APPENDIX C Table Of Contents

APPENDIX C Table Of Contents

Lowest Price d Technically Acceptable

Source Selection Process

C-1 Purpose

The purpose of this Appendix is to assist acquisition professionals in making sound decisions for determining whether to use a Tradeoff or LPTA source selection process to obtain best value. LPTA is an available source selection approach. However, a lack of understanding of when it is an appropriate choice may result in misapplication of this process. This Appendix includes “side-by-side” comparisons of LPTA vs. Tradeoff characteristics, methodologies, common concerns associated with each, tips and best practices.

C-2 References

1. Federal Acquisition Regulation Part 15 https://www.acquisition.gov/browsefar

2. Defense Federal Acquisition Regulation Supplement Part 215 http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

3. Army Federal Acquisition Regulation Supplement Part 5115 https://spcs3.kc.army.mil/asaalt/procurement/AFARS/Home.aspx

4. Department of Defense Source Selection Procedures http://www.acq.osd.mil/dpap/policy/policyvault/USA007183-10-DPAP.pdf

5. Better Buying Power http://bbp.dau.mil/

6. Under Secretary of Defense (Acquisition, Technology, And Logistics) (USD(ATL)) memorandum, subject: Appropriate Use of Lowest Price Technically Acceptable Source Selection Process and Associated Contract Type (March 04, 2015) http://bbp.dau.mil/docs/Appropriate_Use_of_Lowest_Priced_Technically_Acceptable_Source_Selec_Process_Assoc_Con_Type.pdf

7. ASA (ALT) memorandum, subject: Use of Lowest Price Technically Acceptable Source Selection Process (April 20, 2015), issued as Policy Alert #15-73: Use of Lowest Price Technically Acceptable Source Selection Process (April 21, 2015) https://spcs3.kc.army.mil/asaalt/procurement/PARC/PARC.aspx

8. Government Accountability Office Cases - Various

C-3 Purpose

Policy Perspective on Use of LPTA. The DOD Source Selection Procedures includes a separate Appendix C devoted to the LPTA Source Selection Process (reference 4). The use of LPTA has increased but not necessarily successfully in all cases, causing concern by both the Government and Industry Partners. Some specific concerns include:

Government officials are not able to adequately define the requirement, and therefore not able to adequately define technical acceptability.

Awarded prices are unrealistically low.

Incumbent contractors underbid at unreasonable or unrealistic prices.

Winning contractors cannot attract qualified employees.

Contractors are unable to perform at acceptable quality levels.

Endangering the security of government resources, to include information systems and networks, and personnel.

To provide greater fidelity on the appropriate use of LPTA, Better Buying Power (BBP) 2.0 (reference 5) set basic guidance for use of LPTA. Subsequent memorandum issued by the Under Secretary of Defense (Acquisition, Technology and Logistics) (reference 6) and reinforced by the Assistant Secretary of the Army (Acquisition, Logistics and Technology) (reference 7), stress that:

LPTA has a clear, but limited place in the source selection “best value” continuum. Used in appropriate circumstances and combined with effective competition and proper contract type, LPTA can drive down costs and provide the best value solution. LPTA offers a streamlined and simplified source selection approach to rapidly procure the commercial and non-complex services we need to support the Warfighter. If not applied appropriately, however, the Department can miss an opportunity to secure an innovative, cost-effective solution to meet Warfighter needs to help maintain our technological advantage.

C-4 What is Risk?

No matter whether using Tradeoff or LPTA, the focus should always be on identifying the key discriminators based upon market research and the assessment of risk. Risk, as it pertains to source selection, is the potential for unsuccessful contract performance. Increased risk comes with numerous possible complicating factors including:

While it is impossible to eliminate all risk, the objective is to reduce or mitigate risks by selecting the best value offeror through a sound source selection evaluation process.

The Government’s risk is increased where the criteria (standards) are set too low. The source selection team must work together to ensure the PWS/SOW/Specification is complete and reflects the Government’s needs at the right quality level.

Identifying key discriminators that are linked to the critical requirements where key risks lie is one of the most important steps in the process of determining the right process to achieve best value.

If the evaluation criteria cannot be objectively defined strictly on the basis of acceptable/unacceptable, and a clear “standard of proof” be determined for each, the procurement is not a candidate for the LPTA process.

NOTE: If some, but not all, evaluation criteria fit the LPTA requirements a combination approach may be a consideration.

Caution If the customer/requiring activity is concerned about improving performance, LPTA is not an appropriate source selection approach.

C-5 Quick Comparison of Best Value Basics

The FAR on Trade off vs LPTA Source Selection Processes

C-6 Comparing Key Characteristics

C-7 Rating Methodologies

Rating Methodologies. Tradeoff and LPTA each have a unique rating methodology as summarized below.

C-8 Common Concerns For Each Methodology

It is important to understand and consider the benefits and possible down-sides of each approach in order to ensure you select the one that will help you achieve best value for the customer/program. Below are some of the common concerns.

C-9 Tips And Best Practices For Using LPTA

Below are some general tips and agreed-upon best practices to guide application of LPTA techniques.

C-10 LPTA Requirement and Standard of Proof Samples

LPTA REQUIREMENT/STANDARD OF PROOF SAMPLES

SUPPLIES

PROFESSIONAL SERVICES

Corporate

SIMPLE SERVICES

Criteria: All illumination must be provided by LED lights drawing a maximum of 5 amps (C.13.1)

Question on Technical Information Questionnaire (TIQ): Are all the lights of the Light Emitting Diode (LED) type and a maximum combined draw of 5 amps?

Standard of Proof: Manufacturer’s spec sheets showing LED characteristics.

Criteria: Five program analysts with a Bachelor’s Degree in a business discipline with a minimum of 10 years of program analyst experience or a post-graduate degree in a business discipline (Master’s or Doctorate) with a minimum of 5 years of program analyst experience.

Question on Technical Information Questionnaire (TIQ ):Do all of the program analyst executives possess either a Bachelor’s Degree in a business discipline with a minimum of 10 years of program analyst experience or a post-graduate degree in a business discipline (Master’s or Doctorate) with a minimum of 5 years of program analyst experience?

Standard of proof: Resume showing degree and years of experience as specified.

Criteria: Contractor shall possess storage facility to store all equipment listed in attachment X within 15 miles of Arsenal (15 radial miles from geographic center of Arsenal).

Question on Technical Information Questionnaire (TIQ): Does the Offeror possess storage facility that meets 15 mile requirement listed in Section C.4.4?

Standard of proof: Provide evidence of ownership or lease of facility that meets requirements listed in Section C.4.4.

Criteria: The vehicle must be transportable by C-17, C-5, and military sea and rail IAW ATPD XXXX Section 3.1.X and 3.1.X

Question on Technical Information Questionnaire (TIQ): Does the width of the vehicle exceed 96”?

Standard of Proof: CAD drawing with all outside dimensions noted.

Criteria: Five Communications Personnel with minimum of 4 years of experience with military tactical or satellite communications system.

Question on Technical Information Questionnaire (TIQ): Do all of the candidates have a minimum of 4 years of experience with military tactical or satellite communications system?

Standard of Proof: Resumes showing years of experience as specified.

Criteria: Offerors must possess the equipment required to refinish a 3,500 sq. ft. wood floor.

Question on Technical Information Questionnaire (TIQ): Does the Offeror own or lease equipment that will be used to refinish a 3,500 sq. ft. wood floor IAW C.4.5?

Standard of Proof: Specify list of equipment and certificates of ownership for equipment or lease agreements.

Requirement: Engine must be able to be operated with JP-8 (C.1.3)

Question on TIQ: Does the vehicle run on JP-8 IAW ATPD- XXXX Section 3.3.5.1?

Standard of Proof: Manufacturer’s spec sheet for engine.

C-11 Flow Chart For Selection of Best Value Methodology

Image 0

C-12 LPTA – Sample Evaluator Write-Up

Describe the Evaluation Process in the Source Selection Plan – Then Fully Document the Evaluation In Accordance With the SSP

Use a checklist or evaluation form such as the one below:

Evaluation narrative write-up below provides an example of both ‘Acceptable” and “Unacceptable” proposal responses: