to third persons not compensated by insurance without regard to the clause of this contract entitled “Obligation of Funds.”
(e) The Government's liability under paragraph (d) of this clause is subject to the availability of appropriated funds. Nothing in this contract shall be construed as implying that the Congress will, at a later date, appropriate funds sufficient to meet deficiencies.
(f)
(1) Notwithstanding any other provision of this contract, the contractor shall not be reimbursed for liabilities to third parties, including contractor employees, and directly associated costs which may include but are not limited to litigation costs, counsel fees, judgments and settlements -
(i) Which are otherwise unallowable by law or the provisions of this contract, including the cost reimbursement limitations contained in 48 CFR part 31, as supplemented by 48 CFR 970.31;
(ii) For which the contractor has failed to insure or to maintain insurance as required by law, this contract, or by the written direction of the Contracting Officer; or
(iii) Which were caused by contractor managerial personnel's -
(A) Willful misconduct;
(B) Lack of good faith; or
(C) Failure to exercise prudent business judgment, which means failure to act in the same manner as a prudent person in the conduct of competitive business; or, in the case of a non-profit educational institution, failure to act in the manner that a prudent person would under the circumstances prevailing at the time the decision to incur the cost is made.
(2) The term “contractor's managerial personnel” is defined in the Property clause in this contract.
(g)
(1) All litigation costs, including counsel fees, judgments and settlements shall be segregated and accounted for by the contractor separately. If the Contracting Officer provisionally disallows such costs, then the contractor may not use funds advanced by DOE under the contract to finance the litigation.
(2) Punitive damages are not allowable unless the act or failure to act which gave rise to the liability resulted from compliance with specific terms and conditions of the contract or written instructions from the Contracting Officer.
(3) The portion of the cost of insurance obtained by the contractor that is allocable to coverage of liabilities referred to in paragraph (f) of this clause is not allowable.
(h) The contractor may at its own expense and not as an allowable cost procure for its own protection insurance to compensate the contractor for any unallowable or non-reimbursable costs incurred in connection with contract performance.
(End of clause)
970.5229-1 State and local taxes.
As prescribed in 970.2904-1(b), insert the following clause in management and operating contracts. The requirement for the notice prescribed in paragraph (a) of the clause may be broadened to include all State and local taxes which may be claimed as allowable costs when considered to be appropriate.
State and Local Taxes (DEC 2000)
(a) The Contractor agrees to notify the Contracting Officer of any State or local tax, fee, or charge levied or purported to be levied on or collected from the Contractor with respect to the contract work, any transaction thereunder, or property in the custody or control of the Contractor and constituting an allowable item of cost if due and payable, but which the Contractor has reason to believe, or the Contracting Officer has advised the Contractor, is or may be inapplicable or invalid; and the Contractor further agrees to refrain from paying any such tax, fee, or charge unless authorized in writing by the Contracting Officer. Any State or local tax, fee, or charge paid with the approval of the Contracting Officer or on the basis of advice from the Contracting Officer that such tax, fee, or charge is applicable and valid, and which would otherwise be an allowable item of cost, shall not be disallowed as an item of cost by reason of any subsequent ruling or determination that such tax, fee, or charge was in fact inapplicable or invalid.
(b) The Contractor agrees to take such action as may be required or approved by the Contracting Officer to cause any State or local tax, fee, or charge which would be an allowable cost to be paid under protest; and to take such action as may be required or approved by the Contracting Officer to seek recovery of any payments made, including assignment to the Government or its designee of all rights to an abatement or refund thereof, and granting permission for the Government to join with the Contractor in any proceedings for the recovery thereof or to sue for recovery in the name of the Contractor. If the Contracting Officer directs the Contractor to institute litigation to enjoin the collection of or to recover payment of any such tax, fee, or charge referred to above, or if a claim or suit is filed against the Contractor for a tax, fee, or charge it has refrained from paying in accordance with this clause, the procedures and requirements of the clause entitled “Insurance - Litigation and Claims” shall apply and the costs and expenses incurred by the Contractor shall be allowable items of costs, as provided in this contract, together with the amount of any judgment rendered against the Contractor.
(c) The Government shall hold the Contractor harmless from penalties and interest incurred through compliance with this clause. All recoveries or credits in respect of the foregoing taxes, fees, and charges (including interest) shall inure to and be for the sole benefit of the Government.
(End of clause)
970.5231-4 Preexisting conditions.
As prescribed in 970.3170, insert the following clause:
Preexisting Conditions (DEC 2000)
(a) The Department of Energy agrees to reimburse the Contractor, and the Contractor shall not be held responsible, for any liability (including without limitation, a claim involving strict or absolute liability and any civil fine or penalty), expense, or remediation cost, but limited to those of a civil nature, which may be incurred by, imposed on, or asserted against the Contractor arising out of any condition, act, or failure to act which occurred before the Contractor assumed responsibility on [Insert date contract began]. To the extent the acts or omissions of the Contractor cause or add to any liability, expense or remediation cost resulting from conditions in existence prior to [Insert date contract began], the Contractor shall be responsible in accordance with the terms and conditions of this contract.
(b) The obligations of the Department of Energy under this clause are subject to the availability of appropriated funds.
(End of clause)
Alternate I (DEC 2000). As prescribed in 970.3170 (a), in contracts with incumbent management and operating contractors, substitute the following for paragraph (a) of the basic clause:
(a) Any liability, obligation, loss, damage, claim (including without limitation, a claim involving strict or absolute liability), action, suit, civil fine or penalty, cost, expense or disbursement, which may be incurred or imposed, or asserted by any party and arising out of any condition, act or failure to act which occurred before [Insert date this clause was included in contract], in conjunction with the management and operation of [Insert name of facility], shall be deemed incurred under Contract No. [Insert number of prior contract].
Alternate II (DEC 2000). As prescribed in 970.3170 (b), add the following paragraph (c) to the basic clause in contracts with management and operating contractors not previously working at that particular site or facility:
(c) The Contractor has the duty to inspect the facilities and sites and timely identify to the Contracting Officer those conditions which it believes could give rise to a liability, obligation, loss, damage, penalty, fine, claim, action, suit, cost, expense, or disbursement or areas of actual or potential noncompliance with the terms and conditions of this contract or applicable law or regulation. The Contractor has the responsibility to take corrective action, as directed by the Contracting Officer and as required elsewhere in this contract.
(End of clause)
970.5232-1 Reduction or suspension of advance, partial, or progress payments upon finding of substantial evidence of fraud.
As prescribed in 970.3200-1-1, insert the following clause:
Reduction or Suspension of Advance, Partial, or Progress Payments (DEC 2000)
(a) The Contracting Officer may reduce or suspend further advance, partial, or progress payments to the Contractor upon a written determination by the Senior Procurement Executive that substantial evidence exists that the Contractor's request for advance, partial, or progress payment is based on fraud.
(b) The Contractor shall be afforded a reasonable opportunity to respond in writing.
(End of clause)
970.5232-2 Payments and advances.
As prescribed in 970.3270(a)(1), insert the following clause:
Payments and Advances (DEC 2000)
(a) Installments of fixed-fee. The fixed-fee payable under this contract shall become due and payable in periodic installments in accordance with a schedule determined by the Contracting Officer. Fixed-fee payments shall be made by direct payment or withdrawn from funds advanced or available under this contract, as determined by the Contracting Officer. The Contracting Officer may offset against any such fee payment the amounts owed to the Government by the Contractor, including any amounts owed for disallowed costs under this contract. No fixed-fee payment may be withdrawn against the payments cleared financing arrangement without prior written approval of the Contracting Officer.
(b) Payments on Account of Allowable Costs. The Contracting Officer and the Contractor shall agree as to the extent to which payment for allowable costs or payments for other items specifically approved in writing by the Contracting Officer (for example, negotiated fixed amounts) shall be made from advances of Government funds. When pension contributions are paid by the Contractor to the retirement fund less frequently than quarterly, accrued costs therefore shall be excluded from costs for payment purposes until such costs are paid. If pension contribution are paid on a quarterly or more frequent basis, accrual therefore may be included in costs for payment purposes, provided that they are paid to the fund within 30 days after the close of the period covered. If payments are not made to the fund within such 30-day period, pension contribution costs shall be excluded from cost for payment purposes until payment has been made.
(c) Special financial institution account - use. All advances of Government funds shall be withdrawn pursuant to a payments cleared financing arrangement prescribed by DOE in favor of the financial institution or, at the option of the Government, shall be made by direct payment or other payment mechanism to the Contractor, and shall be deposited only in the special financial institution account referred to in the Special Financial Institution Account Agreement, which is incorporated into this contract as Appendix - . No part of the funds in the special financial institution account shall be commingled with any funds of the Contractor or used for a purpose other than that of making payments for costs allowable and, if applicable, fees earned under this contract, negotiated fixed amounts, or payments for other items specifically approved in writing by the Contracting Officer. If the Contracting Officer determines that the balance of such special financial institution account exceeds the Contractor's current needs, the Contractor shall promptly make such disposition of the excess as the Contracting Officer may direct.
(d) Title to funds advanced. Title to the unexpended balance of any funds advanced and of any special financial institution account established pursuant to this clause shall remain in the Government and be superior to any claim or lien of the financial institution of deposit or others. It is understood that an advance to the Contractor hereunder is not a loan to the Contractor, and will not require the payment of interest by the Contractor, and that the Contractor acquires no right, title or interest in or to such advance other than the right to make expenditures therefrom, as provided in this clause.
(e) Financial settlement. The Government shall promptly pay to the Contractor the unpaid balance of allowable costs (or other items specifically approved in writing by the Contracting Officer) and fee upon termination of the work, expiration of the term of the contract, or completion of the work and its acceptance by the Government after -
(1) Compliance by the Contractor with DOE's patent clearance requirements; and
(2) The furnishing by the Contractor of -
(i) An assignment of the Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the Contractor in connection with the work under this contract, or other credits applicable to allowable costs under the contract;
(ii) A closing financial statement;
(iii) The accounting for Government-owned property required by the clause entitled “Property”; and
(iv) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract subject only to the following exceptions -
(A) Specified claims in stated amounts or in estimated amounts where the amounts are not susceptible to exact statement by the Contractor;
(B) Claims, together with reasonable expenses incidental thereto, based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided that such claims are not known to the Contractor on the date of the execution of the release; and provided further that the Contractor gives notice of such claims in writing to the Contracting Officer promptly, but not more than one
(1) year after the Contractor's right of action first accrues. In addition, the Contractor shall provide prompt notice to the Contracting Officer of all potential claims under this clause, whether in litigation or not (see Contract Clause, 48 CFR 970.5228-1, Insurance - Litigation and Claims);
(C) Claims for reimbursement of costs (other than expenses of the Contractor by reason of any indemnification of the Government against patent liability), including reasonable expenses incidental thereto, incurred by the Contractor under the provisions of this contract relating to patents; and
(D) Claims recognizable under the clause entitled, Nuclear Hazards Indemnity Agreement.
(3) In arriving at the amount due the Contractor under this clause, there shall be deducted -
(i) Any claim which the Government may have against the Contractor in connection with this contract; and
(ii) Deductions due under the terms of this contract and not otherwise recovered by or credited to the Government. The unliquidated balance of the special financial institution account may be applied to the amount due and any balance shall be returned to the Government forthwith.
(f) Claims. Claims for credit against funds advanced for payment shall be accompanied by such supporting documents and justification as the Contracting Officer shall prescribe.
(g) Discounts. The Contractor shall take and afford the Government the advantage of all known and available cash and trade discounts, rebates, allowances, credits, salvage, and commissions unless the Contracting Officer finds that action is not in the best interest of the Government.
(h) Collections. All collections accruing to the Contractor in connection with the work under this contract, except for the Contractor's fee and royalties or other income accruing to the Contractor from technology transfer activities in accordance with this contract, shall be Government property and shall be processed and accounted for in accordance with applicable requirements imposed by the Contracting Officer pursuant to the Laws, regulations, and DOE directives clause of this contract and, to the extent consistent with those requirements, shall be deposited in the special financial institution account or otherwise made available for payment of allowable costs under this contract, unless otherwise directed by the Contracting Officer.
(i) Direct payment of charges. The Government reserves the right, upon ten days written notice from the Contracting Officer to the Contractor, to pay directly to the persons concerned, all amounts due which otherwise would be allowable under this contract. Any payment so made shall discharge the Government of all liability to the Contractor therefore.
(j) Determining allowable costs. The Contracting Officer shall determine allowable costs in accordance with the Federal Acquisition Regulation subpart 31.2 and the Department of Energy Acquisition Regulation subpart 48 CFR 970.31 in effect on the date of this contract and other provisions of this contract.
(End of clause)
Alternate I (DEC 2000). As prescribed in 970.3270(a)(1)(i), if a separate fixed-fee is provided for a separate item of work, paragraph (a) of the basic clause should be modified to permit payment of the entire fixed-fee upon completion of that item.
Alternate II (DEC 2000). As prescribed in 970.3270(a)(1)(ii), when total available fee provisions are used, replace paragraph (a) of the basic clause with the following paragraph (a):
(a) Payment of Total available fee: Base Fee and Performance Fee. The base fee amount, if any, is payable in equal monthly installments. Total available fee amount earned is payable following the Government's Determination of Total Available Fee Amount Earned in accordance with the clause of this contract entitled “Total Available Fee: Base Fee Amount and Performance Fee Amount.” Base fee amount and total available fee amount earned payments shall be made by direct payment or withdrawn from funds advanced or available under this contract, as determined by the Contracting Officer. The Contracting Officer may offset against any such fee payment the amounts owed to the Government by the Contractor, including any amounts owed for disallowed costs under this contract. No base fee amount or total available fee amount earned payment may be withdrawn against the payments cleared financing arrangement without the prior written approval of the contracting officer.
Alternate III (DEC 2000). As prescribed in 970.3270(a)(1)(iii), the following paragraph (k) shall be included in management and operating contracts with integrated accounting systems:
(k) Review and approval of costs incurred. The Contractor shall prepare and submit annually as of September 30, a “Statement of Costs Incurred and Claimed” (Cost Statement) for the total of net expenditures accrued (i.e., net costs incurred) for the period covered by the Cost Statement. The Contractor shall certify the Cost Statement subject to the penalty provisions for unallowable costs as stated in sections 306(b) and (i) of the Federal Property and Administrative Services Act of 1949 (41 U.S.C. 256), as amended. DOE, after audit and appropriate adjustment, will approve such Cost Statement. This approval by DOE will constitute an acknowledgment by DOE that the net costs incurred are allowable under the contract and that they have been recorded in the accounts maintained by the Contractor in accordance with DOE accounting policies, but will not relieve the Contractor of responsibility for DOE's assets in its care, for appropriate subsequent adjustments, or for errors later becoming known to DOE.
Alternate IV (DEC 2000). As prescribed in 970.3270(a)(1)(iv), the following paragraph (k) shall be included in management and operating contracts without integrated accounting systems:
(k) Certification and penalties. The Contractor shall prepare and submit a “Statement of Costs Incurred and Claimed” (Cost Statement) for the total of net expenditures incurred for the period covered by the Cost Statement. It is anticipated that this will be an annual submission unless otherwise agreed to by the Contracting Officer. The Contractor shall certify the Cost Statement subject to the penalty provisions for unallowable costs as stated in sections 306(b) and (i) of the Federal Property and Administrative Services Act of 1949 (41 U.S.C. 256), as amended.
(End of clause)
970.5232-3 Accounts, records, and inspection.
As prescribed in 970.3270(a)(2), insert the following clause:
Accounts, Records, and Inspection (DEC 2010)
(a) Accounts. The Contractor shall maintain a separate and distinct set of accounts, records, documents, and other evidence showing and supporting: all allowable costs incurred; collections accruing to the Contractor in connection with the work under this contract, other applicable credits, negotiated fixed amounts, and fee accruals under this contract; and the receipt, use, and disposition of all Government property coming into the possession of the Contractor under this contract. The system of accounts employed by the Contractor shall be satisfactory to DOE and in accordance with generally accepted accounting principles consistently applied.
(b) Inspection and audit of accounts and records. All books of account and records relating to this contract shall be subject to inspection and audit by DOE or its designees in accordance with the provisions of Clause 970.5204-3, Access to and ownership of records, at all reasonable times, before and during the period of retention provided for in paragraph (d) of this clause, and the Contractor shall afford DOE proper facilities for such inspection and audit.
(c) Audit of subcontractors' records. The Contractor also agrees, with respect to any subcontracts (including fixed-price or unit-price subcontracts or purchase orders) where, under the terms of the subcontract, costs incurred are a factor in determining the amount payable to the subcontractor of any tier, to either conduct an audit of the subcontractor's costs or arrange for such an audit to be performed by the cognizant government audit agency through the Contracting Officer.
(d) Disposition of records. Except as agreed upon by the Government and the Contractor, all financial and cost reports, books of account and supporting documents, system files, data bases, and other data evidencing costs allowable, collections accruing to the Contractor in connection with the work under this contract, other applicable credits, and fee accruals under this contract, shall be the property of the Government, and shall be delivered to the Government or otherwise disposed of by the Contractor either as the Contracting Officer may from time to time direct during the progress of the work or, in any event, as the Contracting Officer shall direct upon completion or termination of this contract and final audit of accounts hereunder. Except as otherwise provided in this contract, including provisions of Clause 970.5204-3, Access to and Ownership of Records, all other records in the possession of the Contractor relating to this contract shall be preserved by the Contractor for a period of three years after final payment under this contract or otherwise disposed of in such manner as may be agreed upon by the Government and the Contractor.
(e) Reports. The Contractor shall furnish such progress reports and schedules, financial and cost reports, and other reports concerning the work under this contract as the Contracting Officer may from time to time require.
(f) Inspections. The DOE shall have the right to inspect the work and activities of the Contractor under this contract at such time and in such manner as it shall deem appropriate.
(g) Subcontracts. The Contractor further agrees to require the inclusion of provisions similar to those in paragraphs (a) through (g) and paragraph (h) of this clause in all subcontracts (including fixed-price or unit-price subcontracts or purchase orders) of any tier entered into hereunder where, under the terms of the subcontract, costs incurred are a factor in determining the amount payable to the subcontractor.
(h) Comptroller general.
(1) The Comptroller General of the United States, or an authorized representative, shall have access to and the right to examine any of the contractor's or subcontractor's directly pertinent records involving transactions related to this contract or a subcontract hereunder and to interview any current employee regarding such transactions.
(2) This paragraph may not be construed to require the Contractor or subcontractor to create or maintain any record that the Contractor or subcontractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(3) Nothing in this contract shall be deemed to preclude an audit by the Government Accountability Office of any transaction under this contract.
(i) Internal audit. The Contractor agrees to design and maintain an internal audit plan and an internal audit organization.
(1) Upon contract award, the exercise of any contract option, or the extension of the contract, the Contractor must submit to the Contracting Officer for approval an Internal Audit Implementation Design to include the overall strategy for internal audits. The Audit Implementation Design must describe -
(i) The internal audit organization's placement within the Contractor's organization and its reporting requirements;
(ii) The audit organization's size and the experience and educational standards of its staff;
(iii) The audit organization's relationship to the corporate entities of the Contractor;
(iv) The standards to be used in conducting the internal audits;
(v) The overall internal audit strategy of this contract, considering particularly the method of auditing costs incurred in the performance of the contract;
(vi) The intended use of external audit resources;
(vii) The plan for audit of subcontracts, both pre-award and post-award; and
(viii) The schedule for peer review of internal audits by other contractor internal audit organizations, or other independent third party audit entities approved by the DOE Contracting Officer.
(2) By each January 31 of the contract performance period, the Contractor must submit an annual audit report, providing a summary of the audit activities undertaken during the previous fiscal year. That report shall reflect the results of the internal audits during the previous fiscal year and the actions to be taken to resolve weaknesses identified in the contractor's system of business, financial, or management controls.
(3) By each June 30 of the contract performance period, the Contractor must submit to the Contracting Officer an annual audit plan for the activities to be undertaken by the internal audit organization during the next fiscal year that is designed to test the costs incurred and contractor management systems described in the internal audit design.
(4) The Contracting Officer may require revisions to documents submitted under paragraphs (i)(1), (i)(2), and (i)(3) of this clause, including the design plan for the internal audits, the annual report, and the annual internal audits.
(j) Remedies. If at any time during contract performance, the Contracting Officer determines that unallowable costs were claimed by the Contractor to the extent of making the contractor's management controls suspect, or the contractor's management systems that validate costs incurred and claimed suspect, the Contracting Officer may, in his or her sole discretion, require the Contractor to cease using the special financial institution account in whole or with regard to specified accounts, requiring reimbursable costs to be claimed by periodic vouchering. In addition, the Contracting Officer, where he or she deems it appropriate, may: Impose a penalty under 48 CFR 970.5242-1, Penalties for Unallowable Costs; require a refund; reduce the contractor's otherwise earned fee; and take such other action as authorized in law, regulation, or this contract.
(End of clause)
Alternate I (DEC 2000). As prescribed in 970.3270(a)(2), if the contract includes the clause at 48 CFR 52.215-11, Price Reduction for Defective Cost or Pricing Data - Modifications, the basic clause shall be modified as follows:
(a) Paragraph (a) of the basic clause shall be modified by adding the words “or anticipated to be incurred” after the words “allowable costs incurred.”
(b) Paragraph (g) of the basic clause shall be modified by adding the following:
The Contractor further agrees to include an “Audit” clause, the substance of which is the “Audit” clause set forth at 48 CFR 52.215-2, in each subcontract which does not include provisions similar to those in paragraph (a) through paragraph (g) and paragraph (h) of this clause, but which contains a “defective cost or pricing data” clause.
970.5232-4 Obligation of funds.
As prescribed in 970.3270(a)(3), insert the following clause:
Obligation of Funds (DEC 2000)
(a) Obligation of funds. The amount presently obligated by the Government with respect to this contract is ____ dollars ($____). Such amount may be increased unilaterally by DOE by written notice to the Contractor and may be increased or decreased by written agreement of the parties (whether or not by formal modification of this contract). Estimated collections from others for work and services to be performed under this contract are not included in the amount presently obligated. Such collections, to the extent actually received by the Contractor, shall be processed and accounted for in accordance with applicable requirements imposed by the Contracting Officer pursuant to the Laws, regulations, and DOE directives clause of this contract. Nothing in this paragraph is to be construed as authorizing the Contractor to exceed limitations stated in financial plans established by DOE and furnished to the Contractor from time to time under this contract.
(b) Limitation on payment by the Government. Except as otherwise provided in this contract and except for costs which may be incurred by the Contractor pursuant to the Termination clause of this contract or costs of claims allowable under the contract occurring after completion or termination and not released by the Contractor at the time of financial settlement of the contract in accordance with the clause entitled “Payments and Advances,” payment by the Government under this contract on account of allowable costs shall not, in the aggregate, exceed the amount obligated with respect to this contract, less the Contractor's fee and any negotiated fixed amount. Unless expressly negated in this contract, payment on account of those costs excepted in the preceding sentence which are in excess of the amount obligated with respect to this contract shall be subject to the availability of -
(1) Collections accruing to the Contractor in connection with the work under this contract and processed and accounted for in accordance with applicable requirements imposed by the Contracting Officer pursuant to the Laws, regulations, and DOE directives clause of this contract; and
(2) Other funds which DOE may legally use for such purpose, provided DOE will use its best efforts to obtain the appropriation of funds for this purpose if not otherwise available.
(c) Notices - Contractor excused from further performance. The Contractor shall notify DOE in writing whenever the unexpended balance of available funds (including collections available under paragraph (a) of this clause), plus the Contractor's best estimate of collections to be received and available during the ____ day period hereinafter specified, is in the Contractor's best judgment sufficient to continue contract operations at the programmed rate for only ____ days and to cover the Contractor's unpaid fee and any negotiated fixed amounts, and outstanding encumbrances and liabilities on account of costs allowable under the contract at the end of such period. Whenever the unexpended balance of available funds (including collections available under paragraph (a) of this clause), less the amount of the Contractor's fee then earned but not paid and any negotiated fixed amounts, is in the Contractor's best judgment sufficient only to liquidate outstanding encumbrances and liabilities on account of costs allowable under this contract, the Contractor shall immediately notify DOE and shall make no further encumbrances or expenditures (except to liquidate existing encumbrances and liabilities), and, unless the parties otherwise agree, the Contractor shall be excused from further performance (except such performance as may become necessary in connection with termination by the Government) and the performance of all work hereunder will be deemed to have been terminated for the convenience of the Government in accordance with the provisions of the Termination clause of this contract.
(d) Financial plans; cost and encumbrance limitations. In addition to the limitations provided for elsewhere in this contract, DOE may, through financial plans, such as Approved Funding Programs, or other directives issued to the Contractor, establish controls on the costs to be incurred and encumbrances to be made in the performance of the contract work. Such plans and directives may be amended or supplemented from time to time by DOE. The Contractor agrees -
(1) To comply with the specific limitations (ceilings) on costs and encumbrances set forth in such plans and directives;
(2) To comply with other requirements of such plans and directives; and
(3) To notify DOE promptly, in writing, whenever it has reason to believe that any limitation on costs and encumbrances will be exceeded or substantially underrun.
(e) Government's right to terminate not affected. The giving of any notice under this clause shall not be construed to waive or impair any right of the Government to terminate the contract under the provisions of the Termination clause of this contract.
(End of clause)
Alternate I (DEC 2000). As prescribed in 970.3270(a)(3), paragraph (d) of the clause may be omitted in contracts which, expressly or otherwise, provide a contractual basis for equivalent controls in a separate clause.
970.5232-5 Liability with respect to cost accounting standards.
As prescribed in 970.3270(a)(5), insert the following clause:
Liability With Respect to Cost Accounting Standards (DEC 2000)
(a) The Contractor is not liable to the Government for increased costs or interest resulting from its failure to comply with the clauses of this contract entitled, “Cost Accounting Standards,” and “Administration of Cost Accounting Standards,” if its failure to comply with the clauses is caused by the Contractor's compliance with published DOE financial management policies and procedures or other requirements established by the Department's Chief Financial Officer or Senior Procurement Executive.
(b) The Contractor is not liable to the Government for increased costs or interest resulting from its subcontractors' failure to comply with the clauses at 52.230-2, “Cost Accounting Standards,” and 52.230-6, “Administration of Cost Accounting Standards,” if the Contractor includes in each covered subcontract a clause making the subcontractor liable to the Government for increased costs or interest resulting from the subcontractor's failure to comply with the clauses; and the Contractor seeks the subcontract price adjustment and cooperates with the Government in the Government's attempts to recover from the subcontractor.
(End of clause)
970.5232-6 Strategic partnership project funding authorization.
As prescribed in 970.3270(a)(6), insert the following clause:
Strategic Partnership Project Funding Authorization (April 23, 2015)
Any uncollectible receivables resulting from the Contractor utilizing contractor corporate funding for reimbursable work shall be the responsibility of the Contractor, and the United States Government shall have no liability to the Contractor for the Contractor's uncollected receivables. The Contractor is permitted to provide advance payment utilizing contractor corporate funds for reimbursable work to be performed by the Contractor for a non-Federal entity in instances where advance payment from that entity is required under the Laws, regulations, and DOE directives clause of this contract and such advance cannot be obtained. The Contractor is also permitted to provide advance payment utilizing contractor corporate funds to continue reimbursable work to be performed by the Contractor for a Federal entity when the term or the funds on a Federal interagency agreement required under the Laws, regulations, and DOE directives clause of this contract have elapsed. The Contractor's utilization of contractor corporate funds does not relieve the Contractor of its responsibility to comply with all requirements for Strategic Partnership Projects applicable to this contract.
(End of clause)
970.5232-7 Financial management system.
As prescribed in 970.3270(b)(1), insert the following clause:
Financial Management System (DEC 2000)
The Contractor shall maintain and administer a financial management system that is suitable to provide proper accounting in accordance with DOE requirements for assets, liabilities, collections accruing to the Contractor in connection with the work under this contract, expenditures, costs, and encumbrances; permits the preparation of accounts and accurate, reliable financial and statistical reports; and assures that accountability for the assets can be maintained. The Contractor shall submit to DOE for written approval an annual plan for new financial management systems and/or subsystems and major enhancements and/or upgrades to the currently existing financial systems and/or subsystems. The Contractor shall notify DOE thirty (30) days in advance of any planned implementation of any substantial deviation from this plan and, as requested by the Contracting Officer, shall submit any such deviation to DOE for written approval before implementation.
(End of clause)
970.5232-8 Integrated accounting.
As prescribed in 970.3270(b)(2), insert the following clause:
Integrated Accounting (DEC 2000)
Integrated accounting procedures are required for use under this contract. The Contractor's financial management system shall include an integrated accounting system that is linked to DOE's accounts through the use of reciprocal accounts and that has electronic capability to transmit monthly and year-end self-balancing trial balances to the Department's Primary Accounting System for reporting financial activity under this contract in accordance with requirements imposed by the Contracting Officer pursuant to the Laws, regulations, and DOE directives clause of this contract.
(End of clause)
970.5235-1 Federally funded research and development center sponsoring agreement.
As prescribed in 970.3501-4, the contracting officer shall insert the following clause:
Federally Funded Research and Development Center Sponsoring Agreement (DEC 2010)
(a) Pursuant to 48 CFR 35.017-1, this contract constitutes the sponsoring agreement between the Department of Energy (DOE) and the Contractor, which establishes the relationship for the operation of a Department of Energy sponsored Federally Funded Research and Development Center (FFRDC).
(b) In the operation of this FFRDC, the Contractor may be provided access beyond that which is common to the normal contractual relationship, to Government and supplier data, including sensitive and proprietary data, and to Government employees and facilities needed to discharge its responsibilities efficiently and effectively. Because of this special relationship, it is essential that the FFRDC be operated in the public interest with objectivity and independence, be free from organizational conflicts of interest, and have full disclosure of its affairs to the Department of Energy.
(c) Unless otherwise provided by the contract, the Contractor may accept work from a nonsponsor (as defined in 48 CFR 35.017) in accordance with the requirements and limitations of the clause 48 CFR 970.5217-1, Strategic Partnership Projects Program.
(d) As an FFRDC, the Contractor shall not use its privileged information or access to government facilities to compete with the private sector. Specific guidance on restricted activities is contained in DOE Order 481.1C, Strategic Partnership Projects (Formerly Known as Work for Others (Non-Department of Energy Funded Work)), or successor version.
(End of clause)
970.5236-1 Government facility subcontract approval.
As prescribed at 48 CFR 970.3605-2, insert the following clause:
Government Facility Subcontract Approval (DEC 2000)
Upon request of the Contracting Officer and acceptance thereof by the Contractor, the Contractor shall procure, by subcontract, the construction of new facilities or the alteration or repair of Government-owned facilities at the plant. Any subcontract entered into under this paragraph shall be subject to the written approval of the Contracting Officer and shall contain the provisions relative to labor and wages required by law to be included in contracts for the construction, alteration, and/or repair, including painting and decorating, of a public building or public work.
(End of clause)
970.5237-2 [Reserved]
970.5242-1 Penalties for unallowable costs.
As prescribed in 970.4207-03-70, insert the following clause:
Penalties for Unallowable Costs (AUG 2009)
(a) Contractors which include unallowable cost in a submission for settlement for cost incurred, may be subject to penalties.
(b) If, during the review of a submission for settlement of cost incurred, the Contracting Officer determines that the submission contains an expressly unallowable cost or a cost determined to be unallowable prior to the submission, the Contracting Officer shall assess a penalty.
(c) Unallowable costs are either expressly unallowable or determined unallowable.
(1) An expressly unallowable cost is a particular item or type of cost which, under the express provisions of an applicable law, regulation, or this contract, is specifically named and stated to be unallowable.
(2) A cost determined unallowable is one which, for that Contractor -
(i) Was subject to a Contracting Officer's final decision and not appealed;
(ii) The Civilian Board of Contract Appeals or a court has previously ruled as unallowable; or
(iii) Was mutually agreed to be unallowable.
(d) If the Contracting Officer determines that a cost submitted by the Contractor in its submission for settlement of cost incurred is -
(1) Expressly unallowable, then the Contracting Officer shall assess a penalty in an amount equal to the disallowed cost allocated to this contract plus interest on the paid portion of the disallowed cost. Interest shall be computed from the date of overpayment to the date of repayment using the interest rate specified by the Secretary of the Treasury pursuant to Pub. L. 92-41 (85 Stat. 97); or
(2) Determined unallowable, then the Contracting Officer shall assess a penalty in an amount equal to two times the amount of the disallowed cost allocated to this contract.
(e) The Contracting Officer may waive the penalty provisions when -
(1) The Contractor withdraws the submission before the formal initiation of an audit of the submission and submits a revised submission;
(2) The amount of the unallowable costs allocated to covered contracts is $10,000 or less; or
(3) The Contractor demonstrates to the Contracting Officer's satisfaction that -
(i) It has established appropriate policies, personnel training, and an internal control and review system that provides assurances that unallowable costs subject to penalties are precluded from the Contractor's submission for settlement of costs; and
(ii) The unallowable costs subject to the penalty were inadvertently incorporated into the submission.
(End of clause)
970.5243-1 Changes.
As prescribed in 970.4302-1, the contracting officer shall insert the following clause in all management and operating contracts:
Changes (DEC 2000)
(a) Changes and adjustment of fee. The Contracting Officer may at any time and without notice to the sureties, if any, issue written directions within the general scope of this contract requiring additional work or directing the omission of, or variation in, work covered by this contract. If any such direction results in a material change in the amount or character of the work described in the “Statement of Work,” an equitable adjustment of the fee, if any, shall be made in accordance with the agreement of the parties and the contract shall be modified in writing accordingly. Any claim by the Contractor for an adjustment under this clause must be asserted in writing within 30 days from the date of receipt by the Contractor of the notification of change; provided, however, that the Contracting Officer, if it is determined that the facts justify such action, may receive and act upon any such claim asserted at any time prior to final payment under this contract. A failure to agree on an equitable adjustment under this clause shall be deemed to be a dispute within the meaning of the clause entitled “Disputes.”
(b) Work to continue. Nothing contained in this clause shall excuse the Contractor from proceeding with the prosecution of the work in accordance with the requirements of any direction hereunder.
(End of clause)
970.5244-1 Contractor purchasing system.
As prescribed in 970.4403 insert the following clause:
Contractor Purchasing System (AUG 2016)
(a) General. The Contractor shall develop, implement, and maintain formal policies, practices, and procedures to be used in the award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing system and methods shall be fully documented, consistently applied, and acceptable to the Department of Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which is appropriate to the value of the purchase and is adequate to establish the propriety of the transaction and the price paid. The Contractor's purchasing performance will be evaluated against such performance criteria and measures as may be set forth elsewhere in this contract. DOE reserves the right at any time to require that the Contractor submit for approval any or all purchases under this contract. The Contractor shall not purchase any item or service, the purchase of which is expressly prohibited by the written direction of DOE, and shall use such special and directed sources as may be expressly required by the DOE Contracting Officer. DOE will conduct periodic appraisals of the Contractor's management of all facets of the purchasing function, including the Contractor's compliance with its approved system and methods. Such appraisals will be performed through the conduct of Contractor Purchasing System Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through the Contractor's participation in the conduct of the Balanced Scorecard performance measurement and performance management system. The Contractor's approved purchasing system and methods shall include the requirements set forth in paragraphs (b) through (y) of this clause.
(b) Acquisition of utility services. Utility services shall be acquired in accordance with the requirements of 48 CFR subpart 970.41.
(c) Acquisition of real property. Real property shall be acquired in accordance with 48 CFR subpart 917.74.
(d) Advance notice of proposed subcontract awards. Advance notice shall be provided in accordance with 48 CFR 970.4401-3.
(e) Audit of subcontractors.
(1) The Contractor shall provide for -
(i) Periodic post-award audit of cost-reimbursement subcontractors at all tiers; and
(ii) Audits, where necessary, to provide a valid basis for pre-award or cost or price analysis.
(2) Responsibility for determining the costs allowable under each cost-reimbursement subcontract remains with the contractor or next higher-tier subcontractor. The Contractor shall provide, in appropriate cases, for the timely involvement of the Contractor and the DOE Contracting Officer in resolution of subcontract cost allowability.
(3) Where audits of subcontractors at any tier are required, arrangements may be made to have the cognizant Federal agency perform the audit of the subcontract. These arrangements shall be made administratively between DOE and the other agency involved and shall provide for the cognizant agency to audit in an appropriate manner in light of the magnitude and nature of the subcontract. In no case, however, shall these arrangements preclude determination by the DOE Contracting Officer of the allowability or unallowability of subcontractor costs claimed for reimbursement by the Contractor.
(4) Allowable costs for cost reimbursable subcontracts are to be determined in accordance with the cost principles of 48 CFR Part 31, appropriate for the type of organization to which the subcontract is to be awarded, as supplemented by 48 CFR part 931. Allowable costs in the purchase or transfer from contractor-affiliated sources shall be determined in accordance with 48 CFR 970.4402-3 and 48 CFR 31.205-26(e).
(f) Bonds and insurance.
(1) The Contractor shall require performance bonds in penal amounts as set forth in 48 CFR 28.102-2(a) for all fixed-priced and unit-priced construction subcontracts in excess of $150,000. The Contractor shall consider the use of performance bonds in fixed-price non-construction subcontracts, where appropriate.
(2) For fixed-price, unit-priced and cost reimbursement construction subcontracts in excess of $150,000, a payment bond shall be obtained on Standard Form 25A modified to name the Contractor as well as the United States of America as obligees. The penal amounts shall be determined in accordance with 48 CFR 28.102-2(b).
(3) For fixed-price, unit-priced and cost-reimbursement construction subcontracts greater than $25,000, but not greater than $100,000, the Contractor shall select two or more of the payment protections at 48 CFR 28.102-1(b), giving particular consideration to the inclusion of an irrevocable letter of credit as one of the selected alternatives.
(4) A subcontractor may have more than one acceptable surety in both construction and other subcontracts, provided that in no case will the liability of any one surety exceed the maximum penal sum for which it is qualified for any one obligation. For subcontracts other than construction, a co-surety (two or more sureties together) may reinsure amounts in excess of their individual capacity, with each surety having the required underwriting capacity that appears on the list of acceptable corporate sureties.
(g) Buy American. The Contractor shall comply with the provisions of the Buy American Act as reflected in 48 CFR 52.225-1 and 48 CFR 52.225-9. The Contractor shall forward determinations of non-availability of individual items to the DOE Contracting Officer for approval. Items in excess of $500,000 require the prior concurrence of the Head of Contracting Activity. If, however, the Contractor has an approved purchasing system, the Head of the Contracting Activity may authorize the Contractor to make determinations of non-availability for individual items valued at $500,000 or less.
(h) Construction and architect-engineer subcontracts.
(1) Independent Estimates. A detailed, independent estimate of costs shall be prepared for all construction work to be subcontracted.
(2) Specifications. Specifications for construction shall be prepared in accordance with the DOE publication entitled “General Design Criteria Manual.”
(3) Prevention of conflict of interest.
(i) The Contractor shall not award a subcontract for construction to the architect-engineer firm or an affiliate that prepared the design. This prohibition does not preclude the award of a “turnkey” subcontract so long as the subcontractor assumes all liability for defects in design and construction and consequential damages.
(ii) The Contractor shall not award both a cost-reimbursement subcontract and a fixed-price subcontract for construction or architect-engineer services or any combination thereof to the same firm where those subcontracts will be performed at the same site.
(iii) The Contractor shall not employ the construction subcontractor or an affiliate to inspect the firm's work. The contractor shall assure that the working relationships of the construction subcontractor and the subcontractor inspecting its work and the authority of the inspector are clearly defined.
(i) Contractor-affiliated sources. Equipment, materials, supplies, or services from a contractor-affiliated source shall be purchased or transferred in accordance with 48 CFR 970.4402-3.
(j) Contractor-subcontractor relationship. The obligations of the Contractor under paragraph (a) of this clause, including the development of the purchasing system and methods, and purchases made pursuant thereto, shall not relieve the Contractor of any obligation under this contract (including, among other things, the obligation to properly supervise, administer, and coordinate the work of subcontractors). Subcontracts shall be in the name of the Contractor, and shall not bind or purport to bind the Government.
(k) Government Property. The Contractor shall establish and maintain a property management system that complies with criteria in 48 CFR 970.5245-1, Property, and 48 CFR 52.245-1, Government Property.
(l) Indemnification. Except for Price-Anderson Nuclear Hazards Indemnity, no subcontractor may be indemnified except with the prior approval of the Senior Procurement Executive.
(m) Leasing of motor vehicles. Contractors shall comply with 48 CFR subpart 8.11 and 48 CFR subpart 908.11.
(n) [Reserved]
(o) Management, acquisition and use of information resources. Requirements for automatic data processing resources and telecommunications facilities, services, and equipment, shall be reviewed and approved in accordance with applicable DOE Orders and regulations regarding information resources.
(p) Priorities, allocations and allotments. Priorities, allocations and allotments shall be extended to appropriate subcontracts in accordance with the clause or clauses of this contract dealing with priorities and allocations.
(q) Purchase of special items. Purchase of the following items shall be in accordance with the following provisions of 48 CFR subpart 8.5, 48 CFR subpart 908.71, Federal Management Regulation 41 CFR part 102, and the Federal Property Management Regulation 41 CFR chapter 101:
(1) Motor vehicles - 48 CFR 908.7101
(2) Aircraft - 48 CFR 908.7102
(3) Security Cabinets - 48 CFR 908.7106
(4) Alcohol - 48 CFR 908.7107
(5) Helium - 48 CFR subpart 8.5
(6) Fuels and packaged petroleum products - 48 CFR 908.7109
(7) Coal - 48 CFR 908.7110
(8) Arms and Ammunition - 48 CFR 908.7111
(9) Heavy Water - 48 CFR 908.7121(a)
(10) Precious Metals - 48 CFR 908.7121(b)
(11) Lithium - 48 CFR 908.7121(c)
(12) Products and services of the blind and severely handicapped - 41 CFR 101-26.701
(13) Products made in Federal penal and correctional institutions - 41 CFR 101-26.702.
(r) Purchase versus lease determinations. Contractors shall determine whether required equipment and property should be purchased or leased, and establish appropriate thresholds for application of lease versus purchase determinations. Such determinations shall be made -
(1) At time of original acquisition;
(2) When lease renewals are being considered; and
(3) At other times as circumstances warrant.
(s) Quality assurance. Contractors shall provide no less protection for the Government in its subcontracts than is provided in the prime contract.
(t) Setoff of assigned subcontractor proceeds. Where a subcontractor has been permitted to assign payments to a financial institution, the assignment shall treat any right of setoff in accordance with 48 CFR 932.803.
(u) Strategic and critical materials. The Contractor may use strategic and critical materials in the National Defense Stockpile.
(v) Termination. When subcontracts are terminated as a result of the termination of all or a portion of this contract, the Contractor shall settle with subcontractors in conformity with the policies and principles relating to settlement of prime contracts in 48 CFR subparts 49.1, 49.2 and 49.3. When subcontracts are terminated for reasons other than termination of this contract, the Contractor shall settle such subcontracts in general conformity with the policies and principles in 48 CFR subparts 49.1, 49.2, 49.3 and 49.4. Each such termination shall be documented and consistent with the terms of this contract. Terminations which require approval by the Government shall be supported by accounting data and other information as may be directed by the Contracting Officer.
(w) Unclassified controlled nuclear information. Subcontracts involving unclassified uncontrolled nuclear information shall be treated in accordance with 10 CFR part 1017.
(x) Subcontract flowdown requirements. In addition to terms and conditions that are included in the prime contract which direct application of such terms and conditions in appropriate subcontracts, the Contractor shall include the following clauses in subcontracts, as applicable:
(1) Davis-Bacon clauses prescribed in 48 CFR 22.407.
(2) Foreign Travel clause prescribed in 48 CFR 952.247-70.
(3) Counterintelligence clause prescribed in 48 CFR 970.0404-4(a).
(4) Service Contract Act clauses prescribed in 48 CFR 22.1006.
(5) State and local taxes clause prescribed in 48 CFR 970.2904-1.
(6) Cost or pricing data clauses prescribed in 48 CFR 970.1504-3-1(b).
(y) Legal services. Contractor purchases of litigation and other legal services are subject to the requirements in 10 CFR part 719 and the requirements of this clause.
(End of clause)
970.5245-1 Property.
As prescribed in 970.4501-1(a), insert the following clause:
Property (AUG 2016)
(a) Furnishing of Government property. The Government reserves the right to furnish any property or services required for the performance of the work under this contract.
(b) Title to property. Except as otherwise provided by the Contracting Officer, title to all materials, equipment, supplies, and tangible personal property of every kind and description purchased by the Contractor, for the cost of which the Contractor is entitled to be reimbursed as a direct item of cost under this contract, shall pass directly from the vendor to the Government. The Government reserves the right to inspect, and to accept or reject, any item of such property. The Contractor shall make such disposition of rejected items as the Contracting Officer shall direct. Title to other property, the cost of which is reimbursable to the Contractor under this contract, shall pass to and vest in the Government upon
(1) issuance for use of such property in the performance of this contract, or (2) commencement of processing or use of such property in the performance of this contract, or (3) reimbursement of the cost thereof by the Government, whichever first occurs. Property furnished by the Government and property purchased or furnished by the Contractor, title to which vests in the Government, under this paragraph are hereinafter referred to as Government property. Title to Government property shall not be affected by the incorporation of the property into or the attachment of it to any property not owned by the Government, nor shall such Government property or any part thereof, be or become a fixture or lose its identity as personality by reason of affixation to any realty.
(c) Identification. To the extent directed by the Contracting Officer, the Contractor shall identify Government property coming into the Contractor's possession or custody, by marking and segregating in such a way, satisfactory to the Contracting Officer, as shall indicate its ownership by the Government.
(d) Disposition. The Contractor shall make such disposition of Government property which has come into the possession or custody of the Contractor under this contract as the Contracting Officer may direct during the progress of the work or upon completion or termination of this contract. The Contractor may, upon such terms and conditions as the Contracting Officer may approve, sell, or exchange such property, or acquire such property at a price agreed upon by the Contracting Officer and the Contractor as the fair value thereof. The amount received by the Contractor as the result of any disposition, or the agreed fair value of any such property acquired by the Contractor, shall be applied in reduction of costs allowable under this contract or shall be otherwise credited to account to the Government, as the Contracting Officer may direct. Upon completion of the work or the termination of this contract, the Contractor shall render an accounting, as prescribed by the Contracting Officer, of all government property which had come into the possession or custody of the Contractor under this contract.
(e) Protection of government property - management of high-risk property and classified materials.
(1) The Contractor shall take all reasonable precautions, and such other actions as may be directed by the Contracting Officer, or in the absence of such direction, in accordance with sound business practice, to safeguard and protect government property in the Contractor's possession or custody.
(2) In addition, the Contractor shall ensure that adequate safeguards are in place, and adhered to, for the handling, control and disposition of high-risk property and classified materials throughout the life cycle of the property and materials consistent with the policies, practices and procedures for property management contained in the Federal Property Management Regulations (41 CFR chapter 101), the Department of Energy (DOE) Property Management Regulations (41 CFR chapter 109), and other applicable Regulations.
(3) High-risk property is property, the loss, destruction, damage to, or the unintended or premature transfer of which could pose risks to the public, the environment, or the national security interests of the United States. High-risk property includes proliferation sensitive, nuclear related dual use, export controlled, chemically or radioactively contaminated, hazardous, and specially designed and prepared property, including property on the militarily critical technologies list.
(f) Risk of loss of Government property. (1)(i) The Contractor shall not be liable for the loss or destruction of, or damage to, Government property unless such loss, destruction, or damage was caused by any of the following -
(A) Willful misconduct or lack of good faith on the part of the Contractor's managerial personnel;
(B) Failure of the Contractor's managerial personnel to take all reasonable steps to comply with any appropriate written direction of the Contracting Officer to safeguard such property under paragraph (e) of this clause; or
(C) Failure of contractor managerial personnel to establish, administer, or properly maintain an approved property management system in accordance with paragraph (i)
(1) of this clause.
(ii) If, after an initial review of the facts, the Contracting Officer informs the Contractor that there is reason to believe that the loss, destruction of, or damage to the government property results from conduct falling within one of the categories set forth above, the burden of proof shall be upon the Contractor to show that the Contractor should not be required to compensate the government for the loss, destruction, or damage.
(2) In the event that the Contractor is determined liable for the loss, destruction or damage to Government property in accordance with (f)(1) of this clause, the Contractor's compensation to the Government shall be determined as follows:
(i) For damaged property, the compensation shall be the cost of repairing such damaged property, plus any costs incurred for temporary replacement of the damaged property. However, the value of repair costs shall not exceed the fair market value of the damaged property. If a fair market value of the property does not exist, the Contracting Officer shall determine the value of such property, consistent with all relevant facts and circumstances.
(ii) For destroyed or lost property, the compensation shall be the fair market value of such property at the time of such loss or destruction, plus any costs incurred for temporary replacement and costs associated with the disposition of destroyed property. If a fair market value of the property does not exist, the Contracting Officer shall determine the value of such property, consistent with all relevant facts and circumstances.
(3) The portion of the cost of insurance obtained by the Contractor that is allocable to coverage of risks of loss referred to in paragraph (f)(1) of this clause is not allowable.
(g) Steps to be taken in event of loss. In the event of any damage, destruction, or loss to Government property in the possession or custody of the Contractor with a value above the threshold set out in the Contractor's approved property management system, the Contractor -
(1) Shall immediately inform the Contracting Officer of the occasion and extent thereof,
(2) Shall take all reasonable steps to protect the property remaining, and
(3) Shall repair or replace the damaged, destroyed, or lost property in accordance with the written direction of the Contracting Officer. The Contractor shall take no action prejudicial to the right of the Government to recover therefore, and shall furnish to the Government, on request, all reasonable assistance in obtaining recovery.
(h) Government property for Government use only. Government property shall be used only for the performance of this contract.
(i) Property Management - (1) Property Management System.
(i) The Contractor shall establish, administer, and properly maintain an approved property management system of accounting for and control, utilization, maintenance, repair, protection, preservation, and disposition of Government property in its possession under the contract. The Contractor's property management system shall be submitted to the Contracting Officer for approval and shall be maintained and administered in accordance with sound business practice, applicable Federal Property Management Regulations and Department of Energy Property Management Regulations, and such directives or instructions which the Contracting Officer may from time to time prescribe.
(ii) In order for a property management system to be approved, it must provide for -
(A) Comprehensive coverage of property from the requirement identification, through its life cycle, to final disposition;
(B) [Reserved]
(C) Full integration with the Contractor's other administrative and financial systems; and
(D) A method for continuously improving property management practices through the identification of best practices established by “best in class” performers.
(iii) Approval of the Contractor's property management system shall be contingent upon the completion of the baseline inventory as provided in subparagraph (i)(2) of this clause.
(2) Property Inventory. (i) Unless otherwise directed by the Contracting Officer, the Contractor shall within six months after execution of the contract provide a baseline inventory covering all items of Government property.
(ii) If the Contractor is succeeding another contractor in the performance of this contract, the Contractor shall conduct a joint reconciliation of the property inventory with the predecessor contractor. The Contractor agrees to participate in a joint reconciliation of the property inventory at the completion of this contract. This information will be used to provide a baseline for the succeeding contract as well as information for closeout of the predecessor contract.
(j) The term “contractor's managerial personnel” as used in this clause means the Contractor's directors, officers and any of its managers, superintendents, or other equivalent representatives who have supervision or direction of -
(1) All or substantially all of the Contractor's business; or
(2) All or substantially all of the Contractor's operations at any one facility or separate location to which this contract is being performed; or
(3) A separate and complete major industrial operation in connection with the performance of this contract; or
(4) A separate and complete major construction, alteration, or repair operation in connection with performance of this contract; or
(5) A separate and discrete major task or operation in connection with the performance of this contract.
(k) The Contractor shall include this clause in all cost reimbursable subcontracts.
(End of clause)
Alternate I (AUG 2016).As prescribed in 970.4501-1(b), when the award is to a nonprofit contractor, replace paragraph (j) of the basic clause with the following paragraph (j):
(j) The term “contractor's managerial personnel” as used in this clause means the Contractor's directors, officers and any of its managers, superintendents, or other equivalent representatives who have supervision or direction of all or substantially all of -
(1) The Contractor's business; or
(2) The Contractor's operations at any one facility or separate location at which this contract is being performed; or
(3) The Contractor's Government property system and/or a Major System Project as defined in DOE Order 413.3B, or successor version (Version in effect on effective date of contract).